| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| 11 Campbell KrishviRegistered · no quarterly update yet | KRISHVI PROJECTS PRIVATE LIMITED | Apartment | 1,888 sqft carpet (as filed) | Dec 2026 |
| Aashrithaa Divine Phase - 2Completed (regulator flag) | AASHRITHAA PROPERTIES PRIVATE LIMITED | Plot | – | Completed |
| CelestiaLapsed · completion date passed | PYRAMID PROPERTIES | Apartment | – | May 2022 |
| Comfort VimalaprabhaLapsed · completion date passed | COMFORT BUILDERS & DEVELOPERS | Apartment | – | Sep 2024 |
| Df Silverline Queens TerracesCompleted · OC 18-07-2018 | DF SILVERLINE CONSTRUCTIONS | Apartment | 1,380 sqft carpet (as filed) | Completed |
| Embassy Habitat | Embassy Group | Apartment | 1,100–3,427 sqft | – |
Title & ownership
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 56 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Valuation |
|---|
| – |
| – |
| – |
| Not verified |
| Location & risks | – | 1 | – | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | – | Review |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Emmanuel Ashley ParkLapsed · completion date passed | EMMANUEL ESTATES | Apartment | 831 sqft carpet (as filed) | Dec 2024 |
| Eternity Bs49Registered · no quarterly update yet | Eternity Structures Private Limited | Apartment | 947–969 sqft carpet (as filed) | Apr 2028 |
8 of 32 other projects in Vasanth Nagar, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Chartered 1956 in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
| Building plan (BBMP) | Sanctioned 19 Apr 2024 · No. BBMP/Addl.Dir/JDNORTH/0098/23-24 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC (1 of 2) | KSFES/NOC/225/2023 · issued 29 Nov 2023 · building height 26.95 m | Clear |
| Fire NOC (2 of 2) | KSFES/NOC/225/2023 · issued 29 Nov 2023 | Clear |
| SEIAA | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water and sewerage NOC (BWSSB) | issued 9 Oct 2023 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Jun 2028 |
| Land conversion | Declared not converted | |
|---|---|---|
| Survey numbers | 78-123-4 |
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
4BHK · avg 278 m² 100%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 4BHK | 7 | 2,988 |
| Sold, Q2 2026-27 | 1 / 7 | |
|---|---|---|
| Unsold, Q2 2026-27 | 6 | |
| Months to sell, derived from filed bookings | Too few bookings to project (1 flat booked in 9 months) |
| Renaissance Srichakra | about 3 km | Locked | |
|---|---|---|---|
| Magnolia Delight | about 3.5 km | Locked | |
| Vista Padmalaya | about 3.5 km | Locked | |
| Vista Svara | about 4 km | Locked | |
| Birla Tisya | about 6 km | Locked |
| Chartered 1956 This project | This project is the point the others are measured from | 30 Jun 2028 | 14% (1 of 7) | Not verified yet |
|---|---|---|---|---|
| Renaissance Srichakra | about 3 km | 11 Aug 2027 | 63% (5 of 8) | Locked |
| Magnolia Delight | about 3.5 km | 31 Mar 2028 | 21% (10 of 48) | Locked |
| Vista Padmalaya |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 1 km, Miller Tank, | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | Review |
| Electricity, built | 0% | |
| Gym, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 2.86 (20 covered spaces for 7 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported itPossession date in the agreement

| Main structure | 100% · planned by 30 Jun 2026 | |
|---|---|---|
| Electrical and plumbing finishing | 30% · planned by 30 Mar 2028 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 95% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 30 Jun 2028 | |
|---|---|---|
| Schedule end | 30 Mar 2028 | |
| RERA completion date | 30 Jun 2028 | |
| Work began, as filed | 1 Jun 2024 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 26.95 m on the fire NOC · 26.95 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 11.89 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety (1 of 2) | KSFES/NOC/225/2023 · issued 29 Nov 2023 · building height 26.95 m | |
| Fire safety (2 of 2) | KSFES/NOC/225/2023 · issued 29 Nov 2023 | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 24 May 2024 · site inspected 20 Mar 2024 | |
| Engineer's certificate, registration | Dated 22 May 2024 | |
| Chartered accountant's certificate, registration | Dated 8 Jun 2024 | |
| Chartered accountant, Form 4 | Dated 11 Jul 2026 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹18.93 Cr 34.4%Development · ₹36.10 Cr 65.6%
| Estimated cost | ₹55.03 Cr | |
|---|---|---|
| Estimated cost, Form 4 Q4 2025-26 | ₹79.23 Cr | |
| Cost incurred | ₹20.18 Cr | |
| Cost left | ₹59.06 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (1) 14.3%Unsold (6) 85.7%
| Sold, Q3 2025-26 | 0 / 7 · 7 available | |
|---|---|---|
| Sold, Q4 2025-26 | 0 / 7 · 7 available | |
| Sold, Q1 2026-27 | 1 / 7 · 6 available | |
| Sold, Q2 2026-27 | 1 / 7 · 6 available | |
| Unsold, Q2 2026-27 | 6 | |
| Sold in Q4 2025-26 | 0 | |
| Sold in Q1 2026-27 | 1 | |
| Sold in Q2 2026-27 | 0 |
| Escrow bank | Bank of Baroda · VICTORIA ROAD | |
|---|---|---|
| Designated account, collected | ₹11.30 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹11.65 Cr in Q2 2026-27 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 5 | |
|---|---|---|
| Marked completed | 1 | |
| Past promised date, not completed | 2 | |
| Complaints filed against the promoter | 2 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 19 Apr 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Bank of Baroda · VICTORIA ROAD | |

| Ranka Iris | about 6 km | Locked |
|---|
| Lodha Mirabelle | about 7.5 km | Locked |
|---|
| Mirabelle Phase 2 | about 7.5 km | Locked |
|---|
| Century Regalia (Project 2) | about 7.5 km | Locked |
|---|
| Royal Enclave | about 8 km | Locked |
|---|
| Assetz Soho & Sky | about 8 km | Locked |
|---|
| Sri Rama Enclave | about 8.5 km | Locked |
|---|
| about 3.5 km |
| 30 Apr 2027 |
| 40% (4 of 10) |
| Locked |
| Vista Svara | about 4 km | 30 Oct 2026 | 50% (16 of 32) | Locked |
|---|
| Birla Tisya | about 6 km | 31 Dec 2026 | 100% (392 of 392) | Locked |
|---|
| Ranka Iris | about 6 km | 30 Apr 2026 | 62% (8 of 13) | Locked |
|---|
| Projects within 4 km, counted | 22 (22 with an approximate location) | |
|---|---|---|
| Flats in them | 611 | |
| Booked | 281 of 611 (46%) | |
| Unsold | 330 | |
| Booked a month, pooled | 6 flats | |
| Months to sell, pooled | 52 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 26.8 m
Across Bengaluru North, the water table sat 22.7 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 26.8 m, and it fell 4.9 m over the year.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 22.7 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | Not verified yet | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 1.5 km, Dr. B.R. Ambedkar Stn., Vidhan Soudha | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 26 |
| MG Road (CBD) | 2.5 |
| Manyata Tech Park | 6.5 |
| ITPL, Whitefield | 16 |
| Ecospace, Bellandur ORR | 12.5 |
| Electronic City Ph 1 | 19.5 |
| Landfill or waste transfer station | about 1.5 km | |
|---|---|---|
| Sewage treatment plant | about 2 km, named ETP on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km, named C Station on OpenStreetMap |