Assetz Promise of Spring Phase-2
Part ofAssetz Promise of Spring2 phases, 345 flats
Overview
Part ofAssetz Promise of Spring2 phases, 345 flats
Overview
Part ofAssetz Promise of Spring2 phases, 345 flats

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 2 Oakland EstatesFiled as completed · no completion certificate on record | DEAMANTE PROPERTIES | Plot | ~1,500 sqft (estimate: filed carpet plus 25%) | Aug 2022 |
| Aarohana AdiraActive · 5% built | AAROHANA PROJECTS | Apartment | 776–1,745 sqft carpet (as filed) | Dec 2030 |
| Adarsh Savana Phase 1Lapsed · completion date passed | SHRESHTA INFRA PROJECTS PRIVATE LIMITED | Plot | – | Oct 2023 |
| Aditya Palm GroveApplied for completion 05/12/2019 | SRI ADITYA HOMES PRIVATE LIMITED | Plot | – | Dec 2019 |
| Aero ExoticLapsed · completion date passed | LOTUS ENCLAVE | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2023 |
| Aeropolis, A Project Of Sattva GroupLapsed · completion date passed | TRINAYANI REALTOR PRIVATE LIMITED |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 53 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 11 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 11 filed survey numbers matched.
| Location & risks | – | 2 | – | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Apartment |
| 280–635 sqft carpet (as filed) |
| Jul 2026 |
| Aira HillsApplied for completion 17/02/2026 | Vaarahi Developers Pvt Ltd | Plot | – | Dec 2024 |
| Ajmal Flora Valley Phase -IIApplied for completion 01/10/2024 | M/s. Ajmal Flora Valley | Plot | ~2,140 sqft (estimate: filed carpet plus 25%) | May 2017 |
8 of 252 other projects in Devanahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Assetz Promise of Spring Phase-2 in the interactive atlas
| Survey | Land converted | Sale deed | Khata | Extent |
|---|---|---|---|---|
| Survey 174 | ||||
| 174/1 | 14 Sep 2024Deputy Commissioner | 19 Mar 2014 | 12 Feb 2024E Khatha · Panchayai Raj | 13.1 Gunta |
| 174/2 | 30 Mar 2021Deputy Commissioner | 19 Mar 2014 | 12 Feb 2024E Khatha · Panchayai Raj | 13.1 Gunta |
| 174/3 | 14 Sep 2020Deputy Commissioner | 19 Mar 2014 | 19 Feb 2024E Khatha · Panchayai Raj | 13.2 Gunta |
| Survey 175 | ||||
| 175/1 | 2 Jun 2020Deputy Commissioner | 22 Oct 2012 | 13 Feb 2024E Khatha · Panchayai Raj | 32 Gunta |
| 175/3 | 2 Jun 2020Deputy Commissioner | 7 May 2005 | 13 Feb 2024E Khatha · Panchayai Raj | 20 Gunta |
| 175/5, 175/6 | 2 Jun 2020Deputy Commissioner | 22 Oct 2012 | 12 Feb 2024E Khatha · Panchayai Raj | 28 Gunta + 28 Gunta |
| 175/9 | 2 Jun 2020Deputy Commissioner | 1 Feb 2006 | 12 Feb 2024E Khatha · Panchayai Raj | 20 Gunta |
| Survey 183 | ||||
| 183/3 | 2 Jun 2020Deputy Commissioner | 3 Apr 2014 | 15 Feb 2024E Khatha · Panchayai Raj | 1 Acre 12 Gunta |
| 183/4 | 14 Sep 2020Deputy Commissioner | 6 Jun 2014 | 12 Feb 2024E Khatha · Panchayai Raj | 21 Gunta |
| 183/5 | 2 Jun 2020Deputy Commissioner | 29 Oct 2014 | 12 Feb 2024E Khatha · Panchayai Raj | 22 Gunta |
K-RERA filing, land schedule
Deeds read, and the whole project
Transfer of the land
Title deed executed
No. DNH-1-00868-2005-06 · Book 1
Title deed filed with K-RERA, pp. 1, 6 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹25,000 · Sy 175/4, Kasaba hobli · 0-06 Guntas
Title deed filed with K-RERA, pp. 1, 9, 17 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹96,000 · Kasaba hobli, Devanahalli taluk
Title deed filed with K-RERA, pp. 1, 9, 15 · See it in Documents
Transfer of the land
Title deed registered
No. DNH-1-05777-2005-06 · Book 1 · executed 27 Jan 2006 · Consideration ₹96,000 · Sy 175/3, Kasaba hobli, Devanahalli taluk
Title deed filed with K-RERA, pp. 1, 6, 9, 15 · See it in Documents
Approval or registrationTransfer of the landTitle check
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 31 May 2024 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Satellite map with the 11 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 11 filed survey numbers matched.
| Survey numbers | 174/1, 174/2, 174/3, 175/1, 175/3, 175/5 and 5 more | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Khata | E Khatha · Panchayai Raj · 12 Feb 2024; E Khatha · Panchayai Raj · 19 Feb 2024; E Khatha · Panchayai Raj · 13 Feb 2024; and 1 more | |
| Sale deed | Dated 7 May 2005, 1 Feb 2006, 22 Oct 2012 and 4 more | |
| Title deed | Consideration ₹36.0 L | |
| Title deed | Consideration ₹36.0 L | |
| Title deed | Consideration ₹36.0 L | |
| Title deed | Consideration ₹12.0 L | |
| Title deeds | And 7 more read from the filing | |
| Sy. No. 174/1 | 1 | 13 guntas | 13 guntas | Differs: 6 guntas apart | 0 | |
| Sy. No. 174/2 | 1 | 13 guntas | 13 guntas | Differs: 2 guntas apart | 0 | |
| Sy. No. 174/3 | 1 | 14 guntas | 13 guntas | Yes | 0 | |
| Sy. No. 175/1 | 1 | 32 guntas | 32 guntas | Differs: 2 guntas apart | 0 | |
| Sy. No. 175/3 | 1 | 20 guntas | 20 guntas | Differs: 6 guntas apart | 0 | |
| Sy. No. 175/5 | 1 | 28 guntas | 28 guntas | Differs: 8 guntas apart | 0 | |
| Sy. No. 175/6 | 1 | 28 guntas |
| Building plan (BIAPPA) | Sanctioned 28 Feb 2024 · No. BIAPPA/TP/LOA/126/2022-23/23-24/2543 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Oct 2027 |
| Land conversion | 11 of 11 parcels converted | |
|---|---|---|
| Sy 174/1 | Converted 14 Sep 2024 · Deputy Commissioner | |
| Sy 174/2 | Converted 30 Mar 2021 · Deputy Commissioner | |
| Sy 174/3, 183/4 | Converted 14 Sep 2020 · Deputy Commissioner | |
| Sy 175/1, 175/3, 175/5, 175/6, 175/9… | Converted 2 Jun 2020 · Deputy Commissioner | |
| Survey numbers | 174/1 · 174/2 · 174/3 · 175/1 · 175/3 · 175/5 · 175/6 · 175/9 · 183/3 · 183/4 · 183/5 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 8 km | Locked | |
|---|---|---|---|
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 8 km | Locked | |
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 8 km | Locked | |
| Aeropolis, A Project Of Sattva Group | about 10.5 km | Locked |
| Assetz Promise of Spring Phase-2 This project | This project is the point the others are measured from | 31 Oct 2027 | Not filed | Not verified yet |
|---|---|---|---|---|
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 8 km | 31 Dec 2026 | 100% (30 of 30) | Locked |
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 8 km | 30 Jun 2027 | 100% (30 of 30) | Locked |
| Projects within 4 km, counted | 3 (3 with an approximate location) | |
|---|---|---|
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Agriculture | Review |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 24.2 km, Shankrappa Layout, MAruthi nagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | 690 m to the west, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
As the promoter reported it

| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 85% | |
| Completion, accountant | 82.7% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 31 Oct 2027 | |
| Work began, as filed | 1 Jun 2024 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Mar 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect's certificate, registration | Site inspected 15 Mar 2024 | |
| Chartered accountant's certificate, registration | Dated 20 May 2024 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹7.00 Cr 40.1%Development · ₹10.45 Cr 59.9%
| Estimated cost | ₹17.45 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹17.45 Cr, same as the filing | |
| Cost incurred | ₹14.43 Cr (82.7% of the estimate) | |
| Cost left | ₹3.02 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹2.97 Cr | |
| Land cost revision | Not verified yet | |
| Escrow bank | HDFC · RACECOURSE ROAD | |
|---|---|---|
| Designated account, collected | ₹1.0 L in Q2 2026-27 | |
| Designated account, withdrawn | ₹68,204 in Q2 2026-27 | |
| Net amount withdrawable, Form 4 | ₹4,66,87,960 | |
| Withdrawn from the escrow account to date | ₹9,75,97,437 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 31 May 2024 | Review |
| Building plan (BIAPPA) | Sanctioned 28 Feb 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | HDFC · RACECOURSE ROAD | |

Transfer of the land
Title deed executed
Consideration ₹5.9 L · Sy 175/2, Avathi village, Kasaba hobli, Devanahalli taluk
Title deed filed with K-RERA, pp. 1, 7, 12 · See it in Documents
Transfer of the land
Title deed executed
Sy 182/1, Avathi village, Kasaba hobli, Devanahalli taluk
Title deed filed with K-RERA, pp. 1, 17 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹2.4 L · Sy 175/2, Avathi village, Kasaba hobli, Devanahalli taluk
Title deed filed with K-RERA, pp. 1, 5, 10 · See it in Documents
Transfer of the land
Title deed registered
No. DNH-1-04391-2012-13 · Book 1 · executed 22 Oct 2012 · Consideration ₹8.0 L · Sy 175/1; 175/6, Avathi village, Kasaba hobli, Devanahalli taluk · 0-28 Guntas
Title deed filed with K-RERA, pp. 1, 3, 6, 10 · See it in Documents
Transfer of the land
Title deed registered
No. DNH-1-04393-2012-13 · Book 1 · executed 22 Oct 2012 · Consideration ₹8.0 L
Title deed filed with K-RERA, pp. 1, 5, 6 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹31.0 L
Title deed filed with K-RERA, pp. 1, 5 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹16.0 L
Title deed filed with K-RERA, pp. 1, 5 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹10.5 L
Title deed filed with K-RERA, pp. 1, 5 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹50,000
Title deed filed with K-RERA, pp. 1, 5 · See it in Documents
Transfer of the land
Title deed registered
No. DNH-1-10337-2013-14 · Book 1 · executed 19 Mar 2014
Title deed filed with K-RERA, pp. 1, 10 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹43.6 L · Sy 171; 373/6
Title deed filed with K-RERA, pp. 1, 9, 21 · See it in Documents
Approval or registration
Building plan sanctioned
BIAPPA · plan BIAPPA/TP/LOA/126/2022-23/23-24/2543
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/050924/006995
K-RERA registration ·
| 28 guntas |
| Differs: 7 guntas apart |
| 0 |
| Sy. No. 175/9 | 1 | 20 guntas | 20 guntas | Differs: 5 guntas apart | 0 |
| Sy. No. 183/3 | 1 | 1 acre 12 guntas | 1 acre 12 guntas | Differs: 3 guntas apart | 0 |
| Sy. No. 183/4 | 1 | 21 guntas | 21 guntas | Differs: 7 guntas apart | 0 |
| Sy. No. 183/5 | 1 | 22 guntas | 22 guntas | Differs: 7 guntas apart | 0 |
| Sattva Vasanta Cove | 11.4 km | Locked |
|---|
| Sattva Vasanta Skye | 11.5 km | Locked |
|---|
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 8 km | 31 Dec 2027 | 100% (20 of 20) | Locked |
|---|
| Aeropolis, A Project Of Sattva Group | about 10.5 km | 9 Jul 2026 | 95% (949 of 1,001) | Locked |
|---|
| Sattva Vasanta Cove | 11.4 km | 27 Dec 2030 | 14% (28 of 200) | Locked |
|---|
| Sattva Vasanta Skye | 11.5 km | 6 May 2031 | 28% (301 of 1,077) | Locked |
|---|
| Flats in them |
|---|
| 670 |
| Booked | 644 of 670 (96%) |
|---|
| Unsold | 26 |
|---|
| Booked a month, pooled | 1 flats |
|---|
| Months to sell, pooled | 47 months |
|---|
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 32.6 m
Across Devanahalli, the water table sat 19.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 10.2 m over the year.
| Groundwater | Devanahalli taluk average, July 2023: 19.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 19.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (Gram Panchayat) | |
| Nearest city water main | 19.6 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 10.3 km, KIA Terminal | |
| Kempegowda Airport | 10.4 |
| MG Road (CBD) | 37.4 |
| Manyata Tech Park | 29.4 |
| ITPL, Whitefield | 34.0 |
| Ecospace, Bellandur ORR | 40.8 |
| Electronic City Ph 1 | 50.4 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | 1.9 km to the north | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |