Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | 1 | – | – | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 8 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. 1 of 5 filed survey numbers matched, 4 found no plot.
| Location & risks | – | 1 | 1 | Review |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | – | Review |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 446 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Greensquare in the interactive atlas
Approval or registration
Khata issued
E Khatha · Village Accountant · Survey 77/3
K-RERA filing, land schedule
Covers 80/5 only
Approval or registration
Land use converted
DC · Survey 80/5
K-RERA filing, land schedule
Covers 80/2, 80/3, 80/4 only
Approval or registration
Land use converted
DC · Survey 80/2, 80/3, 80/4
K-RERA filing, land schedule
Approval or registration
Land use converted
DC · Survey 77/3
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Village Accountant · Survey 80/2, 80/3, 80/4, 80/5
K-RERA filing, land schedule
Transfer of the land
Title deed registered
No. ANK-4-00277-2023-24 · Book 4 · executed 22 Aug 2023 · Sy 80; 80/2, Chikkanagamangala village, Sarjapura hobli; Sy 80; 80/3, Chikkanagamangala village, Sarjapura hobli · 30 guntas; and 2 more items
Title deed filed with K-RERA, pp. 1, 4, 21, 23 · See it in Documents
Transfer of the land
Sale deed
Survey 80/2, 80/3, 80/4, 80/5
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 77/3
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan BDA/TPM/PRL67/2022-23/1356
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/311023/006366
K-RERA registration ·
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 22 Aug 2023 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. 1 of 5 filed survey numbers matched, 4 found no plot.
| Survey numbers | 77/3, Sy No. 80/2, Sy No. 80/3, Sy No. 80/4, Sy No. 80/5 | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Khata | E Khatha · Village Accountant · 23 Jun 2005; E Khatha · Village Accountant · 1 Apr 2023 | |
| Sale deed | Dated 22 Aug 2023, 24 Aug 2023 | |
| Title deed | Sy 80; 80/2, Chikkanagamangala village, Sarjapura hobli, Anekal taluk; Sy 80; 80/3, Chikkanagamangala village, Sarjapura hobli, Anekal taluk · 30 Guntas | |
| Survey | Owners on the RTC | RTC extent | Filed extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|
| Sy. No. 77/3 | 4 | 36 guntas | 34 guntas | Differs: 7 guntas apart | 0 |
| Building plan (BDA) | Sanctioned 25 Sep 2023 · No. BDA/TPM/PRL67/2022-23/1356 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| KSPCB | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 4 | |
| RERA completion date | 31 Dec 2027 |
| Land conversion | 5 of 5 parcels converted | |
|---|---|---|
| Sy 77/3 | Converted 12 Jan 2023 · DC | |
| Sy Sy No. 80/2, Sy No. 80/3, Sy No.… | Converted 13 Nov 2008 · DC | |
| Sy Sy No. 80/5 | Converted 13 Aug 2008 · DC | |
| Survey numbers | 77/3 · Sy No. 80/2 · Sy No. 80/3 · Sy No. 80/4 · Sy No. 80/5 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
| Assetz Ren & Rei | 290 m | Locked | |
|---|---|---|---|
| Assetz Muse & Maison | about 0.5 km | Locked | |
| Birla Evara | 1.9 km | Locked | |
| Haven Phase 2 | about 2 km | Locked |
| Greensquare This project | This project is the point the others are measured from | 31 Dec 2027 | Not filed | Not verified yet |
|---|---|---|---|---|
| Assetz Ren & Rei | 290 m | 31 Jan 2029 | 73% (159 of 218) | Locked |
| Assetz Muse & Maison | about 0.5 km | 31 Mar 2030 | 9% (12 of 128) | Locked |
| Birla Evara |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 3.7 km, G K LAYOUT | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 460 m to the south-west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 190 m to the south-west, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 31 Dec 2027 | |
| Work began, as filed | 13 Oct 2023 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect's certificate, registration | Dated 9 Oct 2023 · site inspected 9 Oct 2023 | |
| Engineer's certificate, registration | Dated 20 Oct 2023 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹14.54 Cr 92.7%Development · ₹1.15 Cr 7.3%
| Estimated cost | ₹15.69 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹1.15 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | KOTAK MAHINDRA BANK · M G Road | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 4 | |
| K-RERA registrations under this promoter | 9 | |
|---|---|---|
| Marked completed | 0 | |
| Past promised date, not completed | 5 | Review |
| Complaints filed against the promoter | 38 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 22 Aug 2023 | Review |
| Building plan (BDA) | Sanctioned 25 Sep 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | KOTAK MAHINDRA BANK · M G Road | |
Map of 7 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Assetz Ren & Rei, price locked; Birla Evara, price locked; 63 Degree East - Tower E, price locked; Sobha Royal Pavilion Phase 8 - Wing 15, price locked; Sobha Royal Pavilion Phase 6 - Wing 10 And 11, price locked; Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14, price locked; Mana Jardin Neo, price locked.
| 63 Degree East - Tower E | 2.8 km | Locked |
|---|
| Sobha Royal Pavilion Phase 8 - Wing 15 | 3.7 km | Locked |
|---|
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | 3.7 km | Locked |
|---|
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | 3.7 km | Locked |
|---|
| Mana Jardin Neo | 3.8 km | Locked |
|---|
| Sowmya Skyla | about 4 km | Locked |
|---|
| Orion Heights | about 4 km | Locked |
|---|
| Assetz Mizumi Reserve Tower A1 A2 A4 | 4.2 km | Locked |
|---|
| 1.9 km |
| 25 Dec 2031 |
| 66% (1,060 of 1,594) |
| Locked |
| Haven Phase 2 | about 2 km | 30 Jun 2030 | 11% (16 of 148) | Locked |
|---|
| 63 Degree East - Tower E | 2.8 km | 31 Dec 2026 | 100% (399 of 399) | Locked |
|---|
| Sobha Royal Pavilion Phase 8 - Wing 15 | 3.7 km | 30 Jun 2026 | 100% (113 of 113) | Locked |
|---|
| Rent, 3BHK, 3 km | ₹45,000 /mo · 19 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹34,000 /mo · 41 listings | |
| Rent, 1BHK, 3 km | ₹13,500 /mo · 26 listings | |
| Rent per sq ft, 3 km | ₹33.3 /mo, as listed · 46 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 65 (32 with an approximate location) | |
|---|---|---|
| Flats in them | 18,724 | |
| Booked | 11,274 of 18,724 (60%) | |
| Unsold | 7,450 | |
| Booked a month, pooled | 283 flats | |
| Months to sell, pooled | 26 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 28.7 m
Across Anekal, the water table sat 21.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 28.7 m, and it recovered 3.3 m over the year.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 21.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (Shanthipura Grama Panchayat) | |
| Nearest city water main | 2.5 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 460 m to the south-west, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 3.1 km, Infosys Foundation Konappana Agrahara | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 37.2 |
| MG Road (CBD) | 15.9 |
| Manyata Tech Park | 21.6 |
| ITPL, Whitefield | 14.3 |
| Ecospace, Bellandur ORR | 6.9 |
| Electronic City Ph 1 | 3.3 |
| Landfill or waste transfer station | 2.4 km to the north-west | |
|---|---|---|
| Sewage treatment plant | 920 m to the south-east | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 2.5 km to the south-west, named Tata P.P. Solar on OpenStreetMap |