| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | 1 | 1 | – | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 1 Lakh Multi - Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Apr 2023 |
| 99d By SanthustaActive · 100% built | M/s. SANTHUSTA INFRACON PRIVATE LIMITED | Plot | ~1,080–2,430 sqft (estimate: filed carpet plus 25%) | Jul 2028 |
| Adhya EnclaveLapsed · completion date passed | ADHYA DEVELOPERS | Plot | – | Dec 2023 |
| Affinity FidelityLapsed · completion date passed | SUDHAKARA REDDY ANNEM | Apartment | – | Jul 2022 |
| Affinity SarovarActive · 96% built | AFFINITY PROJECTS LLP | Apartment | 982–1,237 sqft carpet (as filed) | Sep 2027 |
| Alpine Pyramid EfghCompleted (regulator flag) |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 18 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | 2 | – | Review |
|---|
| Construction & progress | – | 1 | 1 | Review |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| ALPINE HOUSING DEVELOPMENT CORPORATION LIMITED |
| Apartment |
| 1,066 sqft carpet (as filed) |
| Completed |
| ArenaLapsed · completion date passed | Marudhar Infra | Mixed development | 628–1,053 sqft carpet (as filed) | Sep 2024 |
| Arvind Orchards (Phase 1 + 2)Applied for completion 05/10/2026 | Arvind SmartSpaces | Plot | 1,500–2,400 sqft | Dec 2029 |
8 of 89 other projects in Doddaballapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Oceanus Classic in the interactive atlas
Page 1
Page 1 of 4 of the encumbrance certificate. Filed with K-RERA: Latest Encumbrance Certificate, 4 pages, English.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Area on the KGIS map | Not verified yet | |
|---|---|---|
| Land area of this registration | 10,669 sq m | |
| Building plan (BDA) | Not verified yet | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration | |
| RERA extensions | Granted · Approved 17 Jan 2020 | |
|---|---|---|
| RERA complaints | 2 | |
| RERA completion date | 31 Dec 2026 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
| Forfeiture, agreement | 5% of the sale consideration | |
|---|---|---|
| Forfeiture, allotment letter | Not verified yet | |
| Transfer fee | Not verified yet | |
|---|---|---|
| Holding charge | Not verified yet | |
| Maintenance included | Not verified yet | |
| Defect liability | 1 year | |
| Sold, Q3 2025-26 | 91 / 201 | |
|---|---|---|
| Unsold, Q3 2025-26 | 110 |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Agriculture, at the filed pin | Review |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 22.7 km, Attur, Near Dairy Circle | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | 160 m to the north, Talagavara Kere | |
| Height above nearest drain | Not verified yet | |
| Club House, built | 100% | |
|---|---|---|
| Electricity, built | 100% | |
| Outdoor Sports facility, built | 100% | |
| Swimming Pool, built | 100% | |
| Parks, built | 100% | |
| Kitchen handover | Not verified yet | |
| Sewage plant | Not verified yet | |
| Power backup | Not verified yet | |

| Main structure | 100% · planned by 5 Dec 2015 | |
|---|---|---|
| Electrical and plumbing finishing | 100% · planned by 10 Jun 2016 | |
| Internal roads | Not verified yet | |
| Club house | 100% | |
| Completion | 99% | |
| Completion, accountant | 99.3% of the estimated cost spent | |
| Possession, agreement | Jun 2019 | |
|---|---|---|
| Schedule end | 30 Aug 2016 | |
| RERA completion date | 31 Dec 2026 | Review |
| Grace period for possession | 6 months | |
| Work began, as filed | 28 Jun 2013 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | External walls: 8" & 6"; Internal walls: 4" | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | Not verified yet | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | UPVC windows (sliding) | |
|---|---|---|
| Flooring | Vitrified tiles | |
| Toilet tiles | Anti-skid ceramic tiles (floor) | |
| Wiring | Concealed copper wiring | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Not verified yet | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026 | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Jan 2026 | |
Land · ₹27.69 Cr 40%Development · ₹41.54 Cr 60%
| Estimated cost | ₹69.23 Cr | |
|---|---|---|
| Estimated cost, Form 4 Q3 2025-26 | ₹47.34 Cr | |
| Cost incurred | ₹47.02 Cr (99.3% of the estimate) | |
| Cost left | ₹32.2 L | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹2.45 Cr | |
| Land cost revision | Not verified yet | |
Sold (91) 45.3%Unsold (110) 54.7%
| Sold, Q3 2025-26 | 91 / 201 · 110 available | |
|---|---|---|
| Unsold, Q3 2025-26 | 110 |
| Escrow bank | Axis Bank · BTM Layout, Bangalore | |
|---|---|---|
| Designated account, collected | ₹1.45 Cr in Q3 2025-26 | |
| Designated account, withdrawn | ₹1.01 Cr in Q3 2025-26 (70% of that quarter's deposits) | |
| Net amount withdrawable, Form 4 | ₹13,00,40,436 | |
| Withdrawn from the escrow account to date | ₹34,01,52,591 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 2 | |
| Developer's project loan |
|---|
| Not verified yet |
| Records searched to | Not verified yet | |
|---|---|---|
| Building plan | Not verified yet | |
|---|---|---|
| Unregistered agreements, over 10% paid | Not verified yet | |
|---|---|---|
| Sale deed in favour of | Not verified yet | |
|---|---|---|
| Escrow bank | Axis Bank · BTM Layout, Bangalore |
|---|

Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 31.2 m
Across Doddaballapura, the water table sat 20 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 31.2 m, and it recovered 4.7 m over the year.
| Groundwater | Doddaballapura taluk average, July 2023: 20 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 20 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority | |
| Nearest city water main | 20.3 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 19.2 km, Doddajala | |
| Kempegowda Airport | 24.0 |
| MG Road (CBD) | 37.9 |
| Manyata Tech Park | 31.2 |
| ITPL, Whitefield | 43.0 |
| Ecospace, Bellandur ORR | 45.9 |
| Electronic City Ph 1 | 54.8 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |