Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Amigo AlfrescoActive · 15% built | AMIGO SHELTERS PVT LTD | Apartment | 975–1,348 sqft carpet (as filed) | Dec 2028 |
| Balaji Lake View Phase 1Completed (regulator flag) | RAGHURAMI REDDY BONDALA & B RAMA MOHAN REDDY | Plot | ~890–2,050 sqft (estimate: filed carpet plus 25%) | Completed |
| Balaji Lake View Phase 2Completed (regulator flag) | RAGHURAMI REDDY BONDALA & B RAMA MOHAN REDDY | Plot | ~750–1,480 sqft (estimate: filed carpet plus 25%) | Completed |
| Concorde AntaresActive · 70% built | Concorde Group | Apartment | 755–1,417 sqft | Dec 2028 |
| Construction Of 592 Du'sLapsed · completion date passed | Karnataka Slum Development Work | Apartment | 292 sqft carpet (as filed) | Jan 2026 |
| Dhanush EnclaveLapsed · completion date passed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 46 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| DHANUSH BUILDERS |
| Apartment |
| – |
| May 2018 |
| Durga NandanaLapsed · completion date passed | SREE DURGA BUILDERS AND DEVELOPERS | Apartment | 853 sqft carpet (as filed) | Sep 2023 |
| Hrs Sai Guru Bliss AvenueActive · 100% built | HRS Sai Guru Developers LLP | Apartment | 858–1,239 sqft carpet (as filed) | Feb 2027 |
8 of 20 other projects in Vidyaranyapura, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sumuk Square in the interactive atlas
Transfer of the land
Sale deed
Survey 55/5
K-RERA filing, land schedule
Approval or registration
Land use converted
DC OFFICE BANGALORE · Survey 55/5
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 55/5
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/ADDL.DIR/JDNORTH/0088/21-22
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/472/PR/070323/005769
K-RERA registration ·
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | Not verified yet | |
| Title report dated | 10 Feb 2009 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 55/5 | |
|---|---|---|
| Land extent, Sy 55/5 | 0 ACRE 31.05 GUNTAS/3141.34 SQ M | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 3,140 sq m | |
| Khata | A Khatha · BBMP · 9 Mar 2022 | |
| Sale deed | Dated 25 Feb 1997 | |
| Building plan (BBMP) | Sanctioned 1 Dec 2022 · No. BBMP/ADDL.DIR/JDNORTH/0088/21-22 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water and sewerage NOC (BWSSB) | issued 5 Nov 2022 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 25 Aug 2026 |
| Land conversion | Converted 10 Feb 2009 · DC OFFICE BANGALORE | |
|---|---|---|
| Survey numbers | 55/5 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
3BHK · avg 77 m² 60%2BHK · avg 83 m² 40%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 30 | 896 |
| 3BHK | 45 | 832 |
| Sold, Q1 2026-27 | 50 / 75 | |
|---|---|---|
| Unsold, Q1 2026-27 | 25 |
| Shriram Solitaire | about 2 km | Locked | |
|---|---|---|---|
| Rubby Castle 1 | about 3 km | Locked | |
| Century Kindle Phase 1 | about 3 km | Locked | |
| Vruksha Greens | about 5.5 km | Locked | |
| Sri Rama Enclave | about 5.5 km | Locked |
| Sumuk Square This project | This project is the point the others are measured from | 25 Aug 2026 | 67% (50 of 75) | Not verified yet |
|---|---|---|---|---|
| Shriram Solitaire | about 2 km | 15 May 2026 | 100% (269 of 269) | Locked |
| Rubby Castle 1 | about 3 km | 30 Apr 2029 | 25% (8 of 32) | Locked |
| Century Kindle Phase 1 |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 3.5 km, Attur, Near Dairy Circle | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 1 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · Indoor Sports facility · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.11 (83 covered spaces for 75 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Not declared | |
Ten-year July mean for this taluk: 32.6 m
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 11.4 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | Not verified yet | |
As the promoter reported itPossession date in the agreement

| Main structure | 100% · planned by 27 Apr 2024 | |
|---|---|---|
| Electrical and plumbing finishing | 100% · planned by 27 Feb 2025 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 100% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 25 Aug 2026 | |
|---|---|---|
| Schedule end | 27 Jun 2025 | |
| RERA completion date | 25 Aug 2026 | |
| Work began, as filed | 30 Jan 2023 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14.5 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Not provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Feb 2026, Jun 2026, Jul 2026 (3 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Feb 2026, Jun 2026, Jul 2026 (3 filed) | |
| Architect's certificate, registration | Site inspected 9 Dec 2022 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹11.32 Cr 35.9%Development · ₹20.18 Cr 64.1%
| Estimated cost | ₹31.50 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹20.00 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (50) 66.7%Unsold (25) 33.3%
| Sold, Q3 2025-26 | 50 / 75 · 25 available | |
|---|---|---|
| Sold, Q4 2025-26 | 50 / 75 · 25 available | |
| Sold, Q1 2026-27 | 50 / 75 · 25 available | |
| Unsold, Q1 2026-27 | 25 | |
| Sold in Q4 2025-26 | 0 | |
| Sold in Q1 2026-27 | 0 | |
| Flats booked, Form 4 Q1 2026-27 | 50 |
| Escrow bank | HDFC · RR NAGR | |
|---|---|---|
| Designated account, collected | ₹17.1 L in Q1 2026-27 | |
| Designated account, withdrawn | ₹17.1 L in Q1 2026-27 (100% of that quarter's deposits) | |
| Share of collections deposited in escrow | 100% | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 1 Dec 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | HDFC · RR NAGR | |

| Assetz Miru & Miyo | about 6 km | Locked |
|---|
| Legacy Salvador | about 7.5 km | Locked |
|---|
| 4square Park Sierra | about 7.5 km | Locked |
|---|
| Godrej Aveline | about 8 km | Locked |
|---|
| Royal Enclave | about 8.5 km | Locked |
|---|
| Assetz Soho & Sky | about 8.5 km | Locked |
|---|
| Cumins Sanctum | about 9 km | Locked |
|---|
| about 3 km |
| 14 Mar 2031 |
| 73% (336 of 458) |
| Locked |
| Vruksha Greens | about 5.5 km | 30 Jun 2027 | 30% (24 of 80) | Locked |
|---|
| Sri Rama Enclave | about 5.5 km | 30 Sep 2026 | 61% (39 of 64) | Locked |
|---|
| Assetz Miru & Miyo | about 6 km | 31 Mar 2031 | 6% (20 of 350) | Locked |
|---|
| Projects within 4 km, counted | 19 (19 with an approximate location) | |
|---|---|---|
| Flats in them | 3,648 | |
| Booked | 2,082 of 3,648 (57%) | |
| Unsold | 1,566 | |
| Booked a month, pooled | 64 flats | |
| Months to sell, pooled | 24 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 1 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 7 km, Yelahanka | |
| Kempegowda Airport | 21 |
| MG Road (CBD) | 16.5 |
| Manyata Tech Park | 11.5 |
| ITPL, Whitefield | 25.5 |
| Ecospace, Bellandur ORR | 25.5 |
| Electronic City Ph 1 | 33.5 |
| Landfill or waste transfer station | about 0.5 km, named Mavallipura BBMP Landfill on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | about 0.5 km, named MS Palya Crematorium on OpenStreetMap | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km, named Bylakere 66kV Substation on OpenStreetMap |