Sold165 / 165At the completion filing, 23 Sep 2023
Sold in the latest quarterCompleted
Funding
Estimated cost
Loan & collateral
Can it be financed?
Value, 3BHK ANot verified yet
Max loan, 3BHK ANot verified yet
Borrower marginNot verified yet
Developer's project loanNot verified yet
Value & LTV
3BHK A
Not verified yet
Calculation
Not verified yet
Conditions
Collateral checks
Data room
Documents filed for this project
Documents filed55On K-RERA
Available55100% of filed
K-RERA only0
Approvals with a validity dateNone read
Approvals & NOCs
1 pageAvailable
6 pagesAvailable
6 pagesAvailable
Available
3 pagesAvailable
11 pagesAvailable
Available
2 pagesAvailable
8 pagesAvailable
Available
Source: K-RERA project page and the documents filed there, as read by us. 8 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Unlock this full report₹99 for this report · opens Disputes & casesUnlock
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Cansa Dhiya is not plotted on the interactive atlas: its filing gives no coordinate precise enough to place a single building, only the surrounding locality.
Not verified yet
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate filed with K-RERA
Page 1
Page 1 of 1 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate, 1 page, not in English.
No survey sketch is listed on this phase's K-RERA filing
Sketch, sanction and mutation vs KGIS map
Not verified yet
Land record
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
about 0.5 km from the locality centre, tertiary drain
Nearest lake, tank or pond
about 0.5 km from the locality centre, Panathur Lake
Height above nearest drain
Not verified yet
Amenities
Specification and Form 5
Not verified yet
Around it
Water
Groundwater, Bengaluru East taluk average
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
Water at a glance
Groundwater
Bengaluru East taluk average, July 2023: 27.3 m below ground
What it means
Not verified yet
Water below ground
27.3 m, the taluk average
Through the year
Not verified yet
Water supply, as filed
Self development
Nearest city water main
Not verified yet
Distances
Measured from the site
Height above nearest drain
Not verified yet
Nearest drain
about 0.5 km from the locality centre, tertiary drain
Ground level
Not verified yet
Metro, operational
Not verified yet
Metro, under construction
Not verified yet
Connectivity
Road distance from the site
Not verified yet
Six city anchors · OSRM, no traffic
Not verified yet
Nuisances
Distance from the site
Locality only filed: no distance from the site to show
DOSL nuisance layer
Landfill or waste transfer station
None within 3 km of the locality centre
Sewage treatment plant
about 1 km from the locality centre, named Bellandur Amani 90MLD Sewage Treatment Plant on OpenStreetMap
Quarry
None within 3 km of the locality centre
Crematorium
None within 3 km of the locality centre
Prison
None within 3 km of the locality centre
Electrical substation
about 1 km from the locality centre, named Sobha Dream Acres Substation on OpenStreetMap
Quarterly return
Main structure
Not verified yet
Electrical and plumbing finishing
Not verified yet
Internal roads
Not verified yet
Club house
Not verified yet
Completion
Completed, occupancy certificate 8 Jul 2020
Completion, accountant
Not verified yet
Dates
Dates
Filed dates
Possession, agreement
Not verified yet
Schedule end
28 Feb 2020
RERA completion date
7 Apr 2021
Work began, as filed
6 Jul 2017
Specified structure
What the promoter specified · not an inspection
Not verified yet
Specification sheet, page 1
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.