Overview
Overview
Overview
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Aaptha LandmarkLapsed · completion date passed | AAPTHA VENTURES | Apartment | – | Nov 2021 |
| Adarsh PinecourtLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | 382–1,141 sqft carpet (as filed) | Mar 2026 |
| Adarsh PinecourtWithdrawn | Nusrath Unisa | Apartment | – | Nov 2023 |
| Adarsh TranqvilleLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | – | Mar 2026 |
| Adarsh Wisteria Phase 1Lapsed · completion date passed | VARIN INFRA PROJECTS PRIVATE LIMITED | Apartment | – | Aug 2023 |
| AlanovilleCompleted (regulator flag) | Goyal Hariyana Realty | Apartment | 2,251 sqft carpet (as filed) | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
| Amigo PalacioActive · 40% built | AMIGO SHELTERS PVT LTD | Apartment | 1,044–1,480 sqft carpet (as filed) | Mar 2028 |
| Amigo RegencyCompleted · OC 24-08-2021 | AMIGO SHELTERS PVT LTD | Apartment | – | Completed |
8 of 161 other projects in Hennur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Cyprus Oaks is not plotted on the interactive atlas: its filing gives no coordinate precise enough to place a single building, only the surrounding locality.
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| SOBHA Victoria Park Phase 1 | about 0.5 km, to a locality centre | Locked | |
|---|---|---|---|
| Nava Skanda Bellavita | about 1 km, to a locality centre | Locked | |
| The Pearl Paradise | about 1.5 km, to a locality centre | Locked | |
| Vkk Grand | about 2 km, to a locality centre | Locked |
| Cyprus Oaks This project | This project is the point the others are measured from | Not on the filing | Not filed | Not verified yet |
|---|---|---|---|---|
| SOBHA Victoria Park Phase 1 | about 0.5 km, to a locality centre | 31 Dec 2027 | 93% (280 of 300) | Locked |
| Nava Skanda Bellavita | about 1 km, to a locality centre | 31 Dec 2029 | 18% (63 of 360) | Locked |
| Nearest storm drain | about 0.5 km from the locality centre, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km from the locality centre, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Not verified yet | |
| Nearest city water main | Not verified yet | |
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km from the locality centre, secondary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | Not verified yet | |
| Landfill or waste transfer station | None within 3 km of the locality centre | |
|---|---|---|
| Sewage treatment plant | about 1.5 km from the locality centre, named Horamavu Agara 20MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | about 2 km from the locality centre | |
| Crematorium | None within 3 km of the locality centre | |
| Prison | None within 3 km of the locality centre | |
| Electrical substation | about 0.5 km from the locality centre |
| Radiance Floresta | about 2.5 km, to a locality centre | Locked |
|---|
| Sattva La Vita | about 2.5 km, to a locality centre | Locked |
|---|
| Brr North Excellency Phase I | about 3 km, to a locality centre | Locked |
|---|
| Adarsh Pinecourt | about 3 km, to a locality centre | Locked |
|---|
| Sobha City Athena | about 3.5 km, to a locality centre | Locked |
|---|
| Sumadhura Solea | about 3.5 km, to a locality centre | Locked |
|---|
| Legacy Saviero | about 4 km, to a locality centre | Locked |
|---|
| Sumadhura Epitome | about 4 km, to a locality centre | Locked |
|---|
| The Pearl Paradise | about 1.5 km, to a locality centre | 31 Dec 2026 | 72% (23 of 32) | Locked |
|---|
| Vkk Grand | about 2 km, to a locality centre | 30 Jun 2027 | 49% (59 of 120) | Locked |
|---|
| Radiance Floresta | about 2.5 km, to a locality centre | 31 May 2028 | 100% (65 of 65) | Locked |
|---|
| Sattva La Vita | about 2.5 km, to a locality centre | 12 Jul 2026 | 32% (20 of 63) | Locked |
|---|