| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | 1 | – | 4 | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | |
Part of the full report. Unlock all 3 sections
| “smilee Celestial”Lapsed · completion date passed | Blue Valley Properties Pvt Ltd | Plot | – | Aug 2019 |
| 1 Lakhmulti Storey Housing DoddanagamangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 1 Lakhmulti Storey Housing GoolimangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation Pvt Ltd | Apartment | 323–484 sqft carpet (as filed) | Mar 2024 |
| A B AnanthaActive · 84% built | Amaravathi Builders | Apartment | 753–972 sqft carpet (as filed) | Jan 2027 |
| Abhee NandikaCompleted · OC 22-04-2022 | ABHEE DEVELOPERS | Apartment | 786 sqft carpet (as filed) | Completed |
| Abhee Prakruthi Villa PlotsCompleted (regulator flag) |
Title & ownership
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 86 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | 1 | Review |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| M/s.Abhee Developers |
| Plot |
| – |
| Completed |
| Abhee PrideCompleted · OC 18-04-2026 | ABHEE VENTURES PRIVATE LIMITED | Apartment | 688–842 sqft carpet (as filed) | Completed |
| Abhee Serenity SpringsActive · 35% built | Abhee Ventures | Apartment | 1,000–1,575 sqft | Jun 2030 |
8 of 235 other projects in Electronic City, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Shriram 107southeast - Phase 3 in the interactive atlas
₹99 for this report opens Valuation, Title & ownership and Disputes & cases for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (Local Planning Authority) | Sanctioned 27 Jan 2021 · No. STRPPA/TP/CC/477/2018-19 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/300/2020 · issued 19 Jan 2021 | Clear |
| Environmental clearance (1 of 2) | issued 26 Apr 2017 | Clear |
| Environmental clearance (2 of 2) | SEIAA 28 CON 2021 · EC identification no. EC22B039KA110987 · issued 30 Apr 2022 | Clear |
| Airport height NOC (1 of 2) | NOC ID BANG/SOUTH/B/010917/190565 | |
| Airport height NOC (2 of 2) | issued 3 Dec 2021 · valid until 2 Dec 2029 | Clear |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 3 | |
| RERA completion date | 7 Jan 2027 |
| Land conversion | 2 of 2 parcels converted | |
|---|---|---|
| Sy 5/1, 5/2, 7/2, 10/2, 44/2, 44/ | Converted 16 Sep 2016 · deputy commissioner Bangalore | |
| Sy 7/3 (old 7/2) | Converted 24 Sep 2020 · deputy commissioner Bangalore | |
| Survey numbers | 5/1, 5/2, 7/2, 10/2, 44/2, 44/ · 7/3 (old 7/2) |
₹99 for this report opens Valuation, Title & ownership and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation, Title & ownership and Disputes & cases for this project, yours to read for good.
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 15.5 km, G K LAYOUT | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| Swimming Pool, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.91 (965 covered spaces for 1,055 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Not declared | |
Ten-year July mean for this taluk: 28.7 m
Across Anekal, the water table sat 21.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 28.7 m, and it recovered 3.3 m over the year.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 21.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (MAYASANDRA VILLAGE PANCHAYAT) | |
| Nearest city water main | Not verified yet | |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
As the promoter reported it

| Main structure | 60% · planned by 6 Nov 2025 | |
|---|---|---|
| Electrical and plumbing finishing | 10% · planned by 22 Aug 2026 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 49% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Oct 2026 | |
| RERA completion date | 7 Jan 2027 | |
| Work began, as filed | 20 Jan 2022 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | filed: 1A 14.65 m, 1 14.65 m, 2 14.65 m, 3 44.65 m, 4 44.65 m, 5 44.65 m, 6 44.65 m, 13 44.65 m, 14 44.65 m | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Not provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Feb 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/300/2020 · issued 19 Jan 2021 | |
| Environmental clearance (1 of 2) | issued 26 Apr 2017 | |
| Environmental clearance (2 of 2) | SEIAA 28 CON 2021 · EC identification no. EC22B039KA110987 · issued 30 Apr 2022 | |
| Architect, quarterly | Form 5 · Feb 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹26.14 Cr 7.7%Development · ₹313.68 Cr 92.3%
| Estimated cost | ₹339.82 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (1,055) 100%
| Sold, Q3 2025-26 | 653 / 1,055 · 402 available | |
|---|---|---|
| Sold, Q4 2025-26 | 695 / 1,055 · 360 available | |
| Sold, Q1 2026-27 | 1,055 / 1,055 · 0 available | |
| Sold, Q2 2026-27 | 1,055 / 1,055 · 0 available | |
| Unsold, Q2 2026-27 | 0 | |
| Sold in Q4 2025-26 | 42 | |
| Sold in Q1 2026-27 | 360 | |
| Sold in Q2 2026-27 | 0 |
| Escrow bank | HDFC · BENGALURU - RICHMOND ROAD | |
|---|---|---|
| Designated account, collected | ₹68.57 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹82.2 L in Q2 2026-27 (1% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 3 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan | Sanctioned 27 Jan 2021 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | HDFC · BENGALURU - RICHMOND ROAD | |

Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | about 9 km, Bommasandra | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 48 |
| MG Road (CBD) | 28 |
| Manyata Tech Park | 34 |
| ITPL, Whitefield | 24 |
| Ecospace, Bellandur ORR | 19 |
| Electronic City Ph 1 | 11.5 |
| Sewage treatment plant |
|---|
| None within 3 km |
| Quarry | None within 3 km |
|---|
| Crematorium | None within 3 km |
|---|
| Prison | None within 3 km |
|---|
| Electrical substation | about 1.5 km, named Attibele on OpenStreetMap |
|---|