Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | 1 | – | – | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
Part of the full report. Unlock all 4 sections
| “smilee Celestial”Lapsed · completion date passed | Blue Valley Properties Pvt Ltd | Plot | – | Aug 2019 |
| 1 Lakhmulti Storey Housing DoddanagamangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 1 Lakhmulti Storey Housing GoolimangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation Pvt Ltd | Apartment | 323–484 sqft carpet (as filed) | Mar 2024 |
| A B AnanthaActive · 84% built | Amaravathi Builders | Apartment | 753–972 sqft carpet (as filed) | Jan 2027 |
| Abhee NandikaCompleted · OC 22-04-2022 | ABHEE DEVELOPERS | Apartment | 786 sqft carpet (as filed) | Completed |
| Abhee Prakruthi Villa PlotsCompleted (regulator flag) |
Title & ownership
Approvals
Disputes & cases
Contract & costs
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 62 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Valuation |
|---|
| – |
| – |
| – |
| Locked |
| Location & risks | – | 2 | – | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| M/s.Abhee Developers |
| Plot |
| – |
| Completed |
| Abhee PrideCompleted · OC 18-04-2026 | ABHEE VENTURES PRIVATE LIMITED | Apartment | 688–842 sqft carpet (as filed) | Completed |
| Abhee Serenity SpringsActive · 35% built | Abhee Ventures | Apartment | 1,000–1,575 sqft | Jun 2030 |
8 of 235 other projects in Electronic City, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Casagrand Vivacity in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Valuation and Disputes & cases for this project, yours to read for good.
| Building plan (BDA) | Sanctioned 18 Apr 2024 · No. BDA/BL/E.S/T.A-1/H.S-2/E/04/2024-25 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 2 | |
| RERA completion date | 4 Apr 2029 |
| Land conversion | Converted 14 Mar 2024 · DC Bengaluru | |
|---|---|---|
| Survey numbers | 93 · 99 |
₹99 for this report opens Contract & costs, Title & ownership, Valuation and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Valuation and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Valuation and Disputes & cases for this project, yours to read for good.
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | 91% Industrial (hi-tech), 9% Valley / drain buffer | Review |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 4.2 km, G K LAYOUT | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 500 m to the north, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 180 m to the north-west, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Indoor Sports facility, built | 0% | |
| Gym, built | 0% | |
| Power Backup, built | 0% | |
| Air Conditioning, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.97 (695 covered spaces for 717 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it

| Main structure | 20% · planned by 23 Dec 2024 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 17 May 2026 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 35% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 4 Apr 2029 | |
| RERA completion date | 4 Apr 2029 | |
| Completion date, agreement | 4 Apr 2029 | |
| Work began, as filed | 30 Apr 2024 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 29.95 m filed, 2 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 18 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Site inspected 31 Mar 2023 | |
| Engineer's certificate, registration | Dated 19 Apr 2024 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹97.59 Cr 18.1%Development · ₹441.90 Cr 81.9%
| Estimated cost | ₹539.49 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹361.55 Cr | |
| Estimated cost, Form 4 Q2 2026-27 | ₹479.14 Cr | |
| Cost incurred | ₹222.55 Cr | |
| Cost left | ₹265.80 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (714) 99.6%Unsold (3) 0.4%
| Sold, Q3 2025-26 | 714 / 717 · 3 available | |
|---|---|---|
| Sold, Q4 2025-26 | 715 / 717 · 2 available | |
| Sold, Q1 2026-27 | 717 / 717 · 0 available | |
| Sold, Q2 2026-27 | 714 / 717 · 3 available | |
| Unsold, Q2 2026-27 | 3 | |
| Sold in Q4 2025-26 | 1 | |
| Sold in Q1 2026-27 | 2 | |
| Sold in Q2 2026-27 | 3 bookings cancelled or corrected (717 → 714 sold) |
| Escrow bank | KOTAK MAHINDRA BANK · ULSOOR | |
|---|---|---|
| Designated account, collected | ₹608.01 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹5.15 Cr in Q2 2026-27 (1% of that quarter's deposits) | |
| Amount deposited in the quarter, Form 4 | ₹7,81,15,489 | |
| Amount withdrawable, Form 4 | ₹2,04,58,80,493 | |
| Escrow account, Q1 2026-27 | Opened at ₹39.2 L, ₹7.81 Cr deposited from sales, ₹8.18 Cr withdrawn | |
| Share of collections deposited in escrow | 67% | |
| Sale proceeds realised, Q1 2026-27 | ₹11,74,27,304 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 2 | |
| K-RERA registrations under this promoter | 19 | |
|---|---|---|
| Marked completed | 3 | |
| Past promised date, not completed | 8 | |
| Complaints filed against the promoter | 167 | |
| Other phases under this promoter name | 18 | |
| With a filed extension or completion | 3 (2 completed, 1 extended) | |
| Average schedule slip | 9 months |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BDA) | Sanctioned 18 Apr 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | KOTAK MAHINDRA BANK · ULSOOR | |

Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 28.7 m
Across Anekal, the water table sat 21.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 28.7 m, and it recovered 3.3 m over the year.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 21.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | 1.4 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 500 m to the north, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 2.1 km, Huskur Road | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 38.6 |
| MG Road (CBD) | 16.9 |
| Manyata Tech Park | 22.8 |
| ITPL, Whitefield | 15.6 |
| Ecospace, Bellandur ORR | 8.3 |
| Electronic City Ph 1 | 2.2 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 1.0 km to the north-east | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.8 km to the west, named Tata P.P. Solar on OpenStreetMap |