Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | 1 | – | – | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 1410 The ResidencesCompleted (regulator flag) | Hitin Property Developments | Apartment | 1,550 sqft carpet (as filed) | Completed |
| A.N. ComfortsCompleted · OC 30-12-2019 | D. Anand Naidu | Apartment | – | Completed |
| AayodhyaLapsed · completion date passed | UTOCORP | Apartment | 285 sqft carpet (as filed) | Jun 2024 |
| AiekyaCompleted · OC 18-08-2025 | Avaneesh Ventures | Apartment | 1,129 sqft carpet (as filed) | Completed |
| Aikyam Emerald GroveCompleted (regulator flag) | AIKYAM VENTURES | Plot | – | Completed |
| Amberstone ElanzaActive · 63% built | SRIVARI VENTURES | Apartment | 804–1,161 sqft carpet (as filed) | Dec 2028 |
| Amberstone Illumina |
Title & ownership
Approvals
Disputes & cases
Contract & costs
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 20 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 4 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 4 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Location & risks | – | 1 | 1 | Review |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| SRIVARI DWELLINGS |
| Apartment |
| 793–1,071 sqft carpet (as filed) |
| Dec 2028 |
| Amidst NatureExtended to 20-07-2027 | CLIMATE CONNECTIONS | Plot | ~1,500–2,800 sqft (estimate: filed carpet plus 25%) | Jul 2025 |
8 of 151 other projects in Kanakapura Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Essence Of Earth in the interactive atlas
₹99 for this report opens Title & ownership and Disputes & cases for this project, yours to read for good.
| Building plan (Local Planning Authority) | Sanctioned 4 Nov 2022 · No. 18/2016-17/1784 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| KSPCB | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 1 | |
| RERA completion date | 31 Mar 2026 |
| Land conversion | 6 of 6 parcels converted | |
|---|---|---|
| Sy 24/2, 25/2, 27/3, 26/1 | Converted 8 Sep 2015 · DC Office, Bangalore | |
| Sy 26/2, 27/4 (P) | Converted 13 Jul 2016 · DC Office, Bangalore | |
| Survey numbers | 24/2 · 25/2 · 27/3 · 26/1 · 26/2 · 27/4 (P) |
₹99 for this report opens Title & ownership and Disputes & cases for this project, yours to read for good.
| Forfeiture, agreement | Not verified yet | |
|---|---|---|
| Forfeiture, allotment letter | Deducted on cancelling the allotment, within 15 days: nothing; 16 to 30 days: 1% of the cost of the unit; 31 to 60 days: 1.5% of the cost of the unit; after 61 days: 2% of the cost of the unit |
|---|
| Transfer fee | 5% of the price | |
|---|---|---|
| Holding charge | Not verified yet | |
| Maintenance included | Not verified yet | |
| Harivishram | about 3 km | Locked | |
|---|---|---|---|
| Sattva Springs | about 3.5 km | Locked | |
| Axis Amarissa | about 4.5 km | Locked | |
| Jhanavi Trishul Alaska | 8.8 km | Locked | |
| Mahindra Eden Phase-2 | about 10 km | Locked |
| Essence Of Earth This project | This project is the point the others are measured from | 31 Mar 2026 | Not filed | Not verified yet |
|---|---|---|---|---|
| Harivishram | about 3 km | 31 Mar 2027 | 100% (152 of 152) | Locked |
| Sattva Springs | about 3.5 km | 18 Sep 2027 | 38% (25 of 66) | Locked |
| Axis Amarissa | about 4.5 km |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | 85% Residential (main), 12% Transport & communication | |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 66 kV, 210 m from the filed location | Clear |
| Nearest government-flagged flood location | 9.3 km, Mantri Lake view Appartment Next to Talagattapura Lake | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 900 m to the east, Suvarnamukhi, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | 180 m to the north-west, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
| Kitchen handover | Not verified yet | |
|---|---|---|
| Sewage plant | Sewage treatment plant | |
| Power backup | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 31 Mar 2026 | |
| Work began, as filed | 1 Mar 2024 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Not verified yet | |
| Sewage plant | Sewage treatment plant | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect's certificate, registration | Dated 29 Jun 2024 | |
| Chartered accountant's certificate, registration | Dated 1 Jul 2024 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹26.52 Cr 77.6%Development · ₹7.66 Cr 22.4%
| Estimated cost | ₹34.18 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹5.97 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | Bank of Baroda · Palace orchards | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 1 | |
| Other phases under this promoter name | 263 | |
|---|---|---|
| With a filed extension or completion | 119 (85 completed, 34 extended) | |
| Average schedule slip | 10 months |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan | Sanctioned 4 Nov 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Bank of Baroda · Palace orchards | |
| Sattva Forest Ridge | 10.1 km | Locked |
|---|
| Srivara Vasudha | about 10.5 km | Locked |
|---|
| Platinum Landmark | about 11 km | Locked |
|---|
| Good Earth Cadence | 11.1 km | Locked |
|---|
| Good Earth Ochre | 11.6 km | Locked |
|---|
| 31 Dec 2029 |
| 28% (23 of 81) |
| Locked |
| Jhanavi Trishul Alaska | 8.8 km | 30 Sep 2028 | 32% (47 of 148) | Locked |
|---|
| Mahindra Eden Phase-2 | about 10 km | 30 Jul 2027 | 100% (250 of 250) | Locked |
|---|
| Sattva Forest Ridge | 10.1 km | 31 Dec 2029 | 75% (304 of 407) | Locked |
|---|
| Projects within 4 km, counted | 7 (6 with an approximate location) | |
|---|---|---|
| Flats in them | 1,434 | |
| Booked | 586 of 1,434 (41%) | |
| Unsold | 848 | |
| Booked a month, pooled | 13 flats | |
| Months to sell, pooled | 64 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | 9.5 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 900 m to the east, Suvarnamukhi, secondary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 8.6 km, Silk Institute | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 50.7 |
| MG Road (CBD) | 23.4 |
| Manyata Tech Park | 31.2 |
| ITPL, Whitefield | 33.5 |
| Ecospace, Bellandur ORR | 24.5 |
| Electronic City Ph 1 | 19.7 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 380 m to the south-east, named Somanahalli Substation on OpenStreetMap |