Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | ||||
| AlcazarRegistered · no quarterly update yet | PANTHEON ONE | Apartment | 1,751–2,380 sqft carpet (as filed) | Mar 2024 |
| Brigade Legacy | Brigade Group | Apartment | 2,156–3,000 sqft | – |
| CharisCompleted (regulator flag) | Lewis Infrastructure and Projects | Apartment | – | Completed |
| Chartered Karthika | Chartered Housing | Apartment | 2,361 sqft | – |
| Donata VistaCompleted · OC 22-03-2024 | Sanjeev Wahi | Apartment | 1,310 sqft carpet (as filed) | Completed |
| El RoiActive · 82% built | LEWIS INFRASTRUCTURE AND PROJECTS | Apartment | 1,382 sqft carpet (as filed) | Mar 2028 |
| Koncept Ambience DowntownExtended to 31-12-2026 | Koncept Ambience | Apartment |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Builder: HPR Constructions
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| None found. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| None found. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 7 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| – |
| – |
| – |
| – |
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 2,477–3,131 sqft |
| Dec 2026 |
| LapazExtended to 20-03-2027 | SANTOSH GLEN LEWIS | Apartment | 527–947 sqft carpet (as filed) | Mar 2027 |
8 of 21 other projects in Frazer Town, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Spencer Oaks in the interactive atlas
Approval or registration
Khata issued
A Khatha · BBMP · Survey 91-76-3/2
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 91-76-3/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan PRJ/0195/22-23IN
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/191022/005343
K-RERA registration ·
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 25 Jun 2021 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 91-76-3/2 | |
|---|---|---|
| Land extent, Sy 91-76-3/2 | 13,500 sq m | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 1,292 sq m | |
| Khata | A Khatha · BBMP · 19 Oct 2019 | |
| Sale deed | Dated 7 Nov 2020 | |
| Building plan (BBMP) | Sanctioned 2 Jul 2022 · No. PRJ/0195/22-23IN | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| KSPCB | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Aug 2028 |
| Land conversion | Declared not converted | |
|---|---|---|
| Survey numbers | 91-76-3/2 |
3BHK 38.9%3BHK 38.9%3BHK 22.2%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 3BHK | 7 | 1,507 |
| 3BHK | 7 | 1,550 |
| 3BHK | 4 | 1,765 |
| Magnolia Delight | about 3 km | Locked | |
|---|---|---|---|
| Ranka Iris | about 4.5 km | Locked | |
| Vista Svara | about 5 km | Locked | |
| Renaissance Srichakra | about 5 km | Locked | |
| Vista Padmalaya | about 5.5 km | Locked |
| Spencer Oaks This project | This project is the point the others are measured from | 31 Aug 2028 | Not filed | Not verified yet |
|---|---|---|---|---|
| Magnolia Delight | about 3 km | 31 Mar 2028 | 21% (10 of 48) | Locked |
| Ranka Iris | about 4.5 km | 30 Apr 2026 | 62% (8 of 13) | Locked |
| Vista Svara | about 5 km |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 0.5 km, Pulakeshinagara | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.00 (18 covered spaces for 18 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 26.8 m
Across Bengaluru North, the water table sat 22.7 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 26.8 m, and it fell 4.9 m over the year.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 22.7 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 1 Aug 2028 | |
| RERA completion date | 31 Aug 2028 | |
| Work began, as filed | 31 Aug 2022 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Chartered accountant's certificate, registration | Dated 26 Jul 2022 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹35.00 Cr 70.1%Development · ₹14.95 Cr 29.9%
| Estimated cost | ₹49.95 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹14.95 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | Union Bank of India · Union Bank Jayanagar Branch | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 25 Jun 2021 | Review |
| Building plan (BBMP) | Sanctioned 2 Jul 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Union Bank of India · Union Bank Jayanagar Branch | |
| Century Regalia (Project 2) | about 6 km | Locked |
|---|
| Lodha Mirabelle | about 6 km | Locked |
|---|
| Mirabelle Phase 2 | about 6 km | Locked |
|---|
| Legacy Saviero | about 6.5 km | Locked |
|---|
| Vkk Grand | about 7 km | Locked |
|---|
| Brr North Excellency Phase I | about 7.5 km | Locked |
|---|
| Sumadhura Solea | about 7.5 km | Locked |
|---|
| 30 Oct 2026 |
| 50% (16 of 32) |
| Locked |
| Renaissance Srichakra | about 5 km | 11 Aug 2027 | 63% (5 of 8) | Locked |
|---|
| Vista Padmalaya | about 5.5 km | 30 Apr 2027 | 40% (4 of 10) | Locked |
|---|
| Century Regalia (Project 2) | about 6 km | 28 Feb 2030 | 63% (80 of 128) | Locked |
|---|
| Projects within 4 km, counted | 20 (20 with an approximate location) | |
|---|---|---|
| Flats in them | 681 | |
| Booked | 312 of 681 (46%) | |
| Unsold | 369 | |
| Booked a month, pooled | 5 flats | |
| Months to sell, pooled | 71 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, secondary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 0.5 km, Pottery Town | |
| Kempegowda Airport | 25 |
| MG Road (CBD) | 2.5 |
| Manyata Tech Park | 5.5 |
| ITPL, Whitefield | 14 |
| Ecospace, Bellandur ORR | 11 |
| Electronic City Ph 1 | 19 |
| Landfill or waste transfer station | about 2.5 km to the south-west | |
|---|---|---|
| Sewage treatment plant | about 1.5 km, named ETP on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | about 2.5 km to the east, named Kalpalli Cemetery Crematorium on OpenStreetMap | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km, named Pottery Road on OpenStreetMap |