Overview
JP Lavender Block-A
Part ofJP Lavender2 phases, 100 flats
Overview
Part ofJP Lavender2 phases, 100 flats
Overview
Part ofJP Lavender2 phases, 100 flats

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | ||
| 10xLapsed · completion date passed | M/S. MAZ-RD BUILDERS AND DEVELOPERS PRIVATE LIMITED | Apartment | – | Sep 2024 |
| A.S.R.S ParadiseLapsed · completion date passed | A.S. Builders | Apartment | – | Jan 2021 |
| Aadya HeightsLapsed · completion date passed | WHITEWINDS CONSTRUCTIONS PRIVATE LIMITED | Apartment | 917–1,080 sqft carpet (as filed) | Dec 2025 |
| Aakriti EmeraldActive · 51% built | AAKRITI PROJECTS | Apartment | 694–1,137 sqft carpet (as filed) | Aug 2028 |
| Aakruthi NestActive · 35% built | KRITI BUILDERS AND DEVELOPERS | Apartment | 608–837 sqft carpet (as filed) | Dec 2028 |
| Aban DesireRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Apartment | 801–1,054 sqft carpet (as filed) | Dec 2028 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 54 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| – |
| Not verified |
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | 1 | Review |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Adarsh ParadiseActive · 87% built | A1 BUILDERS | Apartment | 668–924 sqft carpet (as filed) | Dec 2026 |
| Adithya RicaCompleted (regulator flag) | ADITHYA CONSTRUCTIONS | Apartment | 769 sqft carpet (as filed) | Completed |
8 of 264 other projects in Old Madras Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open JP Lavender Block-A in the interactive atlas
Transfer of the land
Sale deed
Survey 288/5, 288/10, 288/11
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 288/5, 288/10, 288/11
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 288/5, 288/10, 288/11
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Office Bengaluru · Survey 288/5
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Office Bengaluru · Survey 288/10
K-RERA filing, land schedule
Approval or registration
Land use converted
Dc Office Bengaluru · Survey 288/11
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · City Municipality Hoskote · Survey 288/10
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · City municipality Hoskote · Survey 288/11
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · City municipality, Hosakote · Survey 288/5
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Local Planning Authority · plan HSK-LBPAS-10656/23-24/BP
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1250/304/PR/180524/006898
K-RERA registration
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 4 Apr 2024 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Page 1
Page 1 of 3 of the survey sketch. Filed with K-RERA: JOINT Sketch, 3 pages, not in English.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 288/5, 288/10, 288/11 | |
|---|---|---|
| Land extent, Sy 288/5 | 25 Guntas | |
| Land extent, Sy 288/10 | 18.5 Guntas | |
| Land extent, Sy 288/11 | 3 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 4,704 sq m | |
| Khata | E Khatha · City municipality, Hosakote · 25 Jan 2024; E Khatha · City Municipality Hoskote · 25 Jan 2024; E Khatha · City municipality Hoskote · 25 Jan 2024 | |
| Sale deed | Dated 3 Feb 1976 | |
| Building plan (Local Planning Authority) | Sanctioned 15 Mar 2024 · No. HSK-LBPAS-10656/23-24/BP | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2026 |
| Land conversion | 3 of 3 parcels converted | |
|---|---|---|
| Sy 288/5 | Converted 19 Mar 2020 · DC Office Bengaluru | |
| Sy 288/10, 288/11 | Converted 17 Dec 2021 · DC Office Bengaluru | |
| Survey numbers | 288/5 · 288/10 · 288/11 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
2BHK · avg 75 m² 52.6%3BHK · avg 100 m² 47.4%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 40 | 804 |
| 3BHK | 36 | 1,074 |
| Sold, Q2 2026-27 | 33 / 76 | |
|---|---|---|
| Unsold, Q2 2026-27 | 43 | |
| Months to sell, derived from filed bookings | 43 months |
| JP Lavender Block-A This project | This project is the point the others are measured from | 31 Dec 2026 | 43% (33 of 76) | Not verified yet |
|---|---|---|---|---|
| One Residences At Sobha One World Ph4 W7 And 8 | about 1 km | 30 Sep 2033 | 22% (98 of 440) | Locked |
| One Residences At Sobha One World Ph5 W9,10,11 | about 1 km | 28 Feb 2033 | 62% (449 of 721) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 7 km, SAI BABA ASHRAM KADUGODI | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, Dakshina Pinakini, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| Swimming Pool, built | 0% | |
| Power Backup, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.11 (84 covered spaces for 76 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 62 m
Across Hosakote, the water table sat 22.6 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 62 m, and it recovered 4.9 m over the year.
| Groundwater | Hosakote taluk average, July 2023: 22.6 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 22.6 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (City municipality Hoskote) | |
| Nearest city water main | Not verified yet | |
As the promoter reported itPossession date in the agreement

| Main structure | 100% · planned by 2 Mar 2025 | |
|---|---|---|
| Electrical and plumbing finishing | 100% · planned by 2 Mar 2026 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 80% | |
| Completion, accountant | 68% of the estimated cost spent | |
| Possession, agreement | 31 Dec 2026 | |
|---|---|---|
| Schedule end | 30 Dec 2026 | |
| RERA completion date | 31 Dec 2026 | |
| Work began, as filed | 1 Apr 2024 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14.95 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 30 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 2 Apr 2024 · site inspected 30 Mar 2024 | |
| Engineer's certificate, registration | Dated 2 Apr 2024 | |
| Chartered accountant's certificate, registration | Dated 2 May 2024 | |
| Chartered accountant, Form 4 | Dated 7 Jul 2026 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹9.41 Cr 23.4%Development · ₹30.72 Cr 76.6%
| Estimated cost | ₹40.13 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹30.29 Cr | |
| Cost incurred | ₹27.27 Cr (68% of the estimate) | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (33) 43.4%Unsold (43) 56.6%
| Sold, Q3 2025-26 | 24 / 76 · 52 available | |
|---|---|---|
| Sold, Q4 2025-26 | 19 / 76 · 57 available | |
| Sold, Q1 2026-27 | 30 / 76 · 46 available | |
| Sold, Q2 2026-27 | 33 / 76 · 43 available | |
| Unsold, Q2 2026-27 | 43 | |
| Sold in Q4 2025-26 | 5 bookings cancelled or corrected (24 → 19 sold) | |
| Sold in Q1 2026-27 | 11 | |
| Sold in Q2 2026-27 | 3 | |
| Flats booked, Form 4 Q4 2025-26 | 28 |
| Escrow bank | Axis Bank · Hoskote | |
|---|---|---|
| Designated account, collected | ₹1.04 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹14.1 L in Q2 2026-27 (14% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 5 | |
|---|---|---|
| Marked completed | 0 | |
| Past promised date, not completed | 1 | Clear |
| Complaints filed against the promoter | 0 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 4 Apr 2024 | Review |
| Building plan | Sanctioned 15 Mar 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Axis Bank · Hoskote | |

| Riqueza Siri | about 2 km | Locked |
|---|
| Triaxis Splendour + | about 3 km | Locked |
|---|
| Godrej Woodscapes | about 3.5 km | Locked |
|---|
| Sowparnika Euphoria in the East | about 3.5 km | Locked |
|---|
| Sattva Songbird | about 4 km | Locked |
|---|
| Neighbourhood Tree Park | about 4 km | Locked |
|---|
| Definer Upper Deck | about 5 km | Locked |
|---|
| Chaithanya Sankhya | about 5 km | Locked |
|---|
| One Residences At Sobha One World Ph6 W12,13,14 | about 1 km | 31 Aug 2032 | 63% (452 of 721) | Locked |
|---|
| Godrej Parkshire (Hoskote) | about 1.5 km | 31 Dec 2030 | 54% (614 of 1,132) | Locked |
|---|
| Riqueza Siri | about 2 km | 30 Nov 2027 | 52% (66 of 128) | Locked |
|---|
| Triaxis Splendour + | about 3 km | 31 Dec 2026 | 57% (59 of 104) | Locked |
|---|
| Projects within 4 km, counted | 36 (36 with an approximate location) | |
|---|---|---|
| Flats in them | 13,956 | |
| Booked | 8,547 of 13,956 (61%) | |
| Unsold | 5,409 | |
| Booked a month, pooled | 260 flats | |
| Months to sell, pooled | 21 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, Dakshina Pinakini, primary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 7.5 km, Whitefield | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 17.5 |
| MG Road (CBD) | 21.5 |
| Manyata Tech Park | 17.5 |
| ITPL, Whitefield | 9.5 |
| Ecospace, Bellandur ORR | 18.5 |
| Electronic City Ph 1 | 27 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 2.5 km to the west | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km, named Hoskote on OpenStreetMap |