Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | 1 | 3 | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | ||
| 10xLapsed · completion date passed | M/S. MAZ-RD BUILDERS AND DEVELOPERS PRIVATE LIMITED | Apartment | – | Sep 2024 |
| A.S.R.S ParadiseLapsed · completion date passed | A.S. Builders | Apartment | – | Jan 2021 |
| Aadya HeightsLapsed · completion date passed | WHITEWINDS CONSTRUCTIONS PRIVATE LIMITED | Apartment | 917–1,080 sqft carpet (as filed) | Dec 2025 |
| Aakriti EmeraldActive · 51% built | AAKRITI PROJECTS | Apartment | 694–1,137 sqft carpet (as filed) | Aug 2028 |
| Aakruthi NestActive · 35% built | KRITI BUILDERS AND DEVELOPERS | Apartment | 608–837 sqft carpet (as filed) | Dec 2028 |
| Aban DesireRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Apartment | 801–1,054 sqft carpet (as filed) | Dec 2028 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 53 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| – |
| Not verified |
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | – | Review |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Adarsh ParadiseActive · 87% built | A1 BUILDERS | Apartment | 668–924 sqft carpet (as filed) | Dec 2026 |
| Adithya RicaCompleted (regulator flag) | ADITHYA CONSTRUCTIONS | Apartment | 769 sqft carpet (as filed) | Completed |
8 of 264 other projects in Old Madras Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Aiikya Village Sarjapur in the interactive atlas
Transfer of the land
Sale deed
Survey 397/2
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Revenue Department · Survey 397/2
K-RERA filing, land schedule
Approval or registration
Land use converted
District Magistrate · Survey 397/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BMRDA · plan STRRPA/TP/CC/169/2023-24
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/221123/006419
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 13 Oct 2023 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: Latest Encumbrance Certificate.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 397/2 | |
|---|---|---|
| Land extent, Sy 397/2 | 1 Acre, 28 Gunta | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 6,879 sq m | |
| Khata | E Khatha · Revenue Department · 19 Jan 2005 | |
| Sale deed | Dated 20 Aug 2003 | |
| Building plan (BMRDA) | Sanctioned 10 Nov 2023 · No. STRRPA/TP/CC/169/2023-24 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/260/2022 · issued 4 Oct 2023 · building height 39.98 m | Clear |
| Environmental clearance | EC identification no. EC21B038KA110456 · issued 27 Dec 2021 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | Applied for · Applied 22 Sep 2026 | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 26 Nov 2026 |
| Land conversion | Converted 6 Aug 2015 · District Magistrate | |
|---|---|---|
| Survey numbers | 397/2 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
3.5BHK · avg 110 m² 55.6%2.5BHK · avg 93 m² 25.4%4.5BHK · avg 156 m² 10.7%5.5BHK · avg 173 m² 7.7%1BHK · 51 m² 0.6%
| 1BHK | 1 | 549 |
| 2.5BHK | 43 | 1,004 |
| 3.5BHK | 94 | 1,181 |
| 4.5BHK | 18 | 1,676 |
| 5.5BHK | 13 | 1,862 |
| Sold, Q1 2026-27 | 123 / 169 | |
|---|---|---|
| Unsold, Q1 2026-27 | 46 | |
| Months to sell, derived from filed bookings | 10 months |
| Suyug's Saffron | about 2 km | Locked | |
|---|---|---|---|
| Sowparnika Olivia Nest | about 2.5 km | Locked | |
| Engrace Vista | about 3 km | Locked | |
| Engrace 4 | about 3.5 km | Locked | |
| Bilva Phase-II By Bhavisha Homes | about 3.5 km | Locked |
| Aiikya Village Sarjapur This project | This project is the point the others are measured from | 26 Nov 2026 | 73% (123 of 169) | Not verified yet |
|---|---|---|---|---|
| Suyug's Saffron | about 2 km | 31 Dec 2028 | 8% (9 of 110) | Locked |
| Sowparnika Olivia Nest | about 2.5 km | 30 Sep 2027 | 100% (211 of 211) | Locked |
| Engrace Vista |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 10 km, Gunjur | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 60% | |
| Electricity, built | 0% | |
| Gym, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.96 (162 covered spaces for 169 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 28.7 m
Across Anekal, the water table sat 21.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 28.7 m, and it recovered 3.3 m over the year.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 21.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | Not verified yet | |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
As the promoter reported it

| Main structure | 71% · planned by 15 May 2026 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 15 Jan 2026 | |
| Internal roads | Not verified yet | |
| Club house | 60% | |
| Completion | 58% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 15 Oct 2026 | |
| RERA completion date | 26 Nov 2026 | |
| Work began, as filed | 27 Nov 2023 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 39.98 m on the fire NOC · 40 m filed, 3 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 51.42 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Feb 2026, Aug 2026, Aug 2026 (3 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/260/2022 · issued 4 Oct 2023 · building height 39.98 m | |
| Environmental clearance | EC identification no. EC21B038KA110456 · issued 27 Dec 2021 | |
| Architect, quarterly | Form 5 · Feb 2026, Aug 2026, Aug 2026 (3 filed) | |
| Architect's certificate, registration | Dated 29 Aug 2023 | |
| Chartered accountant's certificate, registration | Dated 14 Nov 2023 | |
Land · ₹13.32 Cr 17.3%Development · ₹63.87 Cr 82.7%
| Estimated cost | ₹77.19 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹63.87 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹18.33 Cr | |
| Land cost revision | Not verified yet | |
Sold (123) 72.8%Unsold (46) 27.2%
| Sold, Q3 2025-26 | 96 / 159 · 63 available | |
|---|---|---|
| Sold, Q4 2025-26 | 118 / 169 · 51 available | |
| Sold, Q1 2026-27 | 123 / 169 · 46 available | |
| Unsold, Q1 2026-27 | 46 | |
| Sold in Q4 2025-26 | 22 | |
| Sold in Q1 2026-27 | 5 |
| Escrow bank | RATNAKAR BANK · Bommasandra | |
|---|---|---|
| Designated account, collected | ₹8.14 Cr in Q1 2026-27 | |
| Designated account, withdrawn | ₹8.08 Cr in Q1 2026-27 (99% of that quarter's deposits) | |
| Net amount withdrawable, Form 4 | ₹14,07,00,000 | |
| Withdrawn from the escrow account to date | ₹59,51,00,000 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 13 Oct 2023 | Review |
| Building plan (BMRDA) | Sanctioned 10 Nov 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | RATNAKAR BANK · Bommasandra | |

| Engrace 3 | about 3.5 km | Locked |
|---|
| Royal Nest | about 4.5 km | Locked |
|---|
| Nambiar District 25 Phase 2 | about 4.5 km | Locked |
|---|
| Mitta Orrin | about 5 km | Locked |
|---|
| Vasudharini Nest | about 5.5 km | Locked |
|---|
| Acorn Hive | about 5.5 km | Locked |
|---|
| Mahidhara Harmony | about 5.5 km | Locked |
|---|
| about 3 km |
| 30 Dec 2028 |
| 46% (181 of 392) |
| Locked |
| Engrace 4 | about 3.5 km | 31 Dec 2026 | 100% (145 of 145) | Locked |
|---|
| Bilva Phase-II By Bhavisha Homes | about 3.5 km | 30 Apr 2027 | 39% (89 of 226) | Locked |
|---|
| Engrace 3 | about 3.5 km | 1 Jun 2026 | 100% (76 of 76) | Locked |
|---|
| Projects within 4 km, counted | 50 (50 with an approximate location) | |
|---|---|---|
| Flats in them | 12,149 | |
| Booked | 7,140 of 12,149 (59%) | |
| Unsold | 5,009 | |
| Booked a month, pooled | 177 flats | |
| Months to sell, pooled | 28 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | about 10.5 km, Bommasandra | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 40 |
| MG Road (CBD) | 24.5 |
| Manyata Tech Park | 28.5 |
| ITPL, Whitefield | 16.5 |
| Ecospace, Bellandur ORR | 14 |
| Electronic City Ph 1 | 11.5 |
| Sewage treatment plant |
|---|
| None within 3 km |
| Quarry | None within 3 km |
|---|
| Crematorium | None within 3 km |
|---|
| Prison | None within 3 km |
|---|
| Electrical substation | about 2 km, named Sarjapur Substation on OpenStreetMap |
|---|