| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| “smilee Celestial”Lapsed · completion date passed | Blue Valley Properties Pvt Ltd | Plot | – | Aug 2019 |
| 1 Lakhmulti Storey Housing DoddanagamangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 1 Lakhmulti Storey Housing GoolimangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation Pvt Ltd | Apartment | 323–484 sqft carpet (as filed) | Mar 2024 |
| Abhee NandikaCompleted · OC 22-04-2022 | ABHEE DEVELOPERS | Apartment | 786 sqft carpet (as filed) | Completed |
| Abhee Prakruthi Villa PlotsCompleted (regulator flag) | M/s.Abhee Developers | Plot | – | Completed |
| Abhee PrideCompleted · OC 18-04-2026 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 52 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | 1 | 1 | Review |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| ABHEE VENTURES PRIVATE LIMITED |
| Apartment |
| 688–842 sqft carpet (as filed) |
| Completed |
| Abhee Serenity SpringsActive · 35% built | Abhee Ventures | Apartment | 1,000–1,575 sqft | Jun 2030 |
| AchalumCompleted (regulator flag) | ACHAL DEVELOPERS | Plot | ~1,200–2,400 sqft (estimate: filed carpet plus 25%) | Completed |
8 of 235 other projects in Electronic City, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open A B Anantha in the interactive atlas
Approval or registration
Land use converted
Deputy Commissioner, Bengaluru · Survey 108/1
K-RERA filing, land schedule
Transfer of the land
Title deed registered
No. ABL-1-03503-2022-23 · Book 1 · executed 24 Jun 2022
Title deed filed with K-RERA, pp. 1, 6 · See it in Documents
Approval or registration
Khata issued
E Khatha · Nagarasabe, Hebbagodi · Survey 108/1
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Anekal Planning Authority · plan APA/CC/726/2023-24
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/100925/008082
K-RERA registration ·
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 25 Jul 2025 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Page 1
Page 1 of 1 of the survey sketch. Filed with K-RERA: ADLR Survey Sketch, 1 page.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 108/1 | |
|---|---|---|
| Land extent, Sy 108/1 | 8.12 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 1,615 sq m | |
| Khata | E Khatha · Nagarasabe, Hebbagodi · 20 Mar 2023 | |
| Building plan (Anekal Planning Authority) | Sanctioned 22 Feb 2024 · No. APA/CC/726/2023-24 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Airport height NOC | Not verified yet | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 15 Jan 2027 |
| Land conversion | Converted 3 Dec 2007 · Deputy Commissioner, Bengaluru | |
|---|---|---|
| Survey numbers | 108/1 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
3BHK · avg 90 m² 75%2BHK 25%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 2BHK | 8 | 6,028 |
| 3BHK | 24 | 23,336 |
| Sold, Q2 2026-27 | 0 / 32 | |
|---|---|---|
| Unsold, Q2 2026-27 | 32 |
| Sowmya Skyla | about 1 km | Locked | |
|---|---|---|---|
| Vasuki Vallabha | about 1 km | Locked | |
| Shriram Sapphire (Codename Ultimate) | about 1 km | Locked | |
| Ramky One Karnival | about 3 km | Locked | |
| Abhee Serenity Springs |
| A B Anantha This project | This project is the point the others are measured from | 15 Jan 2027 | 0% (0 of 32) | Not verified yet |
|---|---|---|---|---|
| Sowmya Skyla | about 1 km | 31 Dec 2026 | 19% (13 of 68) | Locked |
| Vasuki Vallabha | about 1 km | 31 Dec 2027 | 31% (10 of 32) | Locked |
| Shriram Sapphire (Codename Ultimate) |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 5.5 km, G K LAYOUT | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 2.5 km to the north, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Kammasandra Lake2 | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.09 (35 covered spaces for 32 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Not declared | |
Ten-year July mean for this taluk: 28.7 m
Across Anekal, the water table sat 21.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 28.7 m, and it recovered 3.3 m over the year.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 21.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | Not verified yet | |
As the promoter reported itPossession date in the agreement

| Main structure | 100% · planned by 31 Oct 2025 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 30 Nov 2026 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 84% | |
| Completion, accountant | Not verified yet | |
Builder's schedule runs about 3 months past the promised possession date.
| Possession, agreement | 30 Sep 2026 | |
|---|---|---|
| Schedule end | 31 Dec 2026 | |
| RERA completion date | 15 Jan 2027 | |
| Work began, as filed | 3 Jan 2025 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14.95 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Not provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Feb 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Feb 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 10 Jul 2025 · site inspected 10 Jul 2025 | |
| Engineer's certificate, registration | Dated 10 Jul 2025 | |
| Chartered accountant's certificate, registration | Dated 5 Jul 2025 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹4.92 Cr 31.5%Development · ₹10.71 Cr 68.5%
| Estimated cost | ₹15.64 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹10.71 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | ₹5.86 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Unsold (32) 100%
| Sold, Q3 2025-26 | 0 / 32 · 32 available | |
|---|---|---|
| Sold, Q4 2025-26 | 0 / 32 · 32 available | |
| Sold, Q1 2026-27 | 0 / 32 · 32 available | |
| Sold, Q2 2026-27 | 0 / 32 · 32 available | |
| Unsold, Q2 2026-27 | 32 | |
| Sold in Q4 2025-26 | 0 | |
| Sold in Q1 2026-27 | 0 | |
| Sold in Q2 2026-27 | 0 |
| Escrow bank | Union Bank of India · ANANTH NAGAR | |
|---|---|---|
| Designated account, collected | ₹0 in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 25 Jul 2025 | |
| Building plan | Sanctioned 22 Feb 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Union Bank of India · ANANTH NAGAR | |

| about 3.5 km |
| Locked |
| Assetz Ren & Rei | about 4 km | Locked |
|---|
| Assetz Muse & Maison | about 4 km | Locked |
|---|
| Vistar White Pearl | about 5 km | Locked |
|---|
| Mahidhara Harmony | about 5 km | Locked |
|---|
| Acorn Hive | about 5.5 km | Locked |
|---|
| Birla Evara | about 5.5 km | Locked |
|---|
| Signature Heights | about 5.5 km | Locked |
|---|
| about 1 km |
| 5 Nov 2028 |
| 100% (414 of 414) |
| Locked |
| Ramky One Karnival | about 3 km | 30 Dec 2026 | 77% (389 of 503) | Locked |
|---|
| Abhee Serenity Springs | about 3.5 km | 30 Jun 2030 | 38% (110 of 288) | Locked |
|---|
| Assetz Ren & Rei | about 4 km | 31 Jan 2029 | 73% (159 of 218) | Locked |
|---|
| Projects within 4 km, counted | 34 (34 with an approximate location) | |
|---|---|---|
| Flats in them | 8,610 | |
| Booked | 5,049 of 8,610 (59%) | |
| Unsold | 3,561 | |
| Booked a month, pooled | 117 flats | |
| Months to sell, pooled | 31 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 2.5 km to the north, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 1 km, Hebbagodi | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 41 |
| MG Road (CBD) | 18.5 |
| Manyata Tech Park | 25 |
| ITPL, Whitefield | 18 |
| Ecospace, Bellandur ORR | 10.5 |
| Electronic City Ph 1 | 1.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 2.5 km to the south | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km |