Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 4square Park SierraActive · 29% built | 4SQUARE ESTATES | Apartment | 1,083 sqft carpet (as filed) | Dec 2029 |
| Adithya TranquilLapsed · completion date passed | ADITHYA DEVELOPERS | Apartment | – | Jan 2023 |
| Affinity GardeniaActive · 95% built | AFFINITY PROPERTIES LLP | Apartment | 682–853 sqft carpet (as filed) | Dec 2026 |
| After the RainCompleted · OC 30-04-2022 | Total Environment | Villa | 3,184–5,182 sqft | Completed |
| After the Rain - Phase II ACompleted · OC 10-01-2024 | Total Environment Building Systems Private Limited | Mixed development | 290–2,669 sqft carpet (as filed) | Completed |
| After the Rain Phase IIIActive · 3% built | TOTAL ENVIRONMENT BUILDING SYSTEMS PVT LTD | Apartment |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 49 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 2,643–6,964 sqft carpet (as filed) |
| Apr 2032 |
| After The Rain-Phase IibLapsed · completion date passed | Total Environment Building Systems Private Limited | Apartment | – | Aug 2026 |
| After the Rain-Phase IicActive · 48% built | Total Environment Building Systems Private limited | Villa | 3,535 sqft carpet (as filed) | Apr 2028 |
8 of 120 other projects in Yelahanka, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Aurora in the interactive atlas
Approval or registration
Land use converted
Deputy commissioner, Bangalore district · Survey 34/1
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 34/1, 407
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 34/1, 407
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP, Bangalore · Survey 407
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 34/1
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan Project No. PRJ/14464/23-24 and LP No.BBMP/Addl.Dir/JDNORTH/0120/23-24
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/309/PR/141124/007229
K-RERA registration ·
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 7 Nov 2024 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 34/1, 424/2483/410/D4-386 SFS 407 | |
|---|---|---|
| Land extent, Sy 34/1 | 1 Acre, 2 Gunta | |
| Land extent, Sy 424/2483/410/D4-386 SFS 407 | 199.5 (unit not stated) | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 4,438 sq m | |
| Khata | A Khatha · BBMP · 31 Oct 2011; A Khatha · BBMP, Bangalore · 25 Jun 2011 | |
| Sale deed | Dated 23 Mar 2011 | |
| Title deed | Consideration ₹3.00 Cr | |
| Building plan (BBMP) | Sanctioned 3 Oct 2024 · No. Project No. PRJ/14464/23-24 and LP No.BBMP/Addl.Dir/JDNORTH/0120/23-24 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/023/2024 · issued 30 Apr 2024 · building height 65.1 m | Clear |
| Environmental clearance | Not verified yet | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water and sewerage NOC (BWSSB) | issued 19 Apr 2024 | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2027 |
| Land conversion | 1 of 2 parcels converted | |
|---|---|---|
| Sy 34/1 | Converted 13 Oct 2008 · Deputy commissioner, Bangalore district | |
| Sy 424/2483/410/D4-386 SFS 407 | Declared not converted | |
| Survey numbers | 34/1 · 424/2483/410/D4-386 SFS 407 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
TYPE 5 3BHK - 3T - TYPE 1 with 2 balconies ·… 16.7%TYPE 6 3BHK - 3T - TYPE 2 with 2 balconies ·… 16.7%TYPE 7 3BHK - 3T - TYPE 3 with 2 balconies ·… 16.7%TYPE 1 3BHK - 3T - TYPE 1 with 2 balconies &… 8.3%6 other types 41.7%
| TYPE 1 3BHK - 3T - TYPE 1 with 2 balconies & 1 private terrace | 6 | 1,163 |
| TYPE 2 3BHK - 3T - TYPE 2 with 2 balconies & 1 private terrace | 6 | 1,206 |
| TYPE 3 3BHK - 3T - TYPE 3 with 2 balconies & 1 private terrace | 6 | 1,216 |
| TYPE 4A 3BHK - 3T + PREMIUM with 2 balconies & 2 private terrace | 3 | 1,345 |
| TYPE 4B 3BHK - 3T + PREMIUM with 2 balconies & 2 private terrace | 3 | 1,345 |
| TYPE 5 3BHK - 3T - TYPE 1 with 2 balconies | 12 | 1,152 |
| TYPE 6 3BHK - 3T - TYPE 2 with 2 balconies | 12 | 1,206 |
| TYPE 7 3BHK - 3T - TYPE 3 with 2 balconies | 12 | 1,216 |
| TYPE 8A 3BHK - 3T + PREMIUM with 2 balconies & 1 private terrace | 6 | 1,335 |
| TYPE 8B 3BHK - 3T + PREMIUM with 2 balconies & 1 private terrace | 6 | 1,335 |
| Sold, Q1 2026-27 | 49 / 72 | |
|---|---|---|
| Unsold, Q1 2026-27 | 23 | |
| Months to sell, derived from filed bookings | 9 months |
| Century Kindle Phase 1 | about 1 km | Locked | |
|---|---|---|---|
| Shriram Solitaire | about 1.5 km | Locked | |
| Rubby Castle 1 | about 3 km | Locked | |
| Legacy Salvador | about 3.5 km | Locked | |
| 4square Park Sierra | about 3.5 km | Locked |
| Aurora This project | This project is the point the others are measured from | 31 Dec 2027 | 68% (49 of 72) | Not verified yet |
|---|---|---|---|---|
| Century Kindle Phase 1 | about 1 km | 14 Mar 2031 | 73% (336 of 458) | Locked |
| Shriram Solitaire | about 1.5 km | 15 May 2026 | 100% (269 of 269) | Locked |
| Rubby Castle 1 |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 0.5 km, Attur, Near Dairy Circle | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Gym, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.25 (90 covered spaces for 72 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 32.6 m
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 11.4 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | Not verified yet | |
As the promoter reported it

| Main structure | 10% · planned by 30 Jun 2026 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 28 Sep 2026 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 18% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 27 Nov 2026 | |
| RERA completion date | 31 Dec 2027 | |
| Work began, as filed | 1 Nov 2024 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 65.1 m on the fire NOC · 65.7 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 121.8 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026 (3 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/023/2024 · issued 30 Apr 2024 · building height 65.1 m | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026 (3 filed) | |
| Architect's certificate, registration | Dated 8 Oct 2024 | |
| Engineer's certificate, registration | Dated 8 Oct 2024 | |
| Chartered accountant's certificate, registration | Dated 5 Oct 2024 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹27.98 Cr 27.5%Development · ₹73.94 Cr 72.5%
| Estimated cost | ₹101.93 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹101.93 Cr, same as the filing | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (49) 68.1%Unsold (23) 31.9%
| Sold, Q3 2025-26 | 34 / 72 · 38 available | |
|---|---|---|
| Sold, Q4 2025-26 | 38 / 72 · 34 available | |
| Sold, Q1 2026-27 | 49 / 72 · 23 available | |
| Unsold, Q1 2026-27 | 23 | |
| Sold in Q4 2025-26 | 4 | |
| Sold in Q1 2026-27 | 11 |
| Escrow bank | INDUSIND BANK · MG Road | |
|---|---|---|
| Designated account, collected | ₹2.03 Cr in Q1 2026-27 | |
| Designated account, withdrawn | ₹2.19 Cr in Q1 2026-27 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 7 Nov 2024 | |
| Building plan (BBMP) | Sanctioned 3 Oct 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | INDUSIND BANK · MG Road | |

| Sri Rama Enclave | about 4 km | Locked |
|---|
| Godrej Aveline | about 4.5 km | Locked |
|---|
| Assetz Soho & Sky | about 5 km | Locked |
|---|
| Cumins Sanctum | about 5.5 km | Locked |
|---|
| Tnm Lakeview | about 6 km | Locked |
|---|
| Assetz Soho & Sky Phase 1b | about 6 km | Locked |
|---|
| Assetz Miru & Miyo | about 6 km | Locked |
|---|
| about 3 km |
| 30 Apr 2029 |
| 25% (8 of 32) |
| Locked |
| Legacy Salvador | about 3.5 km | 31 Dec 2026 | 71% (119 of 167) | Locked |
|---|
| 4square Park Sierra | about 3.5 km | 31 Dec 2029 | 8% (14 of 170) | Locked |
|---|
| Sri Rama Enclave | about 4 km | 30 Sep 2026 | 61% (39 of 64) | Locked |
|---|
| Projects within 4 km, counted | 35 (35 with an approximate location) | |
|---|---|---|
| Flats in them | 7,191 | |
| Booked | 3,921 of 7,191 (55%) | |
| Unsold | 3,270 | |
| Booked a month, pooled | 125 flats | |
| Months to sell, pooled | 26 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 3.5 km, Yelahanka | |
| Kempegowda Airport | 18.5 |
| MG Road (CBD) | 14.5 |
| Manyata Tech Park | 8.5 |
| ITPL, Whitefield | 22.5 |
| Ecospace, Bellandur ORR | 23 |
| Electronic City Ph 1 | 31.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1 km, named Yelahanka Waste Water Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km, named Yelahanka on OpenStreetMap |