Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 1 Lakhmulti Storey Housing Chikanahalli KamnahaliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| Aashrayaa Eco CityApplied for completion 06/08/2020 | AASHRAYAA PROJECTS | Plot | – | Sep 2019 |
| Adithya Homes Grand Phase 2Completed (regulator flag) | M/s.ADITHYA HOMES | Plot | ~1,520 sqft (estimate: filed carpet plus 25%) | Completed |
| Adithya Homes Grand Phase 3Completed (regulator flag) | M/S.ADITHYA HOMES | Plot | ~1,400–1,990 sqft (estimate: filed carpet plus 25%) | Completed |
| Adithya Homes Paradise Phase 2Applied for completion 09/01/2024 | ADITHYAHOMES | Plot | – | May 2024 |
| Adithya Homes Paradise Phase-3 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 15 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | 2 | – | Review |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| M/s.ADITHYA HOMES |
| Plot |
| – |
| Completed |
| Adithya Homes Paradise Phase-4Lapsed · completion date passed | ADITHYA HOMES | Plot | ~1,200–1,600 sqft (estimate: filed carpet plus 25%) | Jun 2026 |
| Adithya Paradise -5Active · 100% built | PARADISE HOMES | Plot | ~1,200–1,750 sqft (estimate: filed carpet plus 25%) | Jun 2027 |
8 of 41 other projects in East Bengaluru, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Svb Maplewoods in the interactive atlas
Transfer of the land
Sale deed
in favour of M/S. S V B Developers · Survey 75/1
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of M/S. SVB Developers · Survey 75/3
K-RERA filing, land schedule
Approval or registration
Land use converted
District commisioner Bengaluru · Survey 75/1, 75/2, 75/3
K-RERA filing, land schedule
Approval or registration
Land use converted
District commisioner Bengaluru · Survey 75/1, 75/2, 75/3
K-RERA filing, land schedule
Approval or registration
Land use converted
District commisioner Bengaluru · Survey 75/1, 75/2, 75/3
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of M/S. S V B Developers · Survey 75/2
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · Panchayat Raj Anekal · Survey 75/1, 75/2, 75/3
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · Panchayat Raj Anekal · Survey 75/1, 75/2, 75/3
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · Panchayat Raj Anekal · Survey 75/1, 75/2, 75/3
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Local Planning Authority · plan AYP/LAO/169/2022-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/300823/006205
K-RERA registration ·
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 75/1, 75/2, 75/3 | |
|---|---|---|
| Land extent, Sy 75/1 | 39 guntas | |
| Land extent, Sy 75/2 | 39 Guntas | |
| Land extent, Sy 75/3 | 39 guntas | |
| Area on the KGIS map | Not verified yet | |
| Khata | A Khatha · Panchayat Raj Anekal · 28 Dec 2022 | |
| Sale deed | Dated 26 May 2022, 21 Oct 2022 | |
| Sale deed in favour of | M/S. S V B Developers, M/S. SVB Developers | |
| Building plan (Local Planning Authority) | Sanctioned 16 May 2023 · No. AYP/LAO/169/2022-23 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| KSPCB | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 May 2027 |
| Land conversion | Converted 21 Oct 2022 · District commisioner Bengaluru | |
|---|---|---|
| Survey numbers | 75/1 · 75/2 · 75/3 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
| Leafy Delight | about 2 km | Locked | |
|---|---|---|---|
| Jeevan's Allure | about 2.5 km | Locked | |
| Coevolve Florenza | 3.1 km | Locked | |
| Leafy Avenue | 3.6 km | Locked |
| Svb Maplewoods This project | This project is the point the others are measured from | 31 May 2027 | Not filed | Not verified yet |
|---|---|---|---|---|
| Leafy Delight | about 2 km | 31 Mar 2028 | 24% (16 of 67) | Locked |
| Jeevan's Allure | about 2.5 km | 31 Jul 2027 | 32% (49 of 152) | Locked |
| Coevolve Florenza |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | A 400 kV line passes 40 m from the filed location: close enough that its corridor may cross the site | Review |
| Nearest government-flagged flood location | 4.3 km, Varthur police station | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 2.3 km to the north-east, Dakshina Pinakini, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | 330 m to the south, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 31 May 2027 | |
| Work began, as filed | 16 May 2023 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹2.79 Cr 61.6%Development · ₹1.74 Cr 38.4%
| Estimated cost | ₹4.53 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | STATE BANK OF INDIA · HSR Layout | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan | Sanctioned 16 May 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | STATE BANK OF INDIA · HSR Layout | |
Map of 2 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Coevolve Florenza, price locked; Leafy Avenue, price locked.
| Inspira Infinity | about 4 km | Locked |
|---|
| Vasudharini Nest | about 4.5 km | Locked |
|---|
| Poetry Of Earth | 4.7 km | Locked |
|---|
| Sobha Windsor Phase 4 Wing 9, 10 And 11 | 5.2 km | Locked |
|---|
| Sobha Windsor Phase 2 Wing 3, 4 And 5 | 5.2 km | Locked |
|---|
| Sobha Windsor Phase 3 Wing 6, 7 And 8 | 5.3 km | Locked |
|---|
| Adarsh Park Heights Phase-2 | about 5.5 km | Locked |
|---|
| Bilva Phase-II By Bhavisha Homes | about 6 km | Locked |
|---|
| 3.1 km |
| 31 Dec 2027 |
| 48% (149 of 309) |
| Locked |
| Leafy Avenue | 3.6 km | 31 Dec 2028 | 11% (8 of 71) | Locked |
|---|
| Inspira Infinity | about 4 km | 31 Jan 2029 | 95% (100 of 105) | Locked |
|---|
| Vasudharini Nest | about 4.5 km | 31 Mar 2028 | 31% (26 of 84) | Locked |
|---|
| Projects within 4 km, counted | 26 (16 with an approximate location) | |
|---|---|---|
| Flats in them | 5,292 | |
| Booked | 2,787 of 5,292 (53%) | |
| Unsold | 2,505 | |
| Booked a month, pooled | 112 flats | |
| Months to sell, pooled | 20 months |
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 28.7 m
Across Anekal, the water table sat 21.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 28.7 m, and it recovered 3.3 m over the year.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 21.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (Local Authority, Neriga Village) | |
| Nearest city water main | 5.4 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 2.3 km to the north-east, Dakshina Pinakini, primary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 7.5 km, Channasandra | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 31.4 |
| MG Road (CBD) | 20.6 |
| Manyata Tech Park | 22.1 |
| ITPL, Whitefield | 8.3 |
| Ecospace, Bellandur ORR | 11.3 |
| Electronic City Ph 1 | 15.2 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 3.0 km to the north-west |