Overview
Allure Avani Phase I
Part ofAllure Avani2 phases, 217 flats
Overview
Part ofAllure Avani2 phases, 217 flats
Overview
Part ofAllure Avani2 phases, 217 flats

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | ||
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 64 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| – |
| Not verified |
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 379 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Allure Avani Phase I in the interactive atlas
| Survey | Land converted | Sale deed | Khata | Extent |
|---|---|---|---|---|
| 57/2 | 26 Jul 2022Hosakote Town Planning Authority | 19 Jun 1989 | 29 Dec 2023E Khatha · Kammasandra Panchayati | 1 Acre ,31 Gunta |
| Survey 58 | ||||
| 58/1 | 12 Apr 2022Hosakote Town Planning Authority | 7 Mar 2013 | 29 Dec 2023E Khatha · Kammasandra Panchayati | 1 Acre, 9 Gunta |
| 58/2 | 12 Apr 2022Hosakote Town Planning Authority | 14 Aug 1986 | 29 Dec 2023E Khatha · Kammasandra Panchayati | 3 Acre, 31 Gunta |
| Survey 59 | ||||
| 59/1 | 21 Mar 2022Hosakote Town Planning Authority | 15 Jul 1985 | 29 Dec 2023E Khatha · Kammasandra Panchayati | 3 Acre, 14 Gunta |
| 59/2 | 21 Mar 2022Hosakote Town Planning Authority | 29 Nov 1985 | 29 Dec 2023E Khatha · Kammasandra Panchayati | 1 Acre, 30 Gunta |
| Survey 73 | ||||
| 73/1 | 8 Sep 2022District Commissioner, Bengaluru | 19 Jun 1989 | 29 Dec 2023E Khatha · Kammasandra Panchayati | 1 Acre, 29 Gunta |
| 73/2 | 8 Sep 2022District Commissioner, Bengaluru | 8 May 1990 | 29 Dec 2023E Khatha · Kammasandra Panchayati | 2 Acre |
K-RERA filing, land schedule
Deeds read, and the whole project
Transfer of the land
Title deed registered
No. BDH-1-07362-2012-13 · Book 1 · executed 7 Mar 2013
Title deed filed with K-RERA, pp. 1, 6 · See it in Documents
Approval or registration
Building plan sanctioned
Local Planning Authority · plan LAO/05/2023-24
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/050824/006959
K-RERA registration ·
Approval or registrationTransfer of the landTitle check
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 2 Mar 2024 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | Karnataka Bank · ₹50.00 Cr disbursed | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 57/2, 58/1, 58/2, 59/1, 59/2, 73/1 and 1 more | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 63,231 sq m | |
| Khata | E Khatha · Kammasandra Panchayati · 29 Dec 2023 | |
| Sale deed | Dated 15 Jul 1985, 29 Nov 1985, 14 Aug 1986 and 3 more | |
Valid as of this reportValidity ended
| Building plan (Local Planning Authority) | Sanctioned 20 Jan 2024 · No. LAO/05/2023-24 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-341625 · issued 23 Jan 2024 · valid until 18 Dec 2028 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 8 May 2028 |
| Land conversion | 7 of 7 parcels converted | |
|---|---|---|
| Sy 57/2 | Converted 26 Jul 2022 · Hosakote Town Planning Authority | |
| Sy 58/1, 58/2 | Converted 12 Apr 2022 · Hosakote Town Planning Authority | |
| Sy 59/1, 59/2 | Converted 21 Mar 2022 · Hosakote Town Planning Authority | |
| Sy 73/1, 73/2 | Converted 8 Sep 2022 · District Commissioner, Bengaluru | |
| Survey numbers | 57/2 · 58/1 · 58/2 · 59/1 · 59/2 · 73/1 · 73/2 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
N · avg 229 m² 17.4%O · avg 226 m² 17.4%K · avg 237 m² 5.8%J · avg 241 m² 5.8%11 other types 53.6%
| A | 7 | 3,231 |
| B | 7 | 3,271 |
| C | 7 | 3,271 |
| D | 7 | 2,886 |
| E | 7 | 2,886 |
| F | 6 | 3,096 |
| G | 7 | 2,886 |
| H | 7 | 2,886 |
| I | 7 | 2,886 |
| J | 8 | 2,589 |
| K | 8 | 2,548 |
| L | 6 | 2,747 |
| M | 6 | 2,515 |
| N | 24 | 2,463 |
| O | 24 | 2,434 |
| Sold, Q2 2026-27 | 48 / 138 | |
|---|---|---|
| Unsold, Q2 2026-27 | 90 | |
| Months to sell, derived from filed bookings | 45 months |
| Chaithanya Sankhya | about 3.5 km | Locked | |
|---|---|---|---|
| Definer Upper Deck | about 4 km | Locked | |
| Radiance Floresta | about 4.5 km | Locked | |
| Adarsh Pinecourt | about 4.5 km | Locked | |
| The Pearl Paradise | about 4.5 km |
| Allure Avani Phase I This project | This project is the point the others are measured from | 8 May 2028 | 35% (48 of 138) | Not verified yet |
|---|---|---|---|---|
| Chaithanya Sankhya | about 3.5 km | 30 Nov 2028 | 66% (29 of 44) | Locked |
| Definer Upper Deck | about 4 km | 31 Dec 2025 | 71% (78 of 110) | Locked |
| Radiance Floresta |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 5 km, Richi's Garden | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 1.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · Community Hall · Indoor Sports facility · Power Backup | |
|---|---|---|
| Electricity, built | 0% | |
| Community Hall, built | 0% | |
| Parks, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 2.22 (307 covered spaces for 138 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | Not verified yet | |
As the promoter reported it

| Main structure | 100% · planned by 20 Oct 2025 | |
|---|---|---|
| Electrical and plumbing finishing | 5% · planned by 20 Apr 2028 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 38% | |
| Completion, accountant | 35.8% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 20 Apr 2028 | |
| RERA completion date | 8 May 2028 | |
| Work began, as filed | 1 Apr 2024 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 10.65 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 70 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Feb 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Feb 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 18 Apr 2024 · site inspected 31 Dec 2025 | |
| Engineer's certificate, registration | Dated 18 Apr 2024 | |
| Chartered accountant's certificate, registration | Dated 20 May 2024 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹16.91 Cr 5.3%Development · ₹304.38 Cr 94.7%
| Estimated cost | ₹321.29 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹295.38 Cr | |
| Estimated cost, Form 4 Q1 2026-27 | ₹323.17 Cr | |
| Cost incurred | ₹115.82 Cr (35.8% of the estimate) | |
| Cost left | ₹207.35 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹111.85 Cr | |
| Land cost revision | Not verified yet | |
Sold (48) 34.8%Unsold (90) 65.2%
| Sold, Q3 2025-26 | 30 / 138 · 108 available | |
|---|---|---|
| Sold, Q4 2025-26 | 34 / 138 · 104 available | |
| Sold, Q1 2026-27 | 40 / 138 · 98 available | |
| Sold, Q2 2026-27 | 48 / 138 · 90 available | |
| Unsold, Q2 2026-27 | 90 | |
| Sold in Q4 2025-26 | 4 | |
| Sold in Q1 2026-27 | 6 | |
| Sold in Q2 2026-27 | 8 | |
| Flats booked, Form 4 Q3 2025-26 | 30 |
| Escrow bank | STATE BANK OF INDIA · Avenue Road, Bangalore | |
|---|---|---|
| Designated account, collected | ₹15.77 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹16.32 Cr in Q2 2026-27 | |
| Amount deposited in the quarter, Form 4 | ₹11,43,82,743 | |
| Share of collections deposited in escrow | 70% | |
| Sale proceeds realised, Q3 2025-26 | ₹16,34,03,919 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | Karnataka Bank · ₹50.00 Cr disbursed | |
|---|---|---|
| Records searched to | 2 Mar 2024 | Review |
| Building plan | Sanctioned 20 Jan 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | STATE BANK OF INDIA · Avenue Road, Bangalore | |

| Neighbourhood Tree Park | about 5 km | Locked |
|---|
| Nava Skanda Bellavita | about 5 km | Locked |
|---|
| SOBHA Victoria Park Phase 1 | about 5.5 km | Locked |
|---|
| Sattva Songbird | about 5.5 km | Locked |
|---|
| Godrej Woodscapes | about 6 km | Locked |
|---|
| Assetz Sun & Sanctum - Phase 2 | about 6 km | Locked |
|---|
| Sattva La Vita | about 6.5 km | Locked |
|---|
| about 4.5 km |
| 31 May 2028 |
| 100% (65 of 65) |
| Locked |
| Adarsh Pinecourt | about 4.5 km | 6 Mar 2026 | 71% (142 of 201) | Locked |
|---|
| The Pearl Paradise | about 4.5 km | 31 Dec 2026 | 72% (23 of 32) | Locked |
|---|
| Neighbourhood Tree Park | about 5 km | 31 Dec 2028 | 27% (25 of 93) | Locked |
|---|
| Projects within 4 km, counted | 11 (11 with an approximate location) | |
|---|---|---|
| Flats in them | 3,195 | |
| Booked | 1,645 of 3,195 (51%) | |
| Unsold | 1,550 | |
| Booked a month, pooled | 68 flats | |
| Months to sell, pooled | 23 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 1.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 8 km, Horamavu | |
| Kempegowda Airport | 13.5 |
| MG Road (CBD) | 16 |
| Manyata Tech Park | 10 |
| ITPL, Whitefield | 10.5 |
| Ecospace, Bellandur ORR | 17 |
| Electronic City Ph 1 | 26.5 |
| Landfill or waste transfer station | about 2 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 1 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |