Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 42 Queens SquareCompleted (regulator flag) | GRS INFRA | Plot | – | Completed |
| 77 EastLapsed · completion date passed | MODERN SPAACES | Apartment | – | Jan 2023 |
| 77 East Phase 2 By Modern Spaaces VenturesLapsed · completion date passed | MODERN SPAACES | Apartment | 1,010 sqft carpet (as filed) | Dec 2022 |
| 302 WestCompleted · OC 30-08-2023 | MODERN SPAACES VENTURES | Apartment | 735–1,398 sqft carpet (as filed) | Completed |
| 312 WestLapsed · completion date passed | MODERN SPAACES CONSTRUCTIONS | Apartment | 604 sqft carpet (as filed) | Apr 2022 |
| Aban DazzleRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Rowhouse | 2,040 sqft carpet (as filed) | Dec 2028 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 14 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Abhee Kings CourtCompleted · OC 26-05-2026 | ABHEE VENTURES PVT LTD | Apartment | 836–1,124 sqft carpet (as filed) | Completed |
| Abhee TranquilaActive · 85% built | Abhee Ventures | Plot | 1,200–1,500 sqft | Dec 2026 |
8 of 173 other projects in Sarjapur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Jhanavi Noreste in the interactive atlas
Approval or registration
Land use converted
DC OFFICE BENGALURU URBAN · Survey 113/2, 113/3, 113/4, 113/5 and 1 more
K-RERA filing, land schedule
Covers 113/3 only
Transfer of the land
Sale deed
in favour of M/S. JHANAVI HEIGHTS PRIVATE LIMITED · Survey 113/3
K-RERA filing, land schedule
Covers 113/2, 113/4, 113/5, 113/6 only
Transfer of the land
Sale deed
in favour of M/S. YASH VALUE SPACES & 7 OTHERS · Survey 113/2, 113/4, 113/5, 113/6
K-RERA filing, land schedule
Covers 113/4 only
Approval or registration
Khata issued
E Khatha · GRAMA PANCHAYAT DEVELOPMENT AUTHORITY · Survey 113/4
K-RERA filing, land schedule
Covers 113/2, 113/3, 113/5, 113/6 only
Approval or registration
Khata issued
E Khatha · GRAMA PANCHAYAT DEVELOPMENT AUTHORITY · Survey 113/2, 113/3, 113/5, 113/6
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BMRDA · plan APA/CC/269-2021-22
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/140622/004981
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 113/2, 113/3, 113/4, 113/5, 113/6 | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 5,969 sq m | |
| Khata | E Khatha · GRAMA PANCHAYAT DEVELOPMENT AUTHORITY · 23 Jun 2021; E Khatha · GRAMA PANCHAYAT DEVELOPMENT AUTHORITY · 25 Feb 2021 | |
| Sale deed | Dated 25 Feb 2021 | |
| Sale deed in favour of | M/S. YASH VALUE SPACES & 7 OTHERS, M/S. JHANAVI HEIGHTS PRIVATE LIMITED | |
| Title deed | Sy 13/4 | |
| Building plan (BMRDA) | Sanctioned 23 Nov 2021 · No. APA/CC/269-2021-22 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Mar 2025 |
| Land conversion | Converted 16 Jan 2021 · DC OFFICE BENGALURU URBAN | |
|---|---|---|
| Survey numbers | 113/2 · 113/3 · 113/4 · 113/5 · 113/6 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
68 – 2BHK · avg 72 m² 60.7%44 – 3BHK · avg 82 m² 39.3%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 44 – 3BHK | 44 | 886 |
| 68 – 2BHK | 68 | 771 |
| Bilva Phase-II By Bhavisha Homes | about 1.5 km | Locked | |
|---|---|---|---|
| Nambiar District 25 Phase 2 | about 2 km | Locked | |
| Coevolve Florenza | about 2.5 km | Locked | |
| Engrace 3 | about 3 km | Locked | |
| Engrace Vista |
| Jhanavi Noreste This project | This project is the point the others are measured from | 31 Mar 2025 | Not filed | Not verified yet |
|---|---|---|---|---|
| Bilva Phase-II By Bhavisha Homes | about 1.5 km | 30 Apr 2027 | 39% (89 of 226) | Locked |
| Nambiar District 25 Phase 2 | about 2 km | 31 Aug 2030 | 86% (705 of 816) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 5.5 km, Gunjur | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · CLUB HOUSE, COMMUNITY HALL, INDOOR SPORTS FACILITY & GYM · SEWAGE TREATMENT PLANT (STP) | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.19 (133 covered spaces for 112 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 28.7 m
Across Anekal, the water table sat 21.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 28.7 m, and it recovered 3.3 m over the year.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 21.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, Other | |
| Nearest city water main | Not verified yet | |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |
| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | Completed, occupancy certificate 18 Mar 2024 | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 31 Mar 2025 | |
|---|---|---|
| Schedule end | 15 Feb 2025 | |
| RERA completion date | 31 Mar 2025 | |
| Completion date, agreement | 31 Mar 2025 | |
| Work began, as filed | 1 Mar 2022 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14.95 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 40 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect's certificate, registration | Dated 5 Jan 2022 | |
| Chartered accountant's certificate, registration | Dated 25 Jan 2022 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹4.68 Cr 16.6%Development · ₹23.45 Cr 83.4%
| Estimated cost | ₹28.13 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹23.45 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (84) 75%Unsold (28) 25%
| Flats sold, at completion | 84 | |
|---|---|---|
| Flats unsold, at completion | 28 | |
| Flats in the phase | 112 |
| Escrow bank | HDFC · ELECTRONIC CITY | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BMRDA) | Sanctioned 23 Nov 2021 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | HDFC · ELECTRONIC CITY | |
| about 3 km |
| Locked |
| Engrace 4 | about 3 km | Locked |
|---|
| Suyug's Saffron | about 3 km | Locked |
|---|
| Leafy Avenue | about 3 km | Locked |
|---|
| Vasudharini Nest | about 4 km | Locked |
|---|
| Jeevan's Allure | about 4.5 km | Locked |
|---|
| Leafy Delight | about 5 km | Locked |
|---|
| Royal Nest | about 5 km | Locked |
|---|
| Coevolve Florenza | about 2.5 km | 31 Dec 2027 | 48% (149 of 309) | Locked |
|---|
| Engrace 3 | about 3 km | 1 Jun 2026 | 100% (76 of 76) | Locked |
|---|
| Engrace Vista | about 3 km | 30 Dec 2028 | 46% (181 of 392) | Locked |
|---|
| Engrace 4 | about 3 km | 31 Dec 2026 | 100% (145 of 145) | Locked |
|---|
| Projects within 4 km, counted | 66 (66 with an approximate location) | |
|---|---|---|
| Flats in them | 21,325 | |
| Booked | 11,866 of 21,325 (56%) | |
| Unsold | 9,459 | |
| Booked a month, pooled | 333 flats | |
| Months to sell, pooled | 28 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 10 km, Kodibeesanahalli | |
| Kempegowda Airport | 35 |
| MG Road (CBD) | 20.5 |
| Manyata Tech Park | 23.5 |
| ITPL, Whitefield | 11.5 |
| Ecospace, Bellandur ORR | 10.5 |
| Electronic City Ph 1 | 11.5 |