Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 6 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 45 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 3 | Clear |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 446 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
All 476 projects in Sarjapur Road → · Nambiar Builders's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Nambiar Millenia in the interactive atlas
Transfer of the land
Title deed executed
Sy 128/1, Sarjapura hobli
Title deed filed with K-RERA, pp. 1, 12 · See it in Documents
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/220202/004665
K-RERA registration ·
Transfer of the landTitle checkApproval or registration
Read from the original document
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 12 Jan 2021 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate.
| Filed survey numbers matched to the KGIS map | 2 of 2 | |
|---|---|---|
| Matched part of the survey number | 28,778 sq m | |
| The whole survey number on the KGIS map | 48,664 sq m | |
| Land area filed with K-RERA | 15,530 sq m | |
| Village, hobli and taluk on the KGIS map | Muttanalluru, Sarjapura-2 hobli, Anekal taluk | |
| Sketch dimensions | Not verified yet | |
| Sanctioned plan area | Not verified yet | |
| Mutation entry | Not verified yet | |
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Area on the KGIS map | Not verified yet | |
|---|---|---|
| Land area of this registration | 15,530 sq m | |
| Title deed | Sy 128/2, Muthanallur village, Sarjapura hobli, Anekal taluk | |
| Sy. No. 128/2 | 1 | 1 acre 19 guntas | 0 | |||
| Sy. No. 128/6 | 1 | 2 acres 15 guntas | 0 | |||
| Sy. No. 128/1 | 1 | 30 guntas | 0 | |||
| Sy. No. 128/4 | 1 | 17 guntas | 0 | |||
| Sy. No. 128/5 | 1 | 5 guntas | 0 | |||
| Sy. No. 131/3 | 1 | 5 guntas | 0 | |||
| Sy. No. 131/4 | 1 | 32 guntas | 0 | |||
| Sy. No. 131/7 | 1 | 32 guntas | 0 |
Valid as of this reportValidity ended
| Building plan (BDA) | Not verified yet | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC (1 of 2) | KSFES/NOC/390/2022 · issued 30 Dec 2022 · building height 44.98 m (Tower A, Tower C, Tower D), 29.98 m (Tower B) | Clear |
| Fire NOC (2 of 2) | KSFES/NOC/015/2021 · issued 1 Mar 2021 | Clear |
| Environmental clearance (1 of 2) | SEIAA 149 CON 2022 · EC identification no. EC23B038KA155109 · issued 8 Mar 2023 | Clear |
| Environmental clearance (2 of 2) | SEIAA 08 CON 2021 · issued 3 Aug 2021 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order W-351026 · issued 24 Oct 2025 · valid until 30 Jun 2030 | Clear |
| Water supply NOC | Filed with the registration | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Nov 2026 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
| Sold, Q4 2025-26 | 523 / 604 | |
|---|---|---|
| Unsold, Q4 2025-26 | 81 | |
| Months to sell, derived from filed bookings | 6 months |
| Vistar White Pearl | about 1 km | Locked | |
|---|---|---|---|
| Mahidhara Harmony | about 1 km | Locked | |
| Acorn Hive | about 1.5 km | Locked | |
| Engrace 3 | about 4 km | Locked | |
| Engrace 4 | about 4 km | Locked |
| Nambiar Millenia This project | This project is the point the others are measured from | 30 Nov 2026 | 87% (523 of 604) | Not verified yet |
|---|---|---|---|---|
| Vistar White Pearl | about 1 km | 31 Mar 2026 | 39% (18 of 46) | Locked |
| Mahidhara Harmony | about 1 km | 10 Sep 2026 | 62% (91 of 146) | Locked |
| Acorn Hive |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 7.5 km, Doddakannelli | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Club House, built | 100% | |
|---|---|---|
| Electricity, built | 100% | |
| Outdoor Sports facility, built | 100% | |
| Swimming Pool, built | 100% | |
| Parks, built | 100% | |
| Gas, built | 0% | |
| Air Conditioning And incerntion, built | 100% | |
| Kitchen handover | Not verified yet | |
| Sewage plant | Not verified yet | |
| Power backup | Not verified yet | |
Ten-year July mean for this taluk: 28.7 m
Across Anekal, the water table sat 21.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 28.7 m, and it recovered 3.3 m over the year.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 21.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Self development | |
| Nearest city water main | Not verified yet | |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |
As the promoter reported it

| Main structure | 100% · planned by 4 Nov 2024 | |
|---|---|---|
| Electrical and plumbing finishing | 100% · planned by 14 Dec 2025 | |
| Internal roads | Not verified yet | |
| Club house | 100% | |
| Completion | 100% | |
| Completion, accountant | 100% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 30 Nov 2026 | |
| RERA completion date | 30 Nov 2026 | |
| Work began, as filed | 4 Nov 2021 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 44.98 m (Tower A, Tower C, Tower D), 29.98 m (Tower B) on the fire NOC | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026 (2 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety (1 of 2) | KSFES/NOC/390/2022 · issued 30 Dec 2022 · building height 44.98 m (Tower A, Tower C, Tower D), 29.98 m (Tower B) | |
| Fire safety (2 of 2) | KSFES/NOC/015/2021 · issued 1 Mar 2021 | |
| Environmental clearance (1 of 2) | SEIAA 149 CON 2022 · EC identification no. EC23B038KA155109 · issued 8 Mar 2023 | |
| Environmental clearance (2 of 2) | SEIAA 08 CON 2021 · issued 3 Aug 2021 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026 (2 filed) | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹5.45 Cr 3.9%Development · ₹133.54 Cr 96.1%
| Estimated cost | ₹138.99 Cr | |
|---|---|---|
| Estimated cost, Form 4 Q4 2025-26 | ₹305.27 Cr | |
| Cost incurred | ₹305.27 Cr (100% of the estimate) | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹65.24 Cr | |
| Land cost revision | Not verified yet | |
Sold (523) 86.6%Unsold (81) 13.4%
| Sold, Q3 2025-26 | 484 / 604 · 120 available | |
|---|---|---|
| Sold, Q4 2025-26 | 523 / 604 · 81 available | |
| Unsold, Q4 2025-26 | 81 | |
| Sold in Q4 2025-26 | 39 |
| Escrow bank | ICICI Bank · JEEVAN BIMA NGR | |
|---|---|---|
| Designated account, collected | ₹38.89 Cr in Q4 2025-26 | |
| Designated account, withdrawn | ₹22.53 Cr in Q4 2025-26 (58% of that quarter's deposits) | |
| Amount withdrawable, Form 4 | ₹14,78,57,105 | |
| Net amount withdrawable, Form 4 | ₹74,18,368 | |
| Withdrawn from the escrow account to date | ₹2,75,79,30,387 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 9 | |
|---|---|---|
| Marked completed | 4 | |
| Past promised date, not completed | 1 | Clear |
| Complaints filed against the promoter | 0 |
| Developer's project loan | Not verified yet | |
|---|---|---|
| Records searched to | 12 Jan 2021 | Review |
| Building plan | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | ICICI Bank · JEEVAN BIMA NGR | |

| Engrace Vista | about 4 km | Locked |
|---|
| Sowmya Skyla | about 4 km | Locked |
|---|
| Signature Heights | about 4.5 km | Locked |
|---|
| Shriram Sapphire (Codename Ultimate) | about 4.5 km | Locked |
|---|
| Assetz Ren & Rei | about 5 km | Locked |
|---|
| Nambiar District 25 Phase 2 | about 5 km | Locked |
|---|
| Assetz Muse & Maison | about 5 km | Locked |
|---|
| about 1.5 km |
| 31 Dec 2026 |
| 89% (80 of 90) |
| Locked |
| Engrace 3 | about 4 km | 1 Jun 2026 | 100% (76 of 76) | Locked |
|---|
| Engrace 4 | about 4 km | 31 Dec 2026 | 100% (145 of 145) | Locked |
|---|
| Engrace Vista | about 4 km | 30 Dec 2028 | 46% (181 of 392) | Locked |
|---|
| Projects within 4 km, counted | 13 (13 with an approximate location) | |
|---|---|---|
| Flats in them | 1,783 | |
| Booked | 626 of 1,783 (35%) | |
| Unsold | 1,157 | |
| Booked a month, pooled | 23 flats | |
| Months to sell, pooled | 50 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | about 5 km, Bommasandra | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 40 |
| MG Road (CBD) | 20.5 |
| Manyata Tech Park | 26 |
| ITPL, Whitefield | 16.5 |
| Ecospace, Bellandur ORR | 11 |
| Electronic City Ph 1 | 6 |