Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | ||
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 27 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| – |
| Not verified |
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | 1 | 1 | Review |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 379 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Jr Strr Enclave in the interactive atlas
Covers 1/12 only
Approval or registration
Land use converted
DC · Survey 1/12
K-RERA filing, land schedule
Transfer of the land
Title deed executed
Sy 1/2, Kasaba hobli, Hoskote taluk
Title deed filed with K-RERA, pp. 1, 25 · See it in Documents
Covers 1/2, 1/10, 1/11 only
Approval or registration
Land use converted
DC · Survey 1/2, 1/10, 1/11
K-RERA filing, land schedule
Covers 1/2, 1/10, 1/11, 1/12 only
Approval or registration
Khata issued
E Khatha · Panchayath · Survey 1/2, 1/10, 1/11, 1/12
K-RERA filing, land schedule
Covers 1/8 only
Approval or registration
Khata issued
E Khatha · Panchayath · Survey 1/8
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BMRDA · plan STTTPA/TP/LAO/20/2022-23
K-RERA filing, approvals
Covers 1/8 only
Approval or registration
Land use converted
DC · Survey 1/8
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1250/304/PR/050723/006041
K-RERA registration
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 22 Jun 2022 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 1/2, 1/8, 1/10, 1/11, 1/12 | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Khata | E Khatha · Panchayath · 19 Mar 2022; E Khatha · Panchayath · 16 May 2022 | |
| Building plan (BMRDA) | Sanctioned 17 Oct 2022 · No. STTTPA/TP/LAO/20/2022-23 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| KSPCB | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 11 Apr 2026 |
| Land conversion | 5 of 5 parcels converted | |
|---|---|---|
| Sy 1/2, 1/10, 1/11 | Converted 19 Mar 2022 · DC | |
| Sy 1/8 | Converted 19 Mar 2023 · DC | |
| Sy 1/12 | Converted 19 Mar 2021 · DC | |
| Survey numbers | 1/2 · 1/8 · 1/10 · 1/11 · 1/12 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
| Godrej Parkshire (Hoskote) | about 1 km | Locked | |
|---|---|---|---|
| Sowparnika Euphoria in the East | about 2 km | Locked | |
| Riqueza Siri | about 2.5 km | Locked | |
| One Residences At Sobha One World Ph4 W7 And 8 | about 3 km | Locked |
| Jr Strr Enclave This project | This project is the point the others are measured from | 11 Apr 2026 | Not filed | Not verified yet |
|---|---|---|---|---|
| Godrej Parkshire (Hoskote) | about 1 km | 31 Dec 2030 | 54% (614 of 1,132) | Locked |
| Sowparnika Euphoria in the East | about 2 km | 31 May 2031 | 99% (1,086 of 1,102) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 6 km, SIDDHARTHA LAYOUT KADUGODI | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 1.5 km, Dakshina Pinakini, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 62 m
Across Hosakote, the water table sat 22.6 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 62 m, and it recovered 4.9 m over the year.
| Groundwater | Hosakote taluk average, July 2023: 22.6 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 22.6 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | Not verified yet | |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |

| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 100% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 30 Dec 2023 | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 11 Apr 2026 | Review |
| Work began, as filed | 1 Apr 2023 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026 | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹46.9 L 23.1%Development · ₹1.56 Cr 76.9%
| Estimated cost | ₹2.03 Cr | |
|---|---|---|
| Cost incurred | ₹2.48 Cr | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | Karnataka Bank Ltd. · Nehrunagar Branch, Bangalore | |
|---|---|---|
| Designated account, collected | ₹3.51 Cr in Q3 2025-26 | |
| Designated account, withdrawn | ₹0 in Q3 2025-26 (0% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 14 | |
|---|---|---|
| Marked completed | 8 | |
| Past promised date, not completed | 5 | Clear |
| Complaints filed against the promoter | 0 | |
| Other phases under this promoter name | 12 | |
| With a filed extension or completion | 7 (7 completed, 0 extended) | |
| Average schedule slip | 8 months early |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 22 Jun 2022 | Review |
| Building plan (BMRDA) | Sanctioned 17 Oct 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Karnataka Bank Ltd. · Nehrunagar Branch, Bangalore | |

| One Residences At Sobha One World Ph5 W9,10,11 | about 3 km | Locked |
|---|
| One Residences At Sobha One World Ph6 W12,13,14 | about 3 km | Locked |
|---|
| Triaxis Splendour + | about 4 km | Locked |
|---|
| Godrej Woodscapes | about 5 km | Locked |
|---|
| Sattva Songbird | about 5 km | Locked |
|---|
| Kumari Nautilus | about 5.5 km | Locked |
|---|
| Nirmaanika Aria | about 6 km | Locked |
|---|
| Assetz Bloom & Dell - Phase 2 | about 6 km | Locked |
|---|
| Riqueza Siri | about 2.5 km | 30 Nov 2027 | 52% (66 of 128) | Locked |
|---|
| One Residences At Sobha One World Ph4 W7 And 8 | about 3 km | 30 Sep 2033 | 22% (98 of 440) | Locked |
|---|
| One Residences At Sobha One World Ph5 W9,10,11 | about 3 km | 28 Feb 2033 | 62% (449 of 721) | Locked |
|---|
| One Residences At Sobha One World Ph6 W12,13,14 | about 3 km | 31 Aug 2032 | 63% (452 of 721) | Locked |
|---|
| Projects within 4 km, counted | 25 (25 with an approximate location) | |
|---|---|---|
| Flats in them | 7,900 | |
| Booked | 4,158 of 7,900 (53%) | |
| Unsold | 3,742 | |
| Booked a month, pooled | 190 flats | |
| Months to sell, pooled | 20 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 1.5 km, Dakshina Pinakini, primary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 7 km, Whitefield | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 20 |
| MG Road (CBD) | 22.5 |
| Manyata Tech Park | 19 |
| ITPL, Whitefield | 9 |
| Ecospace, Bellandur ORR | 18 |
| Electronic City Ph 1 | 26 |