Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 4square Park SierraActive · 29% built | 4SQUARE ESTATES | Apartment | 1,083 sqft carpet (as filed) | Dec 2029 |
| Adithya TranquilLapsed · completion date passed | ADITHYA DEVELOPERS | Apartment | – | Jan 2023 |
| Affinity GardeniaActive · 95% built | AFFINITY PROPERTIES LLP | Apartment | 682–853 sqft carpet (as filed) | Dec 2026 |
| After the RainCompleted · OC 30-04-2022 | Total Environment | Villa | 3,184–5,182 sqft | Completed |
| After the Rain - Phase II ACompleted · OC 10-01-2024 | Total Environment Building Systems Private Limited | Mixed development | 290–2,669 sqft carpet (as filed) | Completed |
| After the Rain Phase IIIActive · 3% built | TOTAL ENVIRONMENT BUILDING SYSTEMS PVT LTD | Apartment |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 42 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 2 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 2,643–6,964 sqft carpet (as filed) |
| Apr 2032 |
| After The Rain-Phase IibLapsed · completion date passed | Total Environment Building Systems Private Limited | Apartment | – | Aug 2026 |
| After the Rain-Phase IicActive · 48% built | Total Environment Building Systems Private limited | Villa | 3,535 sqft carpet (as filed) | Apr 2028 |
8 of 120 other projects in Yelahanka, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sambhav Rise Of Aura in the interactive atlas
Transfer of the land
Sale deed
in favour of Sambhav Buloke Realty LLP · Survey 349/8
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Office, Bengaluru · Survey 349/3
K-RERA filing, land schedule
Transfer of the land
Title deed executed
No. GNR-1-00057-2026-27 · Book 1 · Sy 349/3; 349/8, Bettahalasuru village, Jala hobli, Yelahanka taluk
Title deed filed with K-RERA, pp. 3, 10, 11 · See it in Documents
Approval or registration
Land use converted
DC Office Bengaluru · Survey 349/8
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of Sambhav Buloke Realty LLP · Survey 349/3
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Rural development and Panchayat Raj Dept · Survey 349/3, 349/8
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Rural development and Panchayat Raj Dept · Survey 349/3, 349/8
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan BDA/NM/AS/AA-2/TS-3/U/04/2026-27
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/472/PR/200626/008731
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 2 Feb 2026 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 349/3, 349/8 | |
|---|---|---|
| Land extent, Sy 349/3 | 1 Acre 26 Guntas | |
| Land extent, Sy 349/8 | 12 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 8,548 sq m | |
| Khata | E Khatha · Rural development and Panchayat Raj Dept · 13 Apr 2026 | |
| Sale deed | Dated 6 Nov 2020, 6 Apr 2026 | |
| Sale deed in favour of | Sambhav Buloke Realty LLP | |
| Building plan (BDA) | Sanctioned 8 May 2026 · No. BDA/NM/AS/AA-2/TS-3/U/04/2026-27 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/468/2025 · issued 23 Dec 2025 · building height 36.1 m (Tower 1) | Clear |
| Environmental clearance | SEIAA 206 CON 2025 · EC identification no. EC25C3801KA5931530N · issued 29 Sep 2025 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 1 Mar 2031 |
| Land conversion | 2 of 2 parcels converted | |
|---|---|---|
| Sy 349/3 | Converted 6 Sep 2025 · DC Office, Bengaluru | |
| Sy 349/8 | Converted 6 Apr 2026 · DC Office Bengaluru | |
| Survey numbers | 349/3 · 349/8 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
3BHK · avg 109 m² 49.1%2.5BHK · avg 86 m² 17.5%3.5BHK · avg 124 m² 17.5%2BHK · avg 80 m² 15.8%
| 2BHK | 18 | 856 |
| 2.5BHK | 20 | 922 |
| 3BHK | 56 | 1,172 |
| 3.5BHK | 20 | 1,334 |
| Sold, Q2 2026-27 | 99 / 114 | |
|---|---|---|
| Unsold, Q2 2026-27 | 15 | |
| Months to sell, derived from filed bookings | 1 months |
| Riviera Glade | about 1 km | Locked | |
|---|---|---|---|
| Assetz Miru & Miyo | about 4.5 km | Locked | |
| Tnm Lakeview | about 5 km | Locked | |
| Godrej Aveline | about 5.5 km | Locked | |
| Sattva City | about 5.5 km | Locked |
| Sambhav Rise Of Aura This project | This project is the point the others are measured from | 1 Mar 2031 | 87% (99 of 114) | Not verified yet |
|---|---|---|---|---|
| Riviera Glade | about 1 km | 31 Dec 2030 | 28% (31 of 112) | Locked |
| Assetz Miru & Miyo | about 4.5 km | 31 Mar 2031 | 6% (20 of 350) | Locked |
| Tnm Lakeview |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 6 km, Kondappa layout | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 1.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| Community Hall, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.75 (199 covered spaces for 114 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 32.6 m
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 11.4 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (Bettahalsuru Grama Panchayat) | |
| Nearest city water main | Not verified yet | |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |
As the promoter reported it
| Main structure | Not started · planned by 26 Jun 2028 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 17 Apr 2029 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 5% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 1 Mar 2031 | |
| RERA completion date | 1 Mar 2031 | |
| Completion date, agreement | 1 Mar 2031 | |
| Work began, as filed | 1 Jul 2026 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 36.1 m (Tower 1) on the fire NOC · 36.1 m filed, 2 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 83.65 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jul 2026, Oct 2026 (2 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/468/2025 · issued 23 Dec 2025 · building height 36.1 m (Tower 1) | |
| Environmental clearance | SEIAA 206 CON 2025 · EC identification no. EC25C3801KA5931530N · issued 29 Sep 2025 | |
| Architect, quarterly | Form 5 · Jul 2026, Oct 2026 (2 filed) | |
| Architect's certificate, registration | Site inspected 14 May 2026 | |
| Engineer's certificate, registration | Dated 20 May 2026 | |
| Chartered accountant's certificate, registration | Dated 19 Jun 2026 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹16.43 Cr 17.4%Development · ₹77.89 Cr 82.6%
| Estimated cost | ₹94.32 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹55.71 Cr | |
| Estimated cost, chartered accountant's certificate | ₹94.32 Cr, same as the filing | |
| Cost incurred | ₹19.32 Cr | |
| Cost left | ₹75.00 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (99) 86.8%Unsold (15) 13.2%
| Sold, Q1 2026-27 | 28 / 114 · 86 available | |
|---|---|---|
| Sold, Q2 2026-27 | 99 / 114 · 15 available | |
| Unsold, Q2 2026-27 | 15 | |
| Sold in Q2 2026-27 | 71 | |
| Flats booked, Form 4 Q1 2026-27 | 28 |
| Escrow bank | ICICI Bank · Jayanagar 3rd Block | |
|---|---|---|
| Designated account, collected | ₹11.66 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 (0% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 2 Feb 2026 | |
| Building plan (BDA) | Sanctioned 8 May 2026 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | ICICI Bank · Jayanagar 3rd Block | |
| Assetz Zen & Sato | about 6 km | Locked |
|---|
| Century Kindle Phase 1 | about 6.5 km | Locked |
|---|
| Legacy Salvador | about 7 km | Locked |
|---|
| Godrej MSR City | about 7.5 km | Locked |
|---|
| Barca II At Godrej Msr City | about 7.5 km | Locked |
|---|
| Kumar Plumeria | about 7.5 km | Locked |
|---|
| 4square Park Sierra | about 7.5 km | Locked |
|---|
| about 5 km |
| 31 Oct 2026 |
| 100% (36 of 36) |
| Locked |
| Godrej Aveline | about 5.5 km | 31 Mar 2031 | 91% (769 of 849) | Locked |
|---|
| Sattva City | about 5.5 km | 28 Feb 2032 | 17% (425 of 2,491) | Locked |
|---|
| Assetz Zen & Sato | about 6 km | 31 May 2030 | 44% (202 of 456) | Locked |
|---|
| Projects within 4 km, counted | 10 (10 with an approximate location) | |
|---|---|---|
| Flats in them | 2,566 | |
| Booked | 1,363 of 2,566 (53%) | |
| Unsold | 1,203 | |
| Booked a month, pooled | 42 flats | |
| Months to sell, pooled | 29 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 1.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 3 km, Bettahalasuru | |
| Kempegowda Airport | 12.5 |
| MG Road (CBD) | 21 |
| Manyata Tech Park | 13.5 |
| ITPL, Whitefield | 25 |
| Ecospace, Bellandur ORR | 28 |
| Electronic City Ph 1 | 37 |