Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 63 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 446 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sapthagiri Sampada B Block in the interactive atlas
Transfer of the land
Sale deed
Survey 3/7
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 3/2, 3/6
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 3/2, 3/6
K-RERA filing, land schedule
Approval or registration
Land use converted
Deputy Commissioner · Survey 3/2, 3/6
K-RERA filing, land schedule
Approval or registration
Land use converted
Deputy Commissioner · Survey 3/2, 3/6
K-RERA filing, land schedule
Approval or registration
Land use converted
Deputy Commissioner, Bengaluru Rural District · Survey 3/7
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Gram Panchayat, Hosakote · Survey 3/2, 3/6
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Gram Panchayat, Hosakote · Survey 3/2, 3/6
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Grama Panchayat, Hosakote · Survey 3/7
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Hoskote Planning Authority · plan HYP/CC/13/2024-25
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1250/304/PR/120626/008720
K-RERA registration
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 25 May 2026 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Page 1
Page 1 of 7 of the survey sketch. Filed with K-RERA: ADLR Survey sketch, 7 pages.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 3/2, 3/6, 3/7 | |
|---|---|---|
| Land extent, Sy 3/2 | 13 Guntas | |
| Land extent, Sy 3/6 | 12.5 Guntas | |
| Land extent, Sy 3/7 | 12.5 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 3,845 sq m | |
| Khata | E Khatha · Gram Panchayat, Hosakote · 23 Sep 2024; E Khatha · Grama Panchayat, Hosakote · 23 Sep 2024 | |
| Sale deed | Dated 11 Jan 2020, 11 Feb 2020 | |
Valid as of this reportValidity ended
| Building plan (Hoskote Planning Authority) | Sanctioned 30 Nov 2024 · No. HYP/CC/13/2024-25 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Filed with the registration | |
| SEIAA | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-346101 · issued 21 Nov 2024 · valid until 31 Dec 2029 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2031 |
| Land conversion | 3 of 3 parcels converted | |
|---|---|---|
| Sy 3/2, 3/6 | Converted 9 Mar 2021 · Deputy Commissioner | |
| Sy 3/7 | Converted 9 Mar 2021 · Deputy Commissioner, Bengaluru Rural District | |
| Survey numbers | 3/2 · 3/6 · 3/7 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
2BHK · avg 65 m² 68.5%3BHK · avg 84 m² 26.9%1BHK 4.6%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 1BHK | 5 | 1,894 |
| 2BHK | 74 | 52,108 |
| 3BHK | 29 | 26,081 |
| Sold, Q2 2026-27 | 2 / 108 | |
|---|---|---|
| Unsold, Q2 2026-27 | 106 | |
| Months to sell, derived from filed bookings | Too few bookings to project (2 flats booked in 3 months) |
| Engrace 3 | about 0.5 km | Locked | |
|---|---|---|---|
| Engrace 4 | about 0.5 km | Locked | |
| Engrace Vista | about 1 km | Locked | |
| Nambiar District 25 Phase 2 | about 1.5 km | Locked | |
| Bilva Phase-II By Bhavisha Homes | about 2 km | Locked |
| Sapthagiri Sampada B Block This project | This project is the point the others are measured from | 31 Dec 2031 | 2% (2 of 108) | Not verified yet |
|---|---|---|---|---|
| Engrace 3 | about 0.5 km | 1 Jun 2026 | 100% (76 of 76) | Locked |
| Engrace 4 | about 0.5 km | 31 Dec 2026 | 100% (145 of 145) | Locked |
| Engrace Vista | about 1 km | 30 Dec 2028 |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 6.5 km, Gunjur | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| Community Hall, built | 0% | |
| Indoor Sports facility, built | 0% | |
| Gym, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.07 (116 covered spaces for 108 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 28.7 m
Across Anekal, the water table sat 21.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 28.7 m, and it recovered 3.3 m over the year.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 21.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | Not verified yet | |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
As the promoter reported it
| Main structure | Not started · planned by 30 Nov 2027 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 31 May 2031 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 41% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Dec 2031 | |
| RERA completion date | 31 Dec 2031 | |
| Work began, as filed | 30 Nov 2024 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14.9 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 9.29 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Oct 2026, Oct 2026 (2 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Filed with the registration | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Oct 2026, Oct 2026 (2 filed) | |
| Architect's certificate, registration | Dated 6 May 2026 · site inspected 5 May 2026 | |
| Chartered accountant's certificate, registration | Dated 6 May 2026 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹1.41 Cr 6%Development · ₹22.03 Cr 94%
| Estimated cost | ₹23.44 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (2) 1.9%Unsold (106) 98.1%
| Sold, Q1 2026-27 | 0 / 108 · 108 available | |
|---|---|---|
| Sold, Q2 2026-27 | 2 / 108 · 106 available | |
| Unsold, Q2 2026-27 | 106 | |
| Sold in Q2 2026-27 | 2 |
| Escrow bank | ICICI Bank · Battarahalli | |
|---|---|---|
| Designated account, collected | ₹16.0 L in Q2 2026-27 | |
| Designated account, withdrawn | ₹16.0 L in Q2 2026-27 (100% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 25 May 2026 | |
| Building plan | Sanctioned 30 Nov 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | ICICI Bank · Battarahalli | |
| Suyug's Saffron | about 2.5 km | Locked |
|---|
| Acorn Hive | about 2.5 km | Locked |
|---|
| Vistar White Pearl | about 3 km | Locked |
|---|
| Mahidhara Harmony | about 4 km | Locked |
|---|
| Orion Heights | about 5 km | Locked |
|---|
| Sowparnika Olivia Nest | about 5.5 km | Locked |
|---|
| Coevolve Florenza | about 5.5 km | Locked |
|---|
| 46% (181 of 392) |
| Locked |
| Nambiar District 25 Phase 2 | about 1.5 km | 31 Aug 2030 | 86% (705 of 816) | Locked |
|---|
| Bilva Phase-II By Bhavisha Homes | about 2 km | 30 Apr 2027 | 39% (89 of 226) | Locked |
|---|
| Suyug's Saffron | about 2.5 km | 31 Dec 2028 | 8% (9 of 110) | Locked |
|---|
| Projects within 4 km, counted | 52 (52 with an approximate location) | |
|---|---|---|
| Flats in them | 19,491 | |
| Booked | 10,760 of 19,491 (55%) | |
| Unsold | 8,731 | |
| Booked a month, pooled | 319 flats | |
| Months to sell, pooled | 27 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | about 8.5 km, Bommasandra | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 37.5 |
| MG Road (CBD) | 20.5 |
| Manyata Tech Park | 24.5 |
| ITPL, Whitefield | 13.5 |
| Ecospace, Bellandur ORR | 10.5 |
| Electronic City Ph 1 | 8.5 |
| Sewage treatment plant |
|---|
| None within 3 km |
| Quarry | None within 3 km |
|---|
| Crematorium | None within 3 km |
|---|
| Prison | None within 3 km |
|---|
| Electrical substation | about 2.5 km to the north-west, named Chokkasandra on OpenStreetMap |
|---|