Source: K-RERA project page and the documents filed there, as read by us. 42 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 2 | – | Review |
| Approvals | 1 | – | 3 | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | 2 | Review |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | 2 | Clear |
| Loan & collateral | – | 2 | – | Review |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 379 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
All 404 projects in Whitefield → · Assetz Property Group's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Assetz Marq Phase 3b in the interactive atlas
Approval or registration
Land use converted
KIADB · Survey 167/1, 167/2, 167/3, 167/4, 159/1
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of Sai Lakshmi Industries Pvt Ltd · Survey 167/1, 167/2, 167/3, 167/4, 159/1
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · Kannamangala Gram Panchayath · Survey 167/1, 167/2, 167/3, 167/4, 159/1
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan BDA/LP/EM/EO-01/TA-04/E/26/2022-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/091122/005433
K-RERA registration ·
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 17 Oct 2022 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | Altico Capital India Ltd · ₹159.25 Cr disbursed | |
| Mortgage on the project land | Declared by the promoter | Review |
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 167/1 167/2 167/3 167/4 159/1 | |
|---|---|---|
| Land extent, Sy 167/1 167/2 167/3 167/4 159/1 | 22 Acres 17 guntas/90750 sq mt | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 10,680 sq m | |
| Khata | A Khatha · Kannamangala Gram Panchayath · 10 Jan 2019 | |
| Sale deed | Dated 19 May 2007 | |
| Sale deed in favour of | Sai Lakshmi Industries Pvt Ltd | |
Valid as of this reportValidity ended
| Building plan (BDA) | Sanctioned 27 Oct 2022 · No. BDA/LP/EM/EO-01/TA-04/E/26/2022-23 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/135/2021 · issued 25 Aug 2021 | Clear |
| Environmental clearance | SEIAA 30 CON 2019 · issued 18 Dec 2019 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order W-352263 · issued 9 Jan 2026 · valid until 30 Jun 2028 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 1 | |
| RERA completion date | 31 Jul 2027 |
| Land conversion | Converted 19 Dec 1995 · KIADB | |
|---|---|---|
| Survey numbers | 167/1 167/2 167/3 167/4 159/1 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Studio, 1BHK, 3BHK & 4BHK · avg 100 m² 100%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| Studio, 1BHK, 3BHK & 4BHK | 384 | 1,073 |
| Sold, Q4 2025-26 | 383 / 384 | |
|---|---|---|
| Unsold, Q4 2025-26 | 1 |
| Assetz Bloom & Dell - Phase 2 | 2.0 km | Locked | |
|---|---|---|---|
| Nirmaanika Aria | about 2.5 km | Locked | |
| Godrej Splendour Phase II | about 2.5 km | Locked | |
| Sowparnika Euphoria in the East | 2.4 km |
| Assetz Marq Phase 3b This project | This project is the point the others are measured from | 31 Jul 2027 | 100% (383 of 384) | Not verified yet |
|---|---|---|---|---|
| Assetz Bloom & Dell - Phase 2 | 2.0 km | 31 Oct 2027 | 100% (238 of 238) | Locked |
| Nirmaanika Aria | about 2.5 km | 31 Dec 2027 | 32% (22 of 68) | Locked |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 220 kV, 70 m from the filed location | Clear |
| Nearest government-flagged flood location | 2.8 km, SAI BABA ASHRAM KADUGODI | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 1.4 km to the south-east, Dakshina Pinakini, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | 310 m to the south, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 100% | |
| Electricity, built | 85% | |
| Outdoor Sports facility, built | 100% | |
| Swimming Pool, built | 100% | |
| Parks, built | 100% | |
| Piped Gas, built | 100% | |
| Air Conditioning, built | 100% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.03 (397 covered spaces for 384 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it

| Main structure | 100% · planned by 28 Feb 2026 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 30 Apr 2027 | |
| Internal roads | Not verified yet | |
| Club house | 100% | |
| Completion | 100% | |
| Completion, accountant | 94.9% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 30 Apr 2027 | |
| RERA completion date | 31 Jul 2027 | |
| Work began, as filed | 1 Jul 2022 | |
| Structure | RCC structure | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 91.05 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | UPVC windows (sliding) | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles | Ceramic tiles (floor) | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | 100% power backup for lifts; Partial backup in flats (lights, fans or points only) | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Mar 2026, Apr 2026 (2 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/135/2021 · issued 25 Aug 2021 | |
| Environmental clearance | SEIAA 30 CON 2019 · issued 18 Dec 2019 | |
| Architect, quarterly | Form 5 · Mar 2026, Apr 2026 (2 filed) | |
| Chartered accountant's certificate, registration | Dated 2 Nov 2022 | |
Land · ₹37.38 Cr 14.1%Development · ₹227.53 Cr 85.9%
| Estimated cost | ₹264.91 Cr | |
|---|---|---|
| Estimated cost, Form 4 Q3 2025-26 | ₹361.89 Cr | |
| Cost incurred | ₹343.50 Cr (94.9% of the estimate) | |
| Cost left | ₹18.40 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹40.41 Cr | |
| Land cost revision | Not verified yet | |
Sold (383) 99.7%Unsold (1) 0.3%
| Sold, Q3 2025-26 | 383 / 384 · 1 available | |
|---|---|---|
| Sold, Q4 2025-26 | 383 / 384 · 1 available | |
| Unsold, Q4 2025-26 | 1 | |
| Sold in Q4 2025-26 | 0 |
| Escrow bank | HDFC · Richmond Road | |
|---|---|---|
| Designated account, collected | ₹74.5 L in Q4 2025-26 | |
| Designated account, withdrawn | ₹49.8 L in Q4 2025-26 (67% of that quarter's deposits) | |
| Amount withdrawable, Form 4 | ₹3,43,49,68,016 | |
| Net amount withdrawable, Form 4 | ₹2,03,34,143 | |
| Withdrawn from the escrow account to date | ₹3,41,46,33,874 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 1 | |
| Other phases under this promoter name | 3 | |
|---|---|---|
| With a filed extension or completion | 3 (2 completed, 1 extended) | |
| Average schedule slip | 3 months |
| Developer's project loan | Altico Capital India Ltd · ₹159.25 Cr disbursed | |
|---|---|---|
| Records searched to | 17 Oct 2022 | Review |
| Building plan (BDA) | Sanctioned 27 Oct 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | HDFC · Richmond Road | |

Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of 5 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Assetz Bloom & Dell - Phase 2, price locked; Sowparnika Euphoria in the East, price locked; Godrej Splendour, price locked; Sattva Songbird, price locked; Godrej Parkshire (Hoskote), price locked.
| Godrej Splendour | 2.7 km | Locked |
|---|
| Godrej Woodscapes | about 3 km | Locked |
|---|
| Sattva Songbird | 3.1 km | Locked |
|---|
| Godrej Parkshire (Hoskote) | 3.4 km | Locked |
|---|
| One Residences At Sobha One World Ph4 W7 And 8 | about 4 km | Locked |
|---|
| One Residences At Sobha One World Ph5 W9,10,11 | about 4 km | Locked |
|---|
| One Residences At Sobha One World Ph6 W12,13,14 | about 4 km | Locked |
|---|
| Vintage Valley | about 4.5 km | Locked |
|---|
| Godrej Splendour Phase II |
|---|
| about 2.5 km |
| 14 Jan 2028 |
| 88% (782 of 891) |
| Locked |
| Sowparnika Euphoria in the East | 2.4 km | 31 May 2031 | 99% (1,086 of 1,102) | Locked |
|---|
| Godrej Splendour | 2.7 km | 20 Mar 2027 | 98% (1,135 of 1,161) | Locked |
|---|
| Godrej Woodscapes | about 3 km | 31 Jan 2029 | 100% (2,165 of 2,168) | Locked |
|---|
| Rent, 3BHK, 3 km | ₹50,000 /mo · 17 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹32,000 /mo · 42 listings | |
| Rent, 1BHK, 3 km | ₹12,500 /mo · 6 listings | |
| Rent per sq ft, 3 km | ₹30.8 /mo, as listed · 45 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 52 (28 with an approximate location) | |
|---|---|---|
| Flats in them | 25,629 | |
| Booked | 15,852 of 25,629 (62%) | |
| Unsold | 9,777 | |
| Booked a month, pooled | 307 flats | |
| Months to sell, pooled | 32 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (Gram Panchayat) | |
| Nearest city water main | 1.1 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 1.4 km to the south-east, Dakshina Pinakini, primary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 3.4 km, Whitefield | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 30.9 | 31 | 20.3 |
| MG Road (CBD) | 23.1 | 24 | 18.4 |
| Manyata Tech Park | 22.6 | 26 | 15.7 |
| ITPL, Whitefield | 7.0 | 9 | 5.3 |
| Ecospace, Bellandur ORR | 17.6 | 22 | 14.3 |
| Electronic City Ph 1 | 31.4 | 37 | 22.7 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 1.7 km to the north-west | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 380 m to the west |