| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 2 | – | Review |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | ||
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 65 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| – |
| Not verified |
| Location & risks | – | 1 | 1 | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 2 | Clear |
|---|
| Loan & collateral | – | 2 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 446 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Adarsh Tropica (Phase-1) in the interactive atlas
Transfer of the land
Title deed executed
Consideration ₹98.9 L · Sy 65/1A, Chikkanayakanahalli village, Varthur hobli
Title deed filed with K-RERA, pp. 1, 7, 13 · See it in Documents
Covers 65/1B only
Approval or registration
Land use converted
Special/Deputy Commissioner · Survey 65/1B
K-RERA filing, land schedule
Covers 65/1A1 only
Approval or registration
Land use converted
Special/Deputy Commissioner · Survey 65/1A1
K-RERA filing, land schedule
Covers 65/1A1 only
Transfer of the land
Title deed executed
No. VRT-1-04428-2011-12 · Book 1 · Consideration ₹1.08 Cr · Sy 65/1A1; 65/1A, Chikkanayakanahalli village, Varthur hobli
Title deed filed with K-RERA, pp. 1, 6, 13, 45 · See it in Documents
Covers 65/1A1 only
Transfer of the land
Sale deed
in favour of M/s. Orchids Apartments Private Limited · Survey 65/1A1
K-RERA filing, land schedule
Covers 65/1B only
Transfer of the land
Title deed registered
No. VRT-1-05147-2011-12 · Book 1 · executed 14 Sep 2011 · Consideration ₹82.1 L · Sy 65/B
Title deed filed with K-RERA, pp. 1, 6, 7, 15 · See it in Documents
Covers 65/1B only
Transfer of the land
Sale deed
in favour of M/s. Orchids Apartments Private Limited · Survey 65/1B
K-RERA filing, land schedule
Approval or registration
Land use converted
Special/Deputy Commissioner · Survey 64/4, 64/5
K-RERA filing, land schedule
Transfer of the land
Title deed registered
No. INR-1-07475-2012-13 · Book 1 · Consideration ₹1.90 Cr · Sy 64/5; 64/2, Chikkanayakanahalli village, Varthur hobli; Sy 64/4; 64/2, Chikkanayakanahalli village, Varthur hobli
Title deed filed with K-RERA, pp. 6, 11, 21 · See it in Documents
Transfer of the land
Sale deed
in favour of M/s. Orchids Apartments Private Limited · Survey 64/4, 64/5
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Halanayakanahalli, Village Panchayath Of · Survey 64/4, 65/1A1, 65/1B, 64/5
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Halanayakanahalli, Village Panchayath Of · Survey 64/4, 65/1A1, 65/1B, 64/5
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan BDA/NM/A.S/A.A-1/T.S-4/E-14/21-22
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/111022/005309
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 13 May 2022 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | HDFC INVESTMENT TRUST II · ₹350.00 Cr disbursed | |
| Mortgage on the project land | Declared by the promoter | Review |
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 64/4, 65/1A1, 65/1B, 64/5 | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 11,736 sq m | |
| Khata | E Khatha · Halanayakanahalli, Village Panchayath Of · 8 Jan 2019 | |
| Sale deed | Dated 12 Aug 2011, 14 Sep 2011, 28 Mar 2013 | |
| Sale deed in favour of | M/s. Orchids Apartments Private Limited | |
Valid as of this reportValidity ended
| Building plan (BDA) | Sanctioned 30 Sep 2021 · No. BDA/NM/A.S/A.A-1/T.S-4/E-14/21-22 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/822/2018 | Clear |
| Environmental clearance | SEIAA 13 CON 2019 · issued 8 May 2019 | Clear |
| Airport height NOC | NOC ID BANG/SOUTH/B/080718/326123 · issued 23 Aug 2018 · permissible top elevation 946.4 m above mean sea level · validity ended 22 Aug 2026 | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Apr 2027 |
| Land conversion | 4 of 4 parcels converted | |
|---|---|---|
| Sy 64/4, 64/5 | Converted 22 Feb 2013 · Special/Deputy Commissioner | |
| Sy 65/1A1 | Converted 8 Apr 2011 · Special/Deputy Commissioner | |
| Sy 65/1B | Converted 15 Oct 2008 · Special/Deputy Commissioner | |
| Survey numbers | 64/4 · 65/1A1 · 65/1B · 64/5 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
2BHK · 59 m² 100%
| Type | Flats | Carpet per flat (sq ft) |
|---|---|---|
| 2BHK | 309 | 635 |
| Sold, Q2 2026-27 | 307 / 309 | |
|---|---|---|
| Unsold, Q2 2026-27 | 2 |
| Haven Phase 2 | about 0.5 km | Locked | |
|---|---|---|---|
| 63 Degree East - Tower E | 1.5 km | Locked | |
| Birla Evara | 1.5 km | Locked | |
| Sobha Royal Pavilion Phase 8 - Wing 15 | 1.5 km | Locked |
| Adarsh Tropica (Phase-1) This project | This project is the point the others are measured from | 30 Apr 2027 | 99% (307 of 309) | Not verified yet |
|---|---|---|---|---|
| Haven Phase 2 | about 0.5 km | 30 Jun 2030 | 11% (16 of 148) | Locked |
| 63 Degree East - Tower E | 1.5 km | 31 Dec 2026 | 100% (399 of 399) | Locked |
| Birla Evara |
Map of the ground within about 950 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 1.0 km, Doddakannelli | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 1.3 km to the south, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 410 m to the west, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 30% | |
| Electricity, built | 0% | |
| Indoor Sports facility, built | 0% | |
| Gym, built | 10% | |
| Power Backup, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.84 (259 covered spaces for 309 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it

| Main structure | 100% · planned by 18 Oct 2025 | |
|---|---|---|
| Electrical and plumbing finishing | 80% · planned by 29 Jul 2026 | |
| Internal roads | Not verified yet | |
| Club house | 30% | |
| Completion | 98% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 30 Apr 2027 | |
| RERA completion date | 30 Apr 2027 | |
| Work began, as filed | 1 Oct 2022 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 39.6 m filed, 2 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/822/2018 | |
| Environmental clearance | SEIAA 13 CON 2019 · issued 8 May 2019 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 25 Aug 2022 · site inspected 17 Aug 2022 | |
| Engineer's certificate, registration | Dated 25 Aug 2022 | |
| Chartered accountant's certificate, registration | Dated 24 Aug 2022 | |
Land · ₹26.76 Cr 19.9%Development · ₹107.56 Cr 80.1%
| Estimated cost | ₹135.43 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹78.78 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (307) 99.4%Unsold (2) 0.6%
| Sold, Q3 2025-26 | 307 / 309 · 2 available | |
|---|---|---|
| Sold, Q4 2025-26 | 307 / 309 · 2 available | |
| Sold, Q1 2026-27 | 307 / 309 · 2 available | |
| Sold, Q2 2026-27 | 307 / 309 · 2 available | |
| Unsold, Q2 2026-27 | 2 | |
| Sold in Q4 2025-26 | 0 | |
| Sold in Q1 2026-27 | 0 | |
| Sold in Q2 2026-27 | 0 | |
| 2 BHK, sold | 307 / 309 |
| Escrow bank | HDFC · RICHMOND ROAD | |
|---|---|---|
| Designated account, collected | ₹132.16 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹105.24 Cr in Q2 2026-27 (80% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | HDFC INVESTMENT TRUST II · ₹350.00 Cr disbursed | |
|---|---|---|
| Records searched to | 13 May 2022 | Review |
| Building plan (BDA) | Sanctioned 30 Sep 2021 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | HDFC · RICHMOND ROAD | |

Map of 10 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: 63 Degree East - Tower E, price locked; Birla Evara, price locked; Sobha Royal Pavilion Phase 8 - Wing 15, price locked; Sobha Royal Pavilion Phase 6 - Wing 10 And 11, price locked; Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14, price locked; Mana Jardin Neo, price locked; Satori Residence By Genurise, price locked; Assetz Ren & Rei, price locked; Adarsh Rosewood, price locked; Assetz Mizumi Reserve Tower A1 A2 A4, price locked.
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | 1.5 km | Locked |
|---|
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | 1.5 km | Locked |
|---|
| Mana Jardin Neo | 1.9 km | Locked |
|---|
| Satori Residence By Genurise | 1.9 km | Locked |
|---|
| Assetz Muse & Maison | about 2.5 km | Locked |
|---|
| Assetz Ren & Rei | 2.5 km | Locked |
|---|
| Orion Heights | about 3 km | Locked |
|---|
| Adarsh Rosewood | 3.1 km | Locked |
|---|
| 1.5 km |
| 25 Dec 2031 |
| 66% (1,060 of 1,594) |
| Locked |
| Sobha Royal Pavilion Phase 8 - Wing 15 | 1.5 km | 30 Jun 2026 | 100% (113 of 113) | Locked |
|---|
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | 1.5 km | 30 Jun 2026 | 100% (151 of 151) | Locked |
|---|
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | 1.5 km | 30 Jun 2026 | 100% (227 of 227) | Locked |
|---|
| Rent, 4BHK, 3 km | ₹96,000 /mo · 9 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹60,000 /mo · 105 listings | |
| Rent, 2BHK, 3 km | ₹39,500 /mo · 186 listings | |
| Rent, 1BHK, 3 km | ₹20,500 /mo · 66 listings | |
| Rent per sq ft, 3 km | ₹35.2 /mo, as listed · 186 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 76 (30 with an approximate location) | |
|---|---|---|
| Flats in them | 21,644 | |
| Booked | 11,942 of 21,644 (55%) | |
| Unsold | 9,702 | |
| Booked a month, pooled | 275 flats | |
| Months to sell, pooled | 34 months |
Map of storm drains, lakes and government-flagged flood locations within about 950 m of the site.
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | 2.0 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 1.3 km to the south, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 4.5 km, Bellandur | |
| Kempegowda Airport | 34.5 |
| MG Road (CBD) | 13.8 |
| Manyata Tech Park | 19.1 |
| ITPL, Whitefield | 11.8 |
| Ecospace, Bellandur ORR | 4.3 |
| Electronic City Ph 1 | 5.7 |
| Landfill or waste transfer station | 1.6 km to the south-west | |
|---|---|---|
| Sewage treatment plant | 2.5 km to the north | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | 2.6 km to the west, named Bangalore Central Jail on OpenStreetMap | |
| Electrical substation | 2.4 km to the east |