Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | ||
| 1 Lakh Multi Storied Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation | Apartment | 323 sqft carpet (as filed) | Jul 2023 |
| 7hills CourtyardApplied for completion 22/05/2024 | 7HILLS PROPERTIES | Plot | ~1,200 sqft (estimate: filed carpet plus 25%) | Dec 2024 |
| 96 Brick Wood AvenueActive · 9% built | Cinoti ventures LLP | Apartment | 851–1,084 sqft carpet (as filed) | May 2031 |
| Aratt-Escapes Phase 2Active · 67% built | ARATT CITY TOWERS LLP | Plot | ~1,670–2,120 sqft (estimate: filed carpet plus 25%) | Apr 2028 |
| Bellevue NestApplied for completion 03/03/2026 | AFFAIRAL GLOBAL FASHION PRIVATE LIMITED | Plot | – | Mar 2026 |
| Canterbury LakesideLapsed · completion date passed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 15 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched.
| – |
| Not verified |
| Location & risks | – | 3 | – | Review |
|---|
| Construction & progress | – | 1 | – | Review |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Vyasti Project |
| Plot |
| – |
| Nov 2025 |
| Canterbury Meadows Phase 2Applied for completion 30/10/2024 | Arunapanchami Estates Private Limited | Plot | ~1,160–1,500 sqft (estimate: filed carpet plus 25%) | Nov 2023 |
| Canterbury Orchards IILapsed · completion date passed | SLNS AVYUKTHA HOMES | Plot | – | Mar 2023 |
8 of 42 other projects in North Bengaluru, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Earthis Akash in the interactive atlas
Approval or registration
Land use converted
DC Bengaluru · Survey 29
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 29
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan PRL-46/2022-23/672
K-RERA filing, approvals
Approval or registration
Khata issued
E Khatha · 0 · Survey 29
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1251/472/PR/041023/006304
K-RERA registration ·
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 21 Aug 2023 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Page 1
Page 1 of 3 of the survey sketch. Filed with K-RERA: Aakarband Sy Sketch and Phodi, 3 pages.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched.
| Survey numbers | 29 | |
|---|---|---|
| Land extent, Sy 29 | 10 Acres 13 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Khata | E Khatha · 0 · 22 Aug 2023 | |
| Sale deed | Dated 31 Jul 2013 | |
| Survey | Owners on the RTC | RTC extent | Filed extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|
| Sy. No. 29 | 5 | 21 acres 4 guntas | 10 acres 13 guntas | Differs: 11 acres 10 guntas apart | Not read yet |
Valid as of this reportValidity ended
| Building plan (BDA) | Sanctioned 27 Jun 2023 · No. PRL-46/2022-23/672 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-338645 · issued 18 Jul 2023 · valid until 13 Jul 2028 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2025 |
| Land conversion | Converted 13 May 2009 · DC Bengaluru | |
|---|---|---|
| Survey numbers | 29 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
| Shriram Solitaire | about 5 km | Locked | |
|---|---|---|---|
| Rubby Castle 1 | about 5.5 km | Locked | |
| Century Kindle Phase 1 | 5.7 km | Locked | |
| Vruksha Greens | 5.9 km | Locked | |
| Assetz Miru & Miyo | about 6.5 km | Locked |
| Earthis Akash This project | This project is the point the others are measured from | 31 Dec 2025 | Not filed | Not verified yet |
|---|---|---|---|---|
| Shriram Solitaire | about 5 km | 15 May 2026 | 100% (269 of 269) | Locked |
| Rubby Castle 1 | about 5.5 km | 30 Apr 2029 | 25% (8 of 32) | Locked |
| Century Kindle Phase 1 |
| Projects within 4 km, counted | 2 (2 with an approximate location) | |
|---|---|---|
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Agriculture | Review |
|---|---|---|
| Nearest high-tension line | A 66 kV line crosses the site, its corridor taking about 5% (about 4,550 m²), with 1 transmission tower standing inside the outline | Review |
| Nearest government-flagged flood location | 5.6 km, Shettihalli & Chikkasandra Village | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 1.5 km to the north, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 90 m to the west, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
| Kitchen handover | Not verified yet | |
|---|---|---|
| Sewage plant | Sewage treatment plant | |
| Power backup | Not verified yet | |
| Possession, agreement | 31 Dec 2025 | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 31 Dec 2025 | Review |
| Work began, as filed | 1 Sep 2023 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Not verified yet | |
| Sewage plant | Sewage treatment plant | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect's certificate, registration | Dated 12 Sep 2023 · site inspected 15 Aug 2023 | |
| Engineer's certificate, registration | Dated 12 Sep 2023 | |
| Chartered accountant's certificate, registration | Dated 11 Sep 2023 | |
Land · ₹43.37 Cr 82%Development · ₹9.52 Cr 18%
| Estimated cost | ₹52.88 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹8.17 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | ICICI Bank · MG ROAD BANGALORE | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 21 Aug 2023 | Review |
| Building plan (BDA) | Sanctioned 27 Jun 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | ICICI Bank · MG ROAD BANGALORE | |
| Sri Rama Enclave | about 8 km | Locked |
|---|
| Royal Enclave | about 9.5 km | Locked |
|---|
| Legacy Salvador | about 10 km | Locked |
|---|
| 4square Park Sierra | 9.9 km | Locked |
|---|
| Godrej Aveline | 10.2 km | Locked |
|---|
| Riviera Glade | about 10.5 km | Locked |
|---|
| Assetz Soho & Sky | 10.9 km | Locked |
|---|
| 5.7 km |
| 14 Mar 2031 |
| 73% (336 of 458) |
| Locked |
| Vruksha Greens | 5.9 km | 30 Jun 2027 | 30% (24 of 80) | Locked |
|---|
| Assetz Miru & Miyo | about 6.5 km | 31 Mar 2031 | 6% (20 of 350) | Locked |
|---|
| Sri Rama Enclave | about 8 km | 30 Sep 2026 | 61% (39 of 64) | Locked |
|---|
| Flats in them |
|---|
| 185 |
| Booked | 51 of 185 (28%) |
|---|
| Unsold | 134 |
|---|
| Booked a month, pooled | 0 flats |
|---|
| Months to sell, pooled | 804 months |
|---|
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 32.6 m
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 11.4 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (Shivakote Grama Panchayathi) | |
| Nearest city water main | 4.7 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 1.5 km to the north, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 7.7 km, Chikkabidarakallu | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 22.8 |
| MG Road (CBD) | 18.4 |
| Manyata Tech Park | 14.0 |
| ITPL, Whitefield | 28.2 |
| Ecospace, Bellandur ORR | 27.9 |
| Electronic City Ph 1 | 35.6 |
| Landfill or waste transfer station | 2.4 km to the east, named Mavallipura BBMP Landfill on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | 2.5 km to the south-east, named MS Palya Crematorium on OpenStreetMap | |
| Prison | None within 3 km | |
| Electrical substation | 1.2 km to the south-east, named Bylakere 66kV Substation on OpenStreetMap |