| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 65 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | 3 | 1 | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 3 | Clear |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| 3 Little BirdsRegistered · no quarterly update yet | Zenso Little Birds Projects LLP | Apartment | 724 sqft carpet (as filed) | Sep 2026 |
| Adarsh Palm Acres - Phase 1-Part ALapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | 1,604 sqft carpet (as filed) | Nov 2023 |
| Adarsh Palm Acres - Phase 1-Part AFiled as completed · no completion certificate on record | Bangalore Best Realty Private Limited | Apartment | – | Nov 2023 |
| Adarsh Palm Acres - Phase 1-Part BLapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | 2,906 sqft carpet (as filed) | Nov 2023 |
| Adarsh Palm Acres - Phase 1-Part BLapsed · completion date passed | Bangalore Best Realty Private Limited | Apartment | 2,906 sqft carpet (as filed) | Nov 2023 |
| Adarsh Palm Acres - Phase 2-Part ALapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | – | Nov 2023 |
| Adarsh Palm Acres - Phase 2-Part BLapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | 3,111 sqft carpet (as filed) | Nov 2023 |
| Adarsh Palm Acres (Phase III)Active · 3% built | Adarsh Developers | Villa | 3,150–5,687 sqft | 2028 |
8 of 67 other projects in Bagalur, A to Z. Status is taken from each project's own filing.
All 73 projects in Bagalur → · Assetz Property Group's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Assetz Sora & Saki in the interactive atlas
Transfer of the land
Sale deed
in favour of Netra Software Technologies (P) Ltd · Survey 150200201200322634
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of Netra Software Technologies Pvt Ltd · Survey 150200201101020117
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Gram Panchayath Bagalur · Survey 150200201200322634
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Village panchayat · Survey 150200201101020117
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
KIADB · plan DO3-KIADB-00018/23-24/BP
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/309/PR/060324/006692
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 12 Jan 2024 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 150200201200322634, 150200201101020117 | |
|---|---|---|
| Land extent, Sy 150200201200322634 | 29,145 sq m | |
| Land extent, Sy 150200201101020117 | 4,370 sq m | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 23,598 sq m | |
| Khata | E Khatha · Gram Panchayath Bagalur · 26 Sep 2023; E Khatha · Village panchayat · 16 Oct 2023 | |
| Sale deed | Dated 8 Jun 2022 | |
| Sale deed in favour of | Netra Software Technologies (P) Ltd, Netra Software Technologies Pvt Ltd | |
| Building plan (KIADB) | Sanctioned 15 Feb 2024 · No. DO3-KIADB-00018/23-24/BP | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/199/2023 · issued 11 Sep 2023 | Clear |
| Environmental clearance | SEIAA 121 CON 2023 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Sep 2028 |
| Land conversion | Declared not converted | |
|---|---|---|
| Survey numbers | 150200201200322634 · 150200201101020117 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
3BHK · avg 107 m² 59.8%Studio · avg 16 m² 20.1%2BHK · avg 93 m² 20.1%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 72 | 996 |
| 3BHK | 214 | 1,154 |
| Studio | 72 | 174 |
| Sold, Q2 2026-27 | 314 / 358 | |
|---|---|---|
| Unsold, Q2 2026-27 | 44 | |
| Months to sell, derived from filed bookings | Too few bookings to project (1 flat booked in 9 months) |
| Assetz Sora & Saki Phase 2 | 870 m | Locked | |
|---|---|---|---|
| Assetz Sora & Saki Phase 3 | 1.0 km | Locked | |
| Kumar Plumeria | about 3 km | Locked | |
| Birla Trimaya | about 5 km | Locked |
| Assetz Sora & Saki This project | This project is the point the others are measured from | 30 Sep 2028 | 88% (314 of 358) | Not verified yet |
|---|---|---|---|---|
| Assetz Sora & Saki Phase 2 | 870 m | 31 Jul 2029 | 38% (242 of 634) | Locked |
| Assetz Sora & Saki Phase 3 | 1.0 km | 30 Apr 2029 | 30% (92 of 304) | Locked |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Agriculture | Review |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 220 kV, 10 m from the site | Clear |
| Nearest government-flagged flood location | 9.5 km, Shankrappa Layout, MAruthi nagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 1.1 km to the south, Ponnaiyar, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | 430 m to the south-west, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Air Conditioning - Provision only for units and selected amenities | |
|---|---|---|
| Club House, built | 0% | Review |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Water & Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.90 (322 covered spaces for 358 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it

| Main structure | 75% · planned by 30 Jun 2026 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 29 Feb 2028 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 80% | |
| Completion, accountant | 71.8% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 30 Sep 2028 | |
| RERA completion date | 30 Sep 2028 | |
| Work began, as filed | 1 Apr 2024 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 57.84 m filed, 2 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, May 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/199/2023 · issued 11 Sep 2023 | |
| Environmental clearance | SEIAA 121 CON 2023 | |
| Architect, quarterly | Form 5 · Jan 2026, May 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 22 Feb 2024 · site inspected 1 Feb 2024 | |
| Chartered accountant's certificate, registration | Dated 22 Feb 2024 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹37.76 Cr 14.3%Development · ₹226.13 Cr 85.7%
| Estimated cost | ₹263.89 Cr | |
|---|---|---|
| Cost incurred | ₹189.44 Cr (71.8% of the estimate) | |
| Cost left | ₹74.45 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹122.46 Cr | |
| Land cost revision | Not verified yet | |
Sold (314) 87.7%Unsold (44) 12.3%
| Sold, Q3 2025-26 | 313 / 358 · 45 available | |
|---|---|---|
| Sold, Q4 2025-26 | 315 / 358 · 43 available | |
| Sold, Q1 2026-27 | 313 / 358 · 45 available | |
| Sold, Q2 2026-27 | 314 / 358 · 44 available | |
| Unsold, Q2 2026-27 | 44 | |
| Sold in Q4 2025-26 | 2 | |
| Sold in Q1 2026-27 | 2 bookings cancelled or corrected (315 → 313 sold) | |
| Sold in Q2 2026-27 | 1 |
| Escrow bank | FEDERAL BANK OF INDIA · Indiranagar | |
|---|---|---|
| Designated account, collected | ₹18.60 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹13.79 Cr in Q2 2026-27 (74% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 25 | |
|---|---|---|
| Marked completed | 5 | |
| Past promised date, not completed | 3 | Clear |
| Complaints filed against the promoter | 0 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 12 Jan 2024 | Review |
| Building plan (KIADB) | Sanctioned 15 Feb 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | FEDERAL BANK OF INDIA · Indiranagar | |

Map of 2 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Assetz Sora & Saki Phase 2, price locked; Assetz Sora & Saki Phase 3, price locked.
| Birla Trimaya Phase-2 | about 5 km | Locked |
|---|
| Birla Trimaya Phase-3 | 5.2 km | Locked |
|---|
| Ekta Elements | 5.2 km | Locked |
|---|
| Varnam Phase 1c | about 5.5 km | Locked |
|---|
| Assetz Zen & Sato | about 6 km | Locked |
|---|
| Barca II At Godrej Msr City | about 6 km | Locked |
|---|
| Sattva City | 6.0 km | Locked |
|---|
| Godrej MSR City | 6.3 km | Locked |
|---|
| Kumar Plumeria |
|---|
| about 3 km |
| 31 Dec 2028 |
| 5% (5 of 100) |
| Locked |
| Birla Trimaya | about 5 km | 15 Dec 2031 | 90% (494 of 548) | Locked |
|---|
| Birla Trimaya Phase-2 | about 5 km | 20 Jun 2029 | 99% (470 of 473) | Locked |
|---|
| Birla Trimaya Phase-3 | 5.2 km | 31 Aug 2030 | 95% (439 of 463) | Locked |
|---|
| Rent, 3BHK, 3 km | ₹34,000 /mo · 7 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹26,750 /mo · 6 listings | |
| Rent per sq ft, 3 km | ₹26.2 /mo, as listed · 14 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 16 (11 with an approximate location) | |
|---|---|---|
| Flats in them | 14,423 | |
| Booked | 10,846 of 14,423 (75%) | |
| Unsold | 3,577 | |
| Booked a month, pooled | 219 flats | |
| Months to sell, pooled | 12 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 32.6 m
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 11.4 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (Bagalur Village Panchayat) | |
| Nearest city water main | 6.1 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 1.1 km to the south, Ponnaiyar, secondary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 5.8 km, Airport City | |
| Kempegowda Airport | 6.4 |
| MG Road (CBD) | 20.8 |
| Manyata Tech Park | 13.1 |
| ITPL, Whitefield | 18.8 |
| Ecospace, Bellandur ORR | 24.5 |
| Electronic City Ph 1 | 34.1 |
| Landfill or waste transfer station | 1.5 km to the north-west, named Bagalur Landfill on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | 1.3 km to the north-west | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 450 m to the west, named Bagalur Substation on OpenStreetMap |