Overview
In That Quiet Earth Phase 2c
Part ofIn That Quiet Earth4 phases, 1,179 flats
Overview
Part ofIn That Quiet Earth4 phases, 1,179 flats
Overview
Part ofIn That Quiet Earth4 phases, 1,179 flats

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | 1 | – | – | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Aaptha LandmarkLapsed · completion date passed | AAPTHA VENTURES | Apartment | – | Nov 2021 |
| Adarsh PinecourtLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | 382–1,141 sqft carpet (as filed) | Mar 2026 |
| Adarsh PinecourtWithdrawn | Nusrath Unisa | Apartment | – | Nov 2023 |
| Adarsh TranqvilleLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | – | Mar 2026 |
| Adarsh Wisteria Phase 1Lapsed · completion date passed | VARIN INFRA PROJECTS PRIVATE LIMITED | Apartment | – | Aug 2023 |
| AlanovilleCompleted (regulator flag) | Goyal Hariyana Realty | Apartment | 2,251 sqft carpet (as filed) | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 59 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | – | Review |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amigo PalacioActive · 40% built | AMIGO SHELTERS PVT LTD | Apartment | 1,044–1,480 sqft carpet (as filed) | Mar 2028 |
| Amigo RegencyCompleted · OC 24-08-2021 | AMIGO SHELTERS PVT LTD | Apartment | – | Completed |
8 of 160 other projects in Hennur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open In That Quiet Earth Phase 2c in the interactive atlas
| Survey | Land converted | Sale deed | Khata | Extent |
|---|---|---|---|---|
| Survey 60 | ||||
| 60/2 | 30 Jan 2014DC Office, Bengalueu | 27 Mar 2012 | 28 May 2020A Khatha · BBMP | 19 Guntas |
| 60/3 | 15 Sep 2012DC Office, Bengaluru | 6 Apr 2006 | 28 May 2020A Khatha · BBMP | 221 Guntas |
| Survey 61 | ||||
| 61/1 | 30 Jan 2014DC Office Bengaluru | 14 Jul 2016in favour of Total Environment Constructions Private Limited | 28 May 2020A Khatha · BBMP | 18 Guntas |
| 61/2 | 15 Sep 2012DC Office, Bengaluru | 6 Apr 2006 | 28 May 2020A Khatha · BBMP | 33 Guntas |
| 61/3 | 24 Jul 2013DC Office Bengaluru | 6 Aug 1990 | 28 May 2020A Khatha · BBMP | 36 Guntas |
K-RERA filing, land schedule
The whole project
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/JDNORTH/0086/22-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/060424/006780
K-RERA registration ·
Approval or registrationTransfer of the landTitle check
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 12 Feb 2024 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 60/2, 60/3, 61/1, 61/2, 61/3 | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 12,849 sq m | |
| Khata | A Khatha · BBMP · 28 May 2020 | |
| Sale deed | Dated 6 Aug 1990, 6 Apr 2006, 27 Mar 2012 and 1 more | |
| Sale deed in favour of | Total Environment Constructions Private Limited | |
| Building plan (BBMP) | Sanctioned 31 Oct 2023 · No. BBMP/Addl.Dir/JDNORTH/0086/22-23 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 1 | |
| RERA completion date | 31 Mar 2031 |
| Land conversion | 5 of 5 parcels converted | |
|---|---|---|
| Sy 60/2 | Converted 30 Jan 2014 · DC Office, Bengalueu | |
| Sy 60/3, 61/2 | Converted 15 Sep 2012 · DC Office, Bengaluru | |
| Sy 61/1 | Converted 30 Jan 2014 · DC Office Bengaluru | |
| Sy 61/3 | Converted 24 Jul 2013 · DC Office Bengaluru | |
| Survey numbers | 60/2 · 60/3 · 61/1 · 61/2 · 61/3 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
3BHK · avg 148 m² 100%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 3BHK | 120 | 1,591 |
| Sold, Q2 2026-27 | 71 / 120 | |
|---|---|---|
| Unsold, Q2 2026-27 | 49 | |
| Months to sell, derived from filed bookings | 18 months |
| SOBHA Victoria Park Phase 1 | about 2 km | Locked | |
|---|---|---|---|
| Nava Skanda Bellavita | about 2 km | Locked | |
| The Pearl Paradise | about 2.5 km | Locked | |
| Vkk Grand | about 3 km | Locked | |
| Radiance Floresta | about 3 km |
| In That Quiet Earth Phase 2c This project | This project is the point the others are measured from | 31 Mar 2031 | 59% (71 of 120) | Not verified yet |
|---|---|---|---|---|
| SOBHA Victoria Park Phase 1 | about 2 km | 31 Dec 2027 | 93% (280 of 300) | Locked |
| Nava Skanda Bellavita | about 2 km | 31 Dec 2029 | 18% (63 of 360) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 2.5 km, Richi's Garden | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 2.00 (240 covered spaces for 120 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | Not verified yet | |
As the promoter reported it

| Main structure | Not started · planned by 3 Oct 2027 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 12 Mar 2029 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 0% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Mar 2031 | |
| RERA completion date | 31 Mar 2031 | |
| Work began, as filed | 1 Apr 2024 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 91.8 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 135 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 6 Mar 2024 · site inspected 29 Jan 2024 | |
| Engineer's certificate, registration | Dated 6 Mar 2024 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹51.19 Cr 16.3%Development · ₹262.48 Cr 83.7%
| Estimated cost | ₹313.68 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹139.14 Cr | |
| Cost incurred | ₹188.61 Cr | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹199.63 Cr | |
| Land cost revision | Not verified yet | |
Sold (71) 59.2%Unsold (49) 40.8%
| Sold, Q3 2025-26 | 47 / 120 · 73 available | |
|---|---|---|
| Sold, Q4 2025-26 | 58 / 120 · 62 available | |
| Sold, Q1 2026-27 | 71 / 120 · 49 available | |
| Sold, Q2 2026-27 | 71 / 120 · 49 available | |
| Unsold, Q2 2026-27 | 49 | |
| Sold in Q4 2025-26 | 11 | |
| Sold in Q1 2026-27 | 13 | |
| Sold in Q2 2026-27 | 0 |
| Escrow bank | ICICI Bank · BANGALORE - ITPL | |
|---|---|---|
| Designated account, collected | ₹4.52 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹4.52 Cr in Q2 2026-27 (100% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 1 | |
| K-RERA registrations under this promoter | 6 | |
|---|---|---|
| Marked completed | 1 | |
| Past promised date, not completed | 1 | |
| Complaints filed against the promoter | 9 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 12 Feb 2024 | Review |
| Building plan (BBMP) | Sanctioned 31 Oct 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | ICICI Bank · BANGALORE - ITPL | |

| Adarsh Pinecourt | about 3.5 km | Locked |
|---|
| Legacy Saviero | about 4 km | Locked |
|---|
| Sattva La Vita | about 4 km | Locked |
|---|
| Brr North Excellency Phase I | about 4.5 km | Locked |
|---|
| Assetz Sun & Sanctum - Phase 2 | about 5 km | Locked |
|---|
| Sobha City Athena | about 5 km | Locked |
|---|
| Sumadhura Solea | about 5.5 km | Locked |
|---|
| The Pearl Paradise |
|---|
| about 2.5 km |
| 31 Dec 2026 |
| 72% (23 of 32) |
| Locked |
| Vkk Grand | about 3 km | 30 Jun 2027 | 49% (59 of 120) | Locked |
|---|
| Radiance Floresta | about 3 km | 31 May 2028 | 100% (65 of 65) | Locked |
|---|
| Adarsh Pinecourt | about 3.5 km | 6 Mar 2026 | 71% (142 of 201) | Locked |
|---|
| Projects within 4 km, counted | 37 (37 with an approximate location) | |
|---|---|---|
| Flats in them | 8,021 | |
| Booked | 4,362 of 8,021 (54%) | |
| Unsold | 3,659 | |
| Booked a month, pooled | 123 flats | |
| Months to sell, pooled | 30 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, secondary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 5 km, HRBR Layout | |
| Kempegowda Airport | 25 | 16 |
| MG Road (CBD) | 15.5 | 12.5 |
| Manyata Tech Park | 10 | 6.5 |
| ITPL, Whitefield | 17 | 10 |
| Ecospace, Bellandur ORR | 23 | 14.5 |
| Electronic City Ph 1 | 34.5 | 24.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1 km, named Sewage Treatment Plant on OpenStreetMap | |
| Quarry | about 2.5 km to the north-east | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2 km |