Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 10xLapsed · completion date passed | M/S. MAZ-RD BUILDERS AND DEVELOPERS PRIVATE LIMITED | Apartment | – | Sep 2024 |
| A.S.R.S ParadiseLapsed · completion date passed | A.S. Builders | Apartment | – | Jan 2021 |
| Aadya HeightsLapsed · completion date passed | WHITEWINDS CONSTRUCTIONS PRIVATE LIMITED | Apartment | 917–1,080 sqft carpet (as filed) | Dec 2025 |
| Aakriti EmeraldActive · 51% built | AAKRITI PROJECTS | Apartment | 694–1,137 sqft carpet (as filed) | Aug 2028 |
| Aakruthi NestActive · 35% built | KRITI BUILDERS AND DEVELOPERS | Apartment | 608–837 sqft carpet (as filed) | Dec 2028 |
| Aban DesireRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Apartment | 801–1,054 sqft carpet (as filed) | Dec 2028 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 46 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Adarsh ParadiseActive · 87% built | A1 BUILDERS | Apartment | 668–924 sqft carpet (as filed) | Dec 2026 |
| Adithya RicaCompleted (regulator flag) | ADITHYA CONSTRUCTIONS | Apartment | 769 sqft carpet (as filed) | Completed |
8 of 264 other projects in Old Madras Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Garuda Park View in the interactive atlas
Approval or registration
Land use converted
DC Bengaluru Rural · Survey 36/3, 36/4
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of GARUDA CONSTRUCTIONS · Survey 36/3, 36/4
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Gram Panchayath · Survey 36/3, 36/4
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Hoskote Planning Authority · plan HPA/CC/62/2024-25
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1250/304/PR/300126/008438
K-RERA registration
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 2 Jan 2026 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Page 1
Page 1 of 2 of the survey sketch. Filed with K-RERA: ADLR Survey Sketch, 2 pages, not in English.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 36/3 and 36/4 | |
|---|---|---|
| Land extent, Sy 36/3 and 36/4 | 36 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 3,642 sq m | |
| Khata | E Khatha · Gram Panchayath · 26 Sep 2024 | |
| Sale deed | Dated 8 Aug 2024 | |
| Sale deed in favour of | GARUDA CONSTRUCTIONS | |
| Building plan (Hoskote Planning Authority) | Sanctioned 16 Aug 2025 · No. HPA/CC/62/2024-25 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/095/2025 · issued 31 Jul 2025 · building height 34.95 m | Clear |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Mar 2029 |
| Land conversion | Converted 3 Oct 2015 · DC Bengaluru Rural | |
|---|---|---|
| Survey numbers | 36/3 and 36/4 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
2BHK · avg 74 m² 55.6%3BHK · avg 101 m² 44.4%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 50 | 794 |
| 3BHK | 40 | 1,083 |
| Sold, Q2 2026-27 | 27 / 90 | |
|---|---|---|
| Unsold, Q2 2026-27 | 63 | |
| Months to sell, derived from filed bookings | 16 months |
| Triaxis Splendour + | about 1 km | Locked | |
|---|---|---|---|
| Sowparnika Indradhanush Phase I | about 1.5 km | Locked | |
| Sowparnika Shivadhanush | about 1.5 km | Locked | |
| Riqueza Siri | about 2.5 km | Locked | |
| Garuda Park View This project | This project is the point the others are measured from | 31 Mar 2029 | 30% (27 of 90) | Not verified yet |
|---|---|---|---|---|
| Triaxis Splendour + | about 1 km | 31 Dec 2026 | 57% (59 of 104) | Locked |
| Sowparnika Indradhanush Phase I | about 1.5 km | 31 May 2027 | 99% (567 of 570) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 11 km, SIDDHARTHA LAYOUT KADUGODI | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Indoor Sports facility, built | 0% | |
| Gym, built | 0% | |
| Power Backup, built | 0% | |
| Air Conditioning, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.02 (92 covered spaces for 90 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 62 m
Across Hosakote, the water table sat 22.6 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 62 m, and it recovered 4.9 m over the year.
| Groundwater | Hosakote taluk average, July 2023: 22.6 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 22.6 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, Local authority (Gram panchayath) | |
| Nearest city water main | Not verified yet | |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
As the promoter reported itPossession date in the agreement

| Main structure | Not started · planned by 13 Jan 2029 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 1 Aug 2028 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 19% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 31 Mar 2029 | |
|---|---|---|
| Schedule end | 31 Mar 2029 | |
| RERA completion date | 31 Mar 2029 | |
| Work began, as filed | 1 Nov 2025 |
| Structure | RCC framed structure | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 34.95 m on the fire NOC · 34.93 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | UPVC windows | |
|---|---|---|
| Flooring | Vitrified tiles | |
| Toilet tiles | Anti-skid ceramic tiles (floor); Glazed tiles (walls, up to door height) | |
| Wiring | Copper wiring | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Power backup for lifts, common area lighting; Power backup in flats: 1 kVA | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Apr 2026, Jul 2026, Oct 2026 (3 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/095/2025 · issued 31 Jul 2025 · building height 34.95 m | |
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Apr 2026, Jul 2026, Oct 2026 (3 filed) | |
| Architect's certificate, registration | Dated 27 Oct 2025 | |
| Engineer's certificate, registration | Dated 27 Oct 2025 | |
| Chartered accountant's certificate, registration | Dated 25 Nov 2025 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹5.50 Cr 22%Development · ₹19.50 Cr 78%
| Estimated cost | ₹25.00 Cr | |
|---|---|---|
| Estimated cost, engineer's and chartered accountant's certificates | ₹25.00 Cr, same as the filing | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (27) 30%Unsold (63) 70%
| Sold, Q4 2025-26 | 4 / 90 · 86 available | |
|---|---|---|
| Sold, Q1 2026-27 | 15 / 90 · 75 available | |
| Sold, Q2 2026-27 | 27 / 90 · 63 available | |
| Unsold, Q2 2026-27 | 63 | |
| Sold in Q1 2026-27 | 11 | |
| Sold in Q2 2026-27 | 12 |
| Escrow bank | HDFC · BAGLUR CROSS, BANGALORE | |
|---|---|---|
| Designated account, collected | ₹3.13 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹2.97 Cr in Q2 2026-27 (95% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 2 Jan 2026 | |
| Building plan | Sanctioned 16 Aug 2025 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | HDFC · BAGLUR CROSS, BANGALORE | |

| One Residences At Sobha One World Ph4 W7 And 8 |
|---|
| about 4.5 km |
| Locked |
| One Residences At Sobha One World Ph5 W9,10,11 | about 4.5 km | Locked |
|---|
| One Residences At Sobha One World Ph6 W12,13,14 | about 4.5 km | Locked |
|---|
| Godrej Parkshire (Hoskote) | about 5 km | Locked |
|---|
| Neighbourhood Tree Park | about 6.5 km | Locked |
|---|
| Definer Upper Deck | about 7 km | Locked |
|---|
| Sowparnika Euphoria in the East | about 7 km | Locked |
|---|
| Godrej Woodscapes | about 7.5 km | Locked |
|---|
| Sowparnika Shivadhanush |
|---|
| about 1.5 km |
| 30 Nov 2027 |
| 99% (357 of 360) |
| Locked |
| Riqueza Siri | about 2.5 km | 30 Nov 2027 | 52% (66 of 128) | Locked |
|---|
| One Residences At Sobha One World Ph4 W7 And 8 | about 4.5 km | 30 Sep 2033 | 22% (98 of 440) | Locked |
|---|
| One Residences At Sobha One World Ph5 W9,10,11 | about 4.5 km | 28 Feb 2033 | 62% (449 of 721) | Locked |
|---|
| Projects within 4 km, counted | 17 (17 with an approximate location) | |
|---|---|---|
| Flats in them | 3,496 | |
| Booked | 2,382 of 3,496 (68%) | |
| Unsold | 1,114 | |
| Booked a month, pooled | 95 flats | |
| Months to sell, pooled | 12 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | about 11.5 km, Whitefield | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 16.5 |
| MG Road (CBD) | 25.5 |
| Manyata Tech Park | 21 |
| ITPL, Whitefield | 13.5 |
| Ecospace, Bellandur ORR | 22.5 |
| Electronic City Ph 1 | 31 |
| Sewage treatment plant |
|---|
| None within 3 km |
| Quarry | None within 3 km |
|---|
| Crematorium | None within 3 km |
|---|
| Prison | None within 3 km |
|---|
| Electrical substation | about 2.5 km to the south-west, named Hoskote on OpenStreetMap |
|---|