| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 1 Lakhmulti Storey Housing Chikanahalli KamnahaliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| Aashrayaa Eco CityApplied for completion 06/08/2020 | AASHRAYAA PROJECTS | Plot | – | Sep 2019 |
| Adithya Homes Grand Phase 2Completed (regulator flag) | M/s.ADITHYA HOMES | Plot | ~1,520 sqft (estimate: filed carpet plus 25%) | Completed |
| Adithya Homes Grand Phase 3Completed (regulator flag) | M/S.ADITHYA HOMES | Plot | ~1,400–1,990 sqft (estimate: filed carpet plus 25%) | Completed |
| Adithya Homes Paradise Phase 2Applied for completion 09/01/2024 | ADITHYAHOMES | Plot | – | May 2024 |
| Adithya Homes Paradise Phase-3 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Survey | Land converted |
|---|
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 44 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | 1 | 1 | Review |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| M/s.ADITHYA HOMES |
| Plot |
| – |
| Completed |
| Adithya Homes Paradise Phase-4Lapsed · completion date passed | ADITHYA HOMES | Plot | ~1,200–1,600 sqft (estimate: filed carpet plus 25%) | Jun 2026 |
| Adithya Paradise -5Active · 100% built | PARADISE HOMES | Plot | ~1,200–1,750 sqft (estimate: filed carpet plus 25%) | Jun 2027 |
8 of 41 other projects in East Bengaluru, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open M1 Terra Alegria Phase 2 in the interactive atlas
| Sale deed |
|---|
| Khata |
|---|
| Extent |
|---|
| Survey 1 | ||||
|---|---|---|---|---|
| 1/6 | 12 Jan 2021DISTRICT COLLECTOR | 16 Jun 2021 | 20 Jul 2021E Khatha · GP | A0.01G / 101.17 SQMTR |
| 1/12, 1/13 | 12 Jan 2021DISTRICT COLLECTOR | 16 Jun 2021 | 20 Jul 2021E Khatha · GRAM PANCHAYAT | A0.05.5G / 556.435 SQ MTR + A0.05.5G / 556.435 SQ MTR |
| 96/1 | 28 Jul 2021DC | 19 Jul 2021 | 25 Aug 2021E Khatha · GP | A1.11.5G / 5210.255 SQ MTR |
|---|
| 100/2 | 12 Nov 2021DC | 26 Jul 2021 | 7 Sep 2021E Khatha · GP | A0.08G / 809.36 SQ MTR |
|---|
| Survey 101 | ||||
|---|---|---|---|---|
| 101/1 | 5 Aug 2021DC | 19 Jul 2021 | 6 Sep 2021E Khatha · GP | A0.09G / 910.53 SQ MTR |
| 101/2 | 12 Jan 2021DC | 16 Jun 2021 | 20 Jul 2021E Khatha · GP | A0.05G / 505.85 SQ MTR |
| 102/2 | 30 Nov 2020DC | 15 Feb 2021 | 11 May 2021E Khatha · GP | A0.01G / 202.34 SQ MTR |
|---|
| 25 | 28 Jul 2021DC | 19 Jul 2021 | 18 Aug 2021E Khatha · GP | A0.09G / 910.53 SQ MTR |
|---|
| Survey 26 | ||||
|---|---|---|---|---|
| 26/4 | 5 Aug 2020DC | 19 Jul 2021 | 18 Sep 2021E Khatha · GP | A0.37.5G / 3793.875 SQMTR |
| 26/12, 26/13 | 30 Nov 2020DC | 15 Feb 2021 | 22 Apr 2021E Khatha · GP | A0.01.5G / 151.755 SQ MTR + A0.01.5G / 151.755 SQ MTR |
| 26/15 | 17 Dec 2019DC | No sale deed | 12 Jun 2019E Khatha · GP | A0.17G / 1719.89 SQ MTR |
| Survey 32 | ||||
|---|---|---|---|---|
| 32/2 | 29 Oct 2018DC | 30 Jan 2019 | 30 Jan 2019E Khatha · GP | A0.37G / 3743.29 SQ MTR |
| 32/3 | 30 Jul 2018DC | 30 Jan 2019 | 30 Jan 2019E Khatha · GP | A0.09.25G / 935.8225 SQ MTR |
| 32/4 | 12 Dec 2019DC | 30 Oct 2021 | 30 Oct 2021E Khatha · GP | A0.37G / 3743.29 SQ MTR |
| 32/6 | 30 Jul 2018DC | 30 Jan 2019 | 30 Jan 2019E Khatha · GP | A0.09.25G / 935.8225 SQ MTR |
| 32/7 | 19 Sep 2018DC | 30 Jan 2019 | 30 Jan 2019E Khatha · GP | A0.09.25G / 935.8225 SQ MTR |
| 32/8 | 5 Dec 2020DC | 15 Feb 2021 | 15 Feb 2021E Khatha · GP | A0.09.25G / 935.8225 SQ MTR |
| Survey 34 | ||||
|---|---|---|---|---|
| 34/2 | 24 Jun 2019DC | No sale deed | 15 Dec 2021E Khatha · GP | A0.09G / 910.53 SQ MTR |
| 34/3 | 13 Oct 2020DC | No sale deed | 10 Dec 2018E Khatha · GP | A0.09.75G / 986.4075 SQ MTR |
| 34/4 | 21 Jun 2019DC | No sale deed | 15 Dec 2021E Khatha · GP | A1.04G / 4451.48 SQ MTR |
| 34/5 | 21 Jun 2019DC | No sale deed | 10 Dec 2018E Khatha · GP | A0.38G / 3844.46 SQ MTR |
| 34/8 | 13 Oct 2020DC | No sale deed | 10 Dec 2018E Khatha · GP | A0.03.25G / 328.8025 SQ MTR |
K-RERA filing, land schedule
Deeds read, and the whole project
Transfer of the land
Title deed executed
Sy 26/4, Shankanipura village, Kasaba hobli, Hoskote taluk · 17 Guntas
Title deed filed with K-RERA, pp. 1, 18 · See it in Documents
Transfer of the land
Title deed executed
Sy 34/3; 34/4; 37; 34/2, Shankanipura village, Hoskote taluk; Sy 34/5, Shankanipura village, Hoskote taluk
Title deed filed with K-RERA, pp. 1, 24 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹41.6 L · Sy 32/3, Shankanipura village, Kasaba hobli, Hoskote taluk
Title deed filed with K-RERA, pp. 1, 3, 7 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹41.6 L · Sy 32/7, Shankanipura village, Kasaba hobli
Title deed filed with K-RERA, pp. 1, 3, 7 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹92.5 L · Sy 32/2, Shankanipura village, Kasaba hobli, Hoskote taluk · 37 Guntas
Title deed filed with K-RERA, pp. 1, 5, 9 · See it in Documents
Transfer of the land
Title deed executed
Sy 32/6, Shankanipura village, Kasaba hobli, Hoskote taluk
Title deed filed with K-RERA, pp. 1, 7 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹39.4 L
Title deed filed with K-RERA, pp. 1, 3 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹39.4 L
Title deed filed with K-RERA, pp. 1, 3 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹41.6 L
Title deed filed with K-RERA, pp. 1, 3 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹76.5 L · Sy 26/12; 26/3, Shankanipura village, Kasaba hobli, Hoskote taluk; Sy 26/13; 26/4, Shankanipura village, Kasaba hobli, Hoskote taluk
Title deed filed with K-RERA, pp. 1, 3, 9 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹47.0 L · Sy 1/6, Kasaba hobli · 01 gunta; Sy 1/13, Kasaba hobli; and 1 more item
Title deed filed with K-RERA, pp. 1, 3, 7, 9 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹43.0 L · Sy 101/1, Alappanahalli village, Kasaba hobli · 09 Guntas
Title deed filed with K-RERA, pp. 1, 3, 7 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹2.29 Cr · Sy 96/1, Alappanahalli village, Kasaba hobli, Hoskote taluk
Title deed filed with K-RERA, pp. 1, 3, 7 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹43.0 L · Sy 25, Shankanipura village, Kasaba hobli, Hoskote taluk · 09 Guntas
Title deed filed with K-RERA, pp. 1, 3, 7 · See it in Documents
Transfer of the land
Title deed executed
Sy 26/4, Shankanipura village, Kasaba hobli, Hoskote taluk
Title deed filed with K-RERA, pp. 1, 7 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹43.0 L
Title deed filed with K-RERA, pp. 1, 5 · See it in Documents
Transfer of the land
Title deed executed
Sy 34/4, Shankanipura village, Kasaba hobli, Hoskote taluk · 01 Acre 04 Guntas
Title deed filed with K-RERA, pp. 1, 16 · See it in Documents
Approval or registration
Building plan sanctioned
BMRDA · plan HPA/ LAO/23/2021-22
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1250/304/PR/091122/005424
K-RERA registration
Approval or registrationTransfer of the landTitle check
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 13 Feb 2025 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 1/6, 1-12, 1/13, 96/1, 100/2, 101/1 and 18 more | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Khata | E Khatha · GP · 20 Jul 2021; E Khatha · GRAM PANCHAYAT · 20 Jul 2021; E Khatha · GP · 25 Aug 2021; and 12 more | |
| Sale deed | Dated 30 Jan 2019, 15 Feb 2021, 16 Jun 2021 and 3 more | |
| Title deed | Consideration ₹2.17 Cr · Sy 32/4, Kasaba hobli, Hoskote taluk · 37 Guntas | |
| Building plan (BMRDA) | Sanctioned 16 May 2022 · No. HPA/ LAO/23/2021-22 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Jun 2026 |
| Land conversion | 24 of 24 parcels converted | |
|---|---|---|
| Sy 1/6, 1-12, 1/13 | Converted 12 Jan 2021 · DISTRICT COLLECTOR | |
| Sy 96/1, 25 | Converted 28 Jul 2021 · DC | |
| Sy 100/2 | Converted 12 Nov 2021 · DC | |
| Sy 101/1 | Converted 5 Aug 2021 · DC | |
| Sy 101/2 | Converted 12 Jan 2021 · DC | |
| Sy 102/2, 26/12, 26/13 | Converted 30 Nov 2020 · DC | |
| Other parcels | 10 more groups on the filing | |
| Survey numbers | 1/6 · 1-12 · 1/13 · 96/1 · 100/2 · 101/1 · 101/2 · 102/2 · 25 · 26/4 · 26/12 · 26/13 · 26/15 · 32/2 · 32/3 · 32/4 · 32/6 · 32/7 · 32/8 · 34/2 · 34/3 · 34/4 · 34/5 and 1 more parcels |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
| Neighbourhood Tree Park | about 4 km | Locked | |
|---|---|---|---|
| Sowparnika Indradhanush Phase I | about 4 km | Locked | |
| Sowparnika Shivadhanush | about 4 km | Locked | |
| Definer Upper Deck | about 4.5 km | Locked | |
| M1 Terra Alegria Phase 2 This project | This project is the point the others are measured from | 30 Jun 2026 | Not filed | Not verified yet |
|---|---|---|---|---|
| Neighbourhood Tree Park | about 4 km | 31 Dec 2028 | 27% (25 of 93) | Locked |
| Sowparnika Indradhanush Phase I | about 4 km | 31 May 2027 | 99% (567 of 570) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 10.5 km, TRIVENI NAGAR NEAR KR PURAM | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 1 km, Dakshina Pinakini, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 62 m
Across Hosakote, the water table sat 22.6 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 62 m, and it recovered 4.9 m over the year.
| Groundwater | Hosakote taluk average, July 2023: 22.6 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 22.6 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, Local authority (GRAM PANCHAYAT) | |
| Nearest city water main | Not verified yet | |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |
As the promoter reported it

| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 100% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 30 Jun 2026 | Review |
| Work began, as filed | 1 Jul 2022 | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Feb 2026, Apr 2026, Apr 2026 (3 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect's certificate, registration | Dated 2 Apr 2025 · site inspected 2 Apr 2025 | |
| Engineer's certificate, registration | Dated 14 Feb 2025 | |
| Chartered accountant's certificate, registration | Dated 19 May 2025 | |
| Chartered accountant, Form 4 | Dated 6 Apr 2026 | |
Land · ₹13.08 Cr 29.8%Development · ₹30.84 Cr 70.2%
| Estimated cost | ₹43.93 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹22.50 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Flats booked, Form 4 Q1 2026-27 | 78 |
|---|
| Escrow bank | HDFC · VARTHUR | |
|---|---|---|
| Designated account, collected | ₹15.0 L in Q1 2026-27 | |
| Designated account, withdrawn | ₹10.5 L in Q1 2026-27 (70% of that quarter's deposits) | |
| Net amount withdrawable, Form 4 | ₹37,33,00,780 | |
| Withdrawn from the escrow account to date | ₹41,56,18,846 | |
| Share of collections deposited in escrow | 70% | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | Not verified yet | |
|---|---|---|
| Records searched to | 13 Feb 2025 | |
| Building plan (BMRDA) | Sanctioned 16 May 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | HDFC · VARTHUR | |

| Triaxis Splendour + |
|---|
| about 4.5 km |
| Locked |
| One Residences At Sobha One World Ph4 W7 And 8 | about 5 km | Locked |
|---|
| One Residences At Sobha One World Ph5 W9,10,11 | about 5 km | Locked |
|---|
| One Residences At Sobha One World Ph6 W12,13,14 | about 5 km | Locked |
|---|
| Riqueza Siri | about 5 km | Locked |
|---|
| Chaithanya Sankhya | about 5.5 km | Locked |
|---|
| Godrej Parkshire (Hoskote) | about 6.5 km | Locked |
|---|
| Godrej Woodscapes | about 6.5 km | Locked |
|---|
| Sowparnika Shivadhanush | about 4 km | 30 Nov 2027 | 99% (357 of 360) | Locked |
|---|
| Definer Upper Deck | about 4.5 km | 31 Dec 2025 | 71% (78 of 110) | Locked |
|---|
| Triaxis Splendour + | about 4.5 km | 31 Dec 2026 | 57% (59 of 104) | Locked |
|---|
| One Residences At Sobha One World Ph4 W7 And 8 | about 5 km | 30 Sep 2033 | 22% (98 of 440) | Locked |
|---|
| Projects within 4 km, counted | 3 (3 with an approximate location) | |
|---|---|---|
| Flats in them | 161 | |
| Booked | 53 of 161 (33%) | |
| Unsold | 108 | |
| Booked a month, pooled | 2 flats | |
| Months to sell, pooled | 51 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 1 km, Dakshina Pinakini, primary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 12 km, Whitefield | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 13 |
| MG Road (CBD) | 23.5 |
| Manyata Tech Park | 18 |
| ITPL, Whitefield | 13.5 |
| Ecospace, Bellandur ORR | 22 |
| Electronic City Ph 1 | 31 |