| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 1 Lakh Multi Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| A.R RuthviLapsed · completion date passed | G.RAVINDRAKUMAR & M.K.ASHOKA | Plot | ~1,200–1,500 sqft (estimate: filed carpet plus 25%) | Dec 2025 |
| A.R Ruthvi Phase 2Filed as completed · no completion certificate on record | T MANJUNATHA | Plot | ~1,200–1,500 sqft (estimate: filed carpet plus 25%) | Feb 2024 |
| Ag Varaha ValleyApplied for completion 23/01/2026 | ABHISHEK . A | Plot | ~1,230–1,500 sqft (estimate: filed carpet plus 25%) | Aug 2025 |
| Arvind LakeviewActive · 90% built | Arvind Builders | Plot | ~1,200–4,000 sqft (estimate: filed carpet plus 25%) | Dec 2027 |
| Arvind Orchids |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 41 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
| Arvind Builders |
| Plot |
| ~1,200–1,680 sqft (estimate: filed carpet plus 25%) |
| Dec 2023 |
| Ashwasurya LegacyRegistered · no quarterly update yet | M/s. Suryakalpa Ventures | Plot | ~1,200–2,220 sqft (estimate: filed carpet plus 25%) | Dec 2029 |
| B.T.G LayoutApplied for completion 11/03/2023 | SHARADAMMA | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Aug 2021 |
8 of 59 other projects in West Bengaluru, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Yashas in the interactive atlas
Transfer of the land
Title deed registered
No. DBP-1-03874-2022-23 · Book 1 · ಮಧುರೆ hobli, ಬೆಂಗಳೂರು ಗ್ರಾಮಾಂತರ district
Title deed filed with K-RERA, pp. 3, 8, 10 · See it in Documents
Transfer of the land
Sale deed
in favour of R 2 Properties represented by its partners K N Rudresh and K S Rudresh · Survey 59/3
K-RERA filing, land schedule
Approval or registration
Khata issued
6 acres 22 guntas (5.50 karab) · NA · Survey 59/3
K-RERA filing, land schedule
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | Not verified yet | |
| Title report dated | 22 Nov 2025 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Page 1
Page 1 of 1 of the survey sketch. Filed with K-RERA: ADLR Survey Sketch, 1 page, not in English.
| Building plan (Doddaballapur Planning Authority) | Sanctioned 14 Feb 2024 · No. DPA/TP/LAO/12/2023-24 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Airport height NOC | Not verified yet | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Jan 2027 |
| Land conversion | Converted 5 Mar 2025 · Deputy Commissioner | |
|---|---|---|
| Survey numbers | 59/3 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 16.5 km, Siddeswara Layout | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank | |
| Height above nearest drain | Not verified yet | |

| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 100% | |
| Completion, accountant | 100% of the estimated cost spent | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Mar 2026 | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
Land · ₹2.62 Cr 27.3%Development · ₹6.97 Cr 72.7%
| Estimated cost | ₹9.60 Cr | |
|---|---|---|
| Cost incurred | ₹9.60 Cr (100% of the estimate) | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | KOTAK MAHINDRA BANK · Nagarbhavi | |
|---|---|---|
| Designated account, collected | ₹0 in Q3 2025-26 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan | Sanctioned 14 Feb 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | KOTAK MAHINDRA BANK · Nagarbhavi | |

Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Approval or registration
Building plan sanctioned
Doddaballapur Planning Authority · plan DPA/TP/LAO/12/2023-24
K-RERA filing, approvals
Approval or registration
Land use converted
Deputy Commissioner · Survey 59/3
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1250/301/PR/111225/008329
K-RERA registration
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 59/3 | |
|---|---|---|
| Land extent, Sy 59/3 | 6 acres 27.50 guntas | |
| Area on the KGIS map | Not verified yet | |
| Khata | 6 acres 22 guntas (5.50 karab) · NA · 13 Sep 2023 | |
| Sale deed | Dated 16 Jun 2022 | |
| Sale deed in favour of | R 2 Properties represented by its partners K N Rudresh and K S Rudresh | |
| Projects within 4 km, counted | 1 (1 with an approximate location) | |
|---|---|---|
| Flats in them | 96 | |
| Booked | 42 of 96 (44%) | |
| Unsold | 54 |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 31.2 m
Across Doddaballapura, the water table sat 20 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 31.2 m, and it recovered 4.7 m over the year.
| Groundwater | Doddaballapura taluk average, July 2023: 20 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 20 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | Not verified yet | |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |
| Possession, agreement | 31 Jan 2027 | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 31 Jan 2027 | |
| Work began, as filed | 1 Mar 2024 | |
| Designated account, withdrawn | ₹0 in Q3 2025-26 |
|---|
| Unregistered agreements, over 10% paid | Not verified yet | |
|---|---|---|
| RERA complaints | 0 |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | about 16 km, Madavara | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 32.5 |
| MG Road (CBD) | 31.5 |
| Manyata Tech Park | 28 |
| ITPL, Whitefield | 42 |
| Ecospace, Bellandur ORR | 41.5 |
| Electronic City Ph 1 | 48.5 |