Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 14 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 379 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sai Paadam in the interactive atlas
Approval or registration
Land use converted
DEPUTY COMMISSIONER · Survey 340
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 340
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · Bruhat Bangaluru Mahanagara Palike · Survey 340
K-RERA filing, land schedule
Transfer of the land
Title deed executed
Sy 47; 288/1, K.R.Puram hobli
Title deed filed with K-RERA, pp. 1, 21 · See it in Documents
Approval or registration
Building plan sanctioned
BDA · plan BBMP/ADCOM/MDP/0534/22-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/300323/005833
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 340 | |
|---|---|---|
| Land extent, Sy 340 | 1,858 sq m | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 1,858 sq m | |
| Khata | A Khatha · Bruhat Bangaluru Mahanagara Palike · 8 Apr 2022 | |
| Sale deed | Dated 23 Feb 2005 | |
| Building plan (BDA) | Sanctioned 29 Oct 2022 · No. BBMP/ADCOM/MDP/0534/22-23 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Mar 2027 |
| Land conversion | Converted 4 Jun 2004 · DEPUTY COMMISSIONER | |
|---|---|---|
| Survey numbers | 340 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
2BHK · avg 74 m² 80%3BHK 20%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 2BHK | 32 | 25,500 |
| 3BHK | 8 | 7,610 |
| Garuda Grand | about 1 km | Locked | |
|---|---|---|---|
| Godrej Splendour | about 1.5 km | Locked | |
| 2g Tula | about 2 km | Locked | |
| Godrej Splendour Phase II | about 2 km | Locked | |
| Vaswani Starlight | about 2 km | Locked |
| Sai Paadam This project | This project is the point the others are measured from | 31 Mar 2027 | Not filed | Not verified yet |
|---|---|---|---|---|
| Garuda Grand | about 1 km | 31 Mar 2028 | 41% (56 of 136) | Locked |
| Godrej Splendour | about 1.5 km | 20 Mar 2027 | 98% (1,135 of 1,161) | Locked |
| 2g Tula | about 2 km |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 2 km, Hoodi | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · Community Hall · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.91 (40 covered spaces for 44 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | Not verified yet | |
| Possession, agreement | 31 Mar 2027 | |
|---|---|---|
| Schedule end | 31 Mar 2027 | |
| RERA completion date | 31 Mar 2027 | |
| Work began, as filed | 26 Feb 2023 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 15 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 5 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect's certificate, registration | Dated 12 Feb 2023 · site inspected 12 Feb 2023 | |
| Engineer's certificate, registration | Dated 12 Feb 2023 | |
| Chartered accountant's certificate, registration | Dated 1 Mar 2023 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹35.0 L 3.2%Development · ₹10.52 Cr 96.8%
| Estimated cost | ₹10.87 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹8.05 Cr | |
| Estimated cost, chartered accountant's certificate | ₹10.87 Cr, same as the filing | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | Industrial Development Bank of India · whitefield pattanadu agrahara | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BDA) | Sanctioned 29 Oct 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Industrial Development Bank of India · whitefield pattanadu agrahara | |
| Axis Ekatva | about 2.5 km | Locked |
|---|
| Coevolve Misty Shores | about 2.5 km | Locked |
|---|
| Nirmaanika Aria | about 3 km | Locked |
|---|
| Assetz Bloom & Dell - Phase 2 | about 3 km | Locked |
|---|
| Assetz 66 & Shibui | about 3.5 km | Locked |
|---|
| Reflections 66 | about 3.5 km | Locked |
|---|
| Assetz Sun & Sanctum - Phase 2 | about 4 km | Locked |
|---|
| 27 Dec 2027 |
| 68% (173 of 256) |
| Locked |
| Godrej Splendour Phase II | about 2 km | 14 Jan 2028 | 88% (782 of 891) | Locked |
|---|
| Vaswani Starlight | about 2 km | 31 Dec 2029 | 43% (115 of 269) | Locked |
|---|
| Axis Ekatva | about 2.5 km | 30 Jun 2029 | 8% (23 of 287) | Locked |
|---|
| Projects within 4 km, counted | 71 (71 with an approximate location) | |
|---|---|---|
| Flats in them | 22,954 | |
| Booked | 14,476 of 22,954 (63%) | |
| Unsold | 8,478 | |
| Booked a month, pooled | 155 flats | |
| Months to sell, pooled | 52 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 1 km, Pattandur Agrahara | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 22.5 |
| MG Road (CBD) | 14.5 |
| Manyata Tech Park | 13.5 |
| ITPL, Whitefield | 1.5 |
| Ecospace, Bellandur ORR | 10 |
| Electronic City Ph 1 | 18.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 2 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km, named Hoody Traction on OpenStreetMap |