| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 21 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | 1 | 1 | Review |
|---|
| Construction & progress | 1 | – | – | Red flag |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 446 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Jr Greenwich Phase 4 in the interactive atlas
Approval or registration
Land use converted
Deputy Commissioner, Bangalore Urban District · Survey 79/1A1
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of JR Housing Developers Pvt Ltd · Survey 79/1A1
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · Kodathi Panchayath · Survey 79/1A1
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan BDA/TPM/PRL-13/2020-21
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/301221/004612
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | Not verified yet | |
| Title report dated | 19 Nov 2021 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 79/1a1 | |
|---|---|---|
| Land extent, Sy 79/1a1 | 3 Acre, 7 Gunta | |
| Area on the KGIS map | Not verified yet | |
| Khata | A Khatha · Kodathi Panchayath · 18 Sep 2020 | |
| Sale deed | Dated 18 Sep 2020 | |
| Sale deed in favour of | JR Housing Developers Pvt Ltd | |
| Building plan (BDA) | Sanctioned 8 Nov 2021 · No. BDA/TPM/PRL-13/2020-21 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| KSPCB | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 7 Nov 2024 |
| Land conversion | Converted 20 Aug 2020 · Deputy Commissioner, Bangalore Urban District | |
|---|---|---|
| Survey numbers | 79/1a1 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
| Orion Heights | about 0.5 km | Locked | |
|---|---|---|---|
| Mana Jardin Neo | 1.0 km | Locked | |
| 63 Degree East - Tower E | 1.2 km | Locked | |
| Sobha Royal Pavilion Phase 8 - Wing 15 | 1.5 km | Locked |
| Jr Greenwich Phase 4 This project | This project is the point the others are measured from | 7 Nov 2024 | Not filed | Not verified yet |
|---|---|---|---|---|
| Orion Heights | about 0.5 km | 31 Dec 2025 | 65% (106 of 163) | Locked |
| Mana Jardin Neo | 1.0 km | 30 Dec 2032 | 27% (22 of 82) | Locked |
| 63 Degree East - Tower E |
Map of the ground within about 950 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Valley / drain buffer, at the filed pin | Review |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 400 kV, 180 m from the filed location | Clear |
| Nearest government-flagged flood location | 2.6 km, Doddakannelli | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 1.9 km to the north, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | 370 m to the east, Kodathi Lake | |
| Height above nearest drain | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 7 Nov 2024 | Red flag |
| Work began, as filed | 8 Nov 2021 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹3.67 Cr 71%Development · ₹1.50 Cr 29%
| Estimated cost | ₹5.17 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | Karnataka Bank Ltd. · Nehru Nagar | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 14 | |
|---|---|---|
| Marked completed | 8 | |
| Past promised date, not completed | 5 | Clear |
| Complaints filed against the promoter | 0 | |
| Other phases under this promoter name | 12 | |
| With a filed extension or completion | 7 (7 completed, 0 extended) | |
| Average schedule slip | 8 months early |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BDA) | Sanctioned 8 Nov 2021 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Karnataka Bank Ltd. · Nehru Nagar | |
Map of 9 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Mana Jardin Neo, price locked; 63 Degree East - Tower E, price locked; Sobha Royal Pavilion Phase 8 - Wing 15, price locked; Sobha Royal Pavilion Phase 6 - Wing 10 And 11, price locked; Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14, price locked; Birla Evara, price locked; Satori Residence By Genurise, price locked; Assetz Ren & Rei, price locked; Adarsh Rosewood, price locked.
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | 1.5 km | Locked |
|---|
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | 1.5 km | Locked |
|---|
| Birla Evara | 2.0 km | Locked |
|---|
| Satori Residence By Genurise | 2.9 km | Locked |
|---|
| Haven Phase 2 | about 3 km | Locked |
|---|
| Assetz Muse & Maison | about 3.5 km | Locked |
|---|
| Assetz Ren & Rei | 3.6 km | Locked |
|---|
| Adarsh Rosewood | 3.6 km | Locked |
|---|
| 1.2 km |
| 31 Dec 2026 |
| 100% (399 of 399) |
| Locked |
| Sobha Royal Pavilion Phase 8 - Wing 15 | 1.5 km | 30 Jun 2026 | 100% (113 of 113) | Locked |
|---|
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | 1.5 km | 30 Jun 2026 | 100% (151 of 151) | Locked |
|---|
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | 1.5 km | 30 Jun 2026 | 100% (227 of 227) | Locked |
|---|
| Rent, 4BHK, 3 km | ₹96,000 /mo · 7 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹62,500 /mo · 42 listings | |
| Rent, 2BHK, 3 km | ₹41,000 /mo · 79 listings | |
| Rent, 1BHK, 3 km | ₹22,000 /mo · 19 listings | |
| Rent per sq ft, 3 km | ₹40.0 /mo, as listed · 81 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 86 (36 with an approximate location) | |
|---|---|---|
| Flats in them | 31,063 | |
| Booked | 16,247 of 31,063 (52%) | |
| Unsold | 14,816 | |
| Booked a month, pooled | 472 flats | |
| Months to sell, pooled | 31 months |
Map of storm drains, lakes and government-flagged flood locations within about 950 m of the site.
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | 890 m | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 1.9 km to the north, secondary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 5.5 km, Kadubeesanahalli | |
| Kempegowda Airport | 34.2 |
| MG Road (CBD) | 15.6 |
| Manyata Tech Park | 20.0 |
| ITPL, Whitefield | 10.8 |
| Ecospace, Bellandur ORR | 5.5 |
| Electronic City Ph 1 | 7.2 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 520 m to the north-west |