Fire NOCGBC(1)327/2013Filed as Fire Force Department, pp. 1, 3
Fire NOCbuilding height 44.9 mFiled as Fire Force Department, pp. 1, 3
Pollution board consentValid until 30 Jun 2028Issued 26 Jun 2024
K-RERA only
K-RERA only
15 pages2 factsAvailable
1 pageAvailable
2 pagesAvailable
4 pagesAvailable
8 pagesAvailable
8 pagesAvailable
1 pageAvailable
K-RERA only
1 pageAvailable
K-RERA only
K-RERA only
K-RERA only
K-RERA only
1 pageAvailable
2 pagesAvailable
4 pagesAvailable
1 page3 factsAvailable
1 pageAvailable
7 pagesAvailable
4 pagesAvailable
1 pageAvailable
Source: K-RERA project page and the documents filed there, as read by us. 9 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Unlock this full report₹99 for this report · opens Contract & costs, Title & ownership and Disputes & casesUnlock
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Epitome Elan is not plotted on the interactive atlas: its filing gives no coordinate precise enough to place a single building, only the surrounding locality.
•• ••• ••••
Title
Title report
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
Not verified yet
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate, Form 15
Survey sketch
Survey sketch filed with K-RERA
Not verified yet
Sketch, sanction and mutation vs KGIS map
Not verified yet
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
Not verified yet
Ownership
Share of sales revenue
Not verified yet
Joint development agreement
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
Valid as of this reportValidity ended
Approval letters
Building plan (BDA)
Not verified yet
Power NOC (BESCOM)
Filed with the registration
Fire NOC
GBC(1)327/2013 · building height 44.9 m
✓Clear
Environmental clearance
Filed with the registration
Airport height NOC
Filed with the registration
Pollution board (CFE)
consent order W-343954 · issued 26 Jun 2024 · valid until 30 Jun 2028
✓Clear
Water supply NOC
Filed with the registration
RERA
K-RERA
RERA extensions
Granted · Approved 18 Jul 2023
RERA complaints
0
RERA completion date
30 Sep 2024
Registration certificates
PRM/KA/RERA/1251/310/PR/190123/002297
EX/PRM/KA/RERA/1251/310/PR/230718/002297
Land use
Conversion order
Not verified yet
Not verified yet
Agreement for sale
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Fees
Agreement for sale
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
about 0.5 km from the locality centre, tertiary drain
Nearest lake, tank or pond
about 0.5 km from the locality centre, Kothanuru Lake
Height above nearest drain
Not verified yet
Amenities
Specification and Form 5
Not verified yet
Around it
Water
Groundwater, Bengaluru South taluk average
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
Water at a glance
Groundwater
Bengaluru South taluk average, July 2023: 16.9 m below ground
What it means
Not verified yet
Water below ground
16.9 m, the taluk average
Through the year
Not verified yet
Water supply, as filed
Local authority
Nearest city water main
Not verified yet
Distances
Measured from the site
Height above nearest drain
Not verified yet
Nearest drain
about 0.5 km from the locality centre, tertiary drain
Ground level
Not verified yet
Metro, operational
Not verified yet
Metro, under construction
Not verified yet
Connectivity
Road distance from the site
Not verified yet
Six city anchors · OSRM, no traffic
Not verified yet
Nuisances
Distance from the site
Locality only filed: no distance from the site to show
DOSL nuisance layer
Landfill or waste transfer station
about 2.5 km from the locality centre
Sewage treatment plant
about 1.5 km from the locality centre
Quarry
about 2 km from the locality centre, named Anjanapura Quarries on OpenStreetMap
Crematorium
None within 3 km of the locality centre
Prison
None within 3 km of the locality centre
Electrical substation
about 1.5 km from the locality centre, named Khodays Glass Factory Substation on OpenStreetMap
Quarterly return
Main structure
Not verified yet
Electrical and plumbing finishing
Not verified yet
Internal roads
Not verified yet
Club house
Not verified yet
Completion
Completed, occupancy certificate 27 Sep 2024
Completion, accountant
Not verified yet
Dates
Dates
Filed dates
Possession, agreement
Not verified yet
Schedule end
31 Dec 2022
RERA completion date
30 Sep 2024
Work began, as filed
1 Jan 2019
Specified structure
What the promoter specified · not an inspection
Structure
Not verified yet
Foundation
Not verified yet
Wall material
Not verified yet
Wall thickness
Not verified yet
Concrete / steel grade
Not verified yet
Building heights, fire NOC
44.9 m on the fire NOC
Specification sheet, page 1
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.