Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 1 Lakh Multi Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| A.R RuthviLapsed · completion date passed | G.RAVINDRAKUMAR & M.K.ASHOKA | Plot | ~1,200–1,500 sqft (estimate: filed carpet plus 25%) | Dec 2025 |
| A.R Ruthvi Phase 2Filed as completed · no completion certificate on record | T MANJUNATHA | Plot | ~1,200–1,500 sqft (estimate: filed carpet plus 25%) | Feb 2024 |
| Ag Varaha ValleyApplied for completion 23/01/2026 | ABHISHEK . A | Plot | ~1,230–1,500 sqft (estimate: filed carpet plus 25%) | Aug 2025 |
| Arvind LakeviewActive · 90% built | Arvind Builders | Plot | ~1,200–4,000 sqft (estimate: filed carpet plus 25%) | Dec 2027 |
| Arvind Orchids |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 9 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Location & risks | – | 2 | – | Review |
|---|
| Construction & progress | 1 | – | – | Red flag |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | – | Review |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Arvind Builders |
| Plot |
| ~1,200–1,680 sqft (estimate: filed carpet plus 25%) |
| Dec 2023 |
| Ashwasurya LegacyRegistered · no quarterly update yet | M/s. Suryakalpa Ventures | Plot | ~1,200–2,220 sqft (estimate: filed carpet plus 25%) | Dec 2029 |
| B.T.G LayoutApplied for completion 11/03/2023 | SHARADAMMA | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Aug 2021 |
8 of 59 other projects in West Bengaluru, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Cm 1 Lakh Multistorey Bengaluru Housing Programme in the interactive atlas
Approval or registration
Khata issued
E Khatha · Government of Karnataka · Survey 2
K-RERA filing, land schedule
Approval or registration
Land use converted
Government of Karnataka · Survey 2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Local Planning Authority · plan NPA\LAO\54/2020-2021
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/309/PR/250322/004786
K-RERA registration ·
Approval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 5 Jan 2022 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
| Side | Schedule in the EC | KGIS neighbours |
|---|---|---|
| North | EC schedule not read yet | Survey 22 (J.I.Govindapura) |
| East | EC schedule not read yet | road |
| South | EC schedule not read yet | Survey 4, 17 (J.I.Govindapura) |
| West | EC schedule not read yet | Survey 1, 27 (J.I.Govindapura) |
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Matched plots on the KGIS map | 63,852 sq m | |
| Land area filed with K-RERA | 20,234 sq m | |
| Filed area as a share of the KGIS plots' area | 32% | |
| Village, hobli and taluk on the KGIS map | J.I.Govindapura, Dasanapura-1 hobli, Bangalore-North taluk | |
| Sketch dimensions | Not verified yet | |
| Sanctioned plan area | Not verified yet | |
| Mutation entry | Not verified yet | |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Survey numbers | 02 | |
|---|---|---|
| Land extent, Sy 02 | 05A 00G | |
| Area on the KGIS map | 63,852 sq m, 1 of 1 filed survey numbers | |
| Land area of this registration | 20,234 sq m | |
| Khata | E Khatha · Government of Karnataka · 22 Sep 2018 |
| Building plan (Local Planning Authority) | Sanctioned 10 Jan 2022 · No. NPA\LAO\54/2020-2021 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| KSPCB | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 6 Mar 2024 |
| Land conversion | Converted 4 May 2020 · Government of Karnataka | |
|---|---|---|
| Survey numbers | 02 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
1BHK · 30 m² 100%
| Type | Flats | Carpet per flat (sq ft) |
|---|---|---|
| 1BHK | 701 | 323 |
| Vruksha Greens | 8.9 km | Locked | |
|---|---|---|---|
| Shriram Solitaire | about 11 km | Locked | |
| Rubby Castle 1 | about 11 km | Locked | |
| Assetz Miru & Miyo | about 11.5 km | Locked | |
| Century Kindle Phase 1 | 11.7 km | Locked |
| Cm 1 Lakh Multistorey Bengaluru Housing Programme This project | This project is the point the others are measured from | 6 Mar 2024 | Not filed | Not verified yet |
|---|---|---|---|---|
| Vruksha Greens | 8.9 km | 30 Jun 2027 | 30% (24 of 80) | Locked |
| Shriram Solitaire | about 11 km | 15 May 2026 | 100% (269 of 269) | Locked |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Agriculture | Review |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 7.8 km, Siddeswara Layout | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 920 m to the east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 530 m to the west, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · Power Backup · Water and Sanitation | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.10 (67 covered spaces for 701 units) | |
| Sewage plant | Sewage treatment plant | |
| Power backup | Declared by the promoter | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 25 Dec 2023 | |
| RERA completion date | 6 Mar 2024 | Red flag |
| Work began, as filed | 7 Mar 2019 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 24.45 m filed, 5 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles | Ceramic tiles (walls) | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 49.65 sq m | |
| Sewage plant | Sewage treatment plant | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹60.7 L 1.1%Development · ₹56.65 Cr 98.9%
| Estimated cost | ₹57.26 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | Canara Bank · Bangalore SPLSD Govt buisness branch 6349 | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 23 | |
|---|---|---|
| Marked completed | 0 | |
| Past promised date, not completed | 23 | Review |
| Complaints filed against the promoter | 4 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 5 Jan 2022 | Review |
| Building plan | Sanctioned 10 Jan 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Canara Bank · Bangalore SPLSD Govt buisness branch 6349 | |
| about 11 km |
| 30 Apr 2029 |
| 25% (8 of 32) |
| Locked |
| Assetz Miru & Miyo | about 11.5 km | 31 Mar 2031 | 6% (20 of 350) | Locked |
|---|
| Century Kindle Phase 1 | 11.7 km | 14 Mar 2031 | 73% (336 of 458) | Locked |
|---|
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 26.8 m
Across Bengaluru North, the water table sat 22.7 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 26.8 m, and it fell 4.9 m over the year.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 22.7 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | 7.9 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 920 m to the east, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 7.6 km, Madavara | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 28.0 |
| MG Road (CBD) | 22.6 |
| Manyata Tech Park | 19.6 |
| ITPL, Whitefield | 33.8 |
| Ecospace, Bellandur ORR | 32.6 |
| Electronic City Ph 1 | 39.6 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 2.0 km to the east | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |