| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Aarna RajpathLapsed · completion date passed | AARNA PROJECTS | Mixed development | – | Apr 2025 |
| Adithi EmeraldCompleted · OC 09-12-2021 | M/s ADITHI PROJECTS | Apartment | – | Completed |
| Adithya LujosoCompleted · OC 18-05-2021 | Adithya Constructions | Apartment | 825 sqft carpet (as filed) | Completed |
| Bhuvana Boulevard Phase 1Active · 12% built | VSPR DEVELOPERS | Rowhouse | 2,056 sqft carpet (as filed) | Dec 2030 |
| Bhuvana Boulevard Phase 2Active · 10% built | VSPR DEVELOPERS | Rowhouse | 2,056 sqft carpet (as filed) | Dec 2030 |
| Bm PristineLapsed · completion date passed | B M DEVELOPERS | Apartment | – | Jul 2016 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 20 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Candeur LandmarkCompleted · OC 15-12-2020 |
| M/s. Candeur Constructions |
| Apartment |
| – |
| Completed |
| Candeur Novo GardeniaActive · 80% built | NOVOLIFE INNOVATIVE STRUCTURES LLP | Apartment | 798–981 sqft carpet (as filed) | Dec 2027 |
8 of 48 other projects in Varthur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Aikya Orchid in the interactive atlas
Transfer of the land
Sale deed
Survey 77/2B
K-RERA filing, land schedule
Approval or registration
Land use converted
Deputy Commissioner, Bangalore District Bangalore · Survey 77/2B
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 77/2B
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Ad.Com./MDP/0637/2021-22
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/110722/005061
K-RERA registration ·
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 77/2B | |
|---|---|---|
| Land extent, Sy 77/2B | 26 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 2,630 sq m | |
| Khata | A Khatha · BBMP · 14 Sep 2021 | |
| Sale deed | Dated 13 Jul 1981 | |
| Building plan (BBMP) | Sanctioned 23 Feb 2022 · No. BBMP/Ad.Com./MDP/0637/2021-22 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Airport height NOC | Not verified yet | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 22 Feb 2025 |
| Land conversion | Converted 22 Mar 2017 · Deputy Commissioner, Bangalore District Bangalore | |
|---|---|---|
| Survey numbers | 77/2B |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
2BHK · avg 78 m² 61.5%3BHK · avg 98 m² 38.5%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 32 | 840 |
| 3BHK | 20 | 1,050 |
| Inspira Infinity | about 1 km | Locked | |
|---|---|---|---|
| Poetry Of Earth | about 1.5 km | Locked | |
| Jeevan's Allure | about 1.5 km | Locked | |
| Adarsh Park Heights Phase-2 | about 2.5 km | Locked | |
| Reflections 66 | about 3 km |
| Aikya Orchid This project | This project is the point the others are measured from | 22 Feb 2025 | Not filed | Not verified yet |
|---|---|---|---|---|
| Inspira Infinity | about 1 km | 31 Jan 2029 | 95% (100 of 105) | Locked |
| Poetry Of Earth | about 1.5 km | 31 Dec 2028 | 23% (65 of 282) | Locked |
| Jeevan's Allure |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 1 km, Varthur police station | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.10 (57 covered spaces for 52 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | Not verified yet | |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | Completed, occupancy certificate 6 May 2024 | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 10 Feb 2025 | |
| RERA completion date | 22 Feb 2025 | |
| Work began, as filed | 23 Feb 2022 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 15 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 5 sq m | |
| Sewage plant | Not verified yet | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹1.50 Cr 10%Development · ₹13.50 Cr 90%
| Estimated cost | ₹15.00 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (30) 96.8%Unsold (1) 3.2%
| Flats sold, at completion | 30 | |
|---|---|---|
| Flats unsold, at completion | 1 | |
| Flats in the phase | 31 |
| Escrow bank | Axis Bank · TC Palya Branch | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 23 Feb 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Axis Bank · TC Palya Branch | |
| Sobha Sentosa Phase 1 Wing 7 | about 3 km | Locked |
|---|
| Sobha Sentosa Phase 2 Wing 5 And 6 | about 3 km | Locked |
|---|
| Sobha Sentosa Phase 3 Wing 3 And 4 | about 3 km | Locked |
|---|
| Sobha Sentosa Phase 4 Wing 1 And 2 | about 3 km | Locked |
|---|
| Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24 | about 3 km | Locked |
|---|
| SOBHA Ayana | about 3.5 km | Locked |
|---|
| Sobha Dream Acres - Tropical Greens Phase 21 Wing 21 And 22 | about 3.5 km | Locked |
|---|
| about 1.5 km |
| 31 Jul 2027 |
| 32% (49 of 152) |
| Locked |
| Adarsh Park Heights Phase-2 | about 2.5 km | 31 May 2027 | 95% (471 of 494) | Locked |
|---|
| Reflections 66 | about 3 km | 31 Dec 2030 | 15% (10 of 66) | Locked |
|---|
| Sobha Sentosa Phase 1 Wing 7 | about 3 km | 30 Jun 2026 | 100% (71 of 71) | Locked |
|---|
| Projects within 4 km, counted | 84 (84 with an approximate location) | |
|---|---|---|
| Flats in them | 26,466 | |
| Booked | 16,175 of 26,466 (61%) | |
| Unsold | 10,291 | |
| Booked a month, pooled | 413 flats | |
| Months to sell, pooled | 25 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 5 km, Kadugodi | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 29 |
| MG Road (CBD) | 17 |
| Manyata Tech Park | 18.5 |
| ITPL, Whitefield | 5 |
| Ecospace, Bellandur ORR | 8 |
| Electronic City Ph 1 | 14 |
| Sewage treatment plant |
|---|
| None within 3 km |
| Quarry | None within 3 km |
|---|
| Crematorium | None within 3 km |
|---|
| Prison | None within 3 km |
|---|
| Electrical substation | about 1 km |
|---|