Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| 1 Lakhmulti Storey Housing Chikanahalli KamnahaliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| Aashrayaa Eco CityApplied for completion 06/08/2020 | AASHRAYAA PROJECTS | Plot | – | Sep 2019 |
| Adithya Homes Grand Phase 2Completed (regulator flag) | M/s.ADITHYA HOMES | Plot | ~1,520 sqft (estimate: filed carpet plus 25%) | Completed |
| Adithya Homes Grand Phase 3Completed (regulator flag) | M/S.ADITHYA HOMES | Plot | ~1,400–1,990 sqft (estimate: filed carpet plus 25%) | Completed |
| Adithya Homes Paradise Phase 2Applied for completion 09/01/2024 | ADITHYAHOMES | Plot | – | May 2024 |
| Adithya Homes Paradise Phase-3 |
Title & ownership
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 49 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Valuation |
|---|
| – |
| – |
| – |
| Not verified |
| Location & risks | – | 2 | 1 | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| M/s.ADITHYA HOMES |
| Plot |
| – |
| Completed |
| Adithya Homes Paradise Phase-4Lapsed · completion date passed | ADITHYA HOMES | Plot | ~1,200–1,600 sqft (estimate: filed carpet plus 25%) | Jun 2026 |
| Adithya Paradise -5Active · 100% built | PARADISE HOMES | Plot | ~1,200–1,750 sqft (estimate: filed carpet plus 25%) | Jun 2027 |
8 of 41 other projects in East Bengaluru, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Vr Royal Township in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
| Building plan (BMRDA) | Sanctioned 28 Mar 2024 · No. LAO/18/2023-24 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Airport height NOC | Not verified yet | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2026 |
| Land conversion | 34 of 34 parcels converted | |
|---|---|---|
| Sy SY No 2/3, Sy No 2/4, SY no 7/3,… | Converted 14 Sep 2022 · DC Conversion,Bangalore Rural | |
| Sy SY No 5/1, Sy No 5/1, SY no 5/2,… | Converted 2 Nov 2022 · DC Conversion,Bangalore Rural | |
| Sy SY no 5/2 | Converted 22 Nov 2022 · DC Conversion,Bangalore Rural | |
| Sy SY No 7/1 | Converted 27 Feb 2023 · DC Conversion,Bangalore Rural | |
| Sy Sy No 7/2, SY no 183, Sy No 184,… | Converted 11 Apr 2023 · DC Conversion,Bangalore Rural | |
| Sy SY No 183, SY no 184, SY No 186,… | Converted 14 Aug 2023 · DC Conversion,Bangalore Rural | |
| Other parcels | 3 more groups on the filing | |
| Survey numbers | SY No 2/3 · Sy No 2/4 · SY No 5/1 · Sy No 5/1 · SY no 5/2 · SY no 5/2 · Sy No 6/1 · SY no 6/1 · SY no 6/2 · Sy No 6/2 · SY No 7/1 · Sy No 7/2 · SY no 7/3 · Sy No 8 and 20 more parcels |
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
| Sowparnika Indradhanush Phase I | about 5.5 km | Locked | |
|---|---|---|---|
| Sowparnika Shivadhanush | 5.7 km | Locked | |
| Triaxis Splendour + | about 7.5 km | Locked | |
| Riqueza Siri | about 9 km | Locked | |
| Godrej Parkshire (Hoskote) |
| Vr Royal Township This project | This project is the point the others are measured from | 31 Dec 2026 | Not filed | Not verified yet |
|---|---|---|---|---|
| Sowparnika Indradhanush Phase I | about 5.5 km | 31 May 2027 | 99% (567 of 570) | Locked |
| Sowparnika Shivadhanush | 5.7 km | 30 Nov 2027 | 99% (357 of 360) | Locked |
| Projects within 4 km, counted | 1 (1 with an approximate location) | |
|---|---|---|
| Flats in them | 1,037 | |
| Booked | 1,028 of 1,037 (99%) | |
| Unsold | 9 |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest high-tension line | A 66 kV line passes 60 m from the filed location: close enough that its corridor may cross the site | Review |
| Nearest government-flagged flood location | 17.3 km, SIDDHARTHA LAYOUT KADUGODI | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | 430 m to the east, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
As the promoter reported it

| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 77% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 31 Dec 2026 | |
| Work began, as filed | 1 May 2024 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Feb 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect's certificate, registration | Site inspected 8 Jun 2024 | |
| Engineer's certificate, registration | Dated 8 Jun 2024 | |
| Chartered accountant's certificate, registration | Dated 7 Jun 2024 | |
| Chartered accountant, Form 4 | Dated 13 Jul 2026 | |
Land · ₹18.00 Cr 47.3%Development · ₹20.09 Cr 52.7%
| Estimated cost | ₹38.08 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹18.59 Cr | |
| Cost incurred | ₹25.89 Cr | |
| Cost left | ₹12.19 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Flats booked, Form 4 Q4 2025-26 | 103 |
|---|
| Escrow bank | Canara Bank · SME HOSKOTE | |
|---|---|---|
| Designated account, collected | ₹31.18 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹31.18 Cr in Q2 2026-27 (100% of that quarter's deposits) | |
| Amount withdrawable, Form 4 | ₹7,89,41,266 | |
| Escrow account to date, Q3 2025-26 | ₹6.96 Cr withdrawn | |
| Share of collections deposited in escrow | 55% | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 5 | |
|---|---|---|
| Marked completed | 0 | |
| Past promised date, not completed | 2 | |
| Complaints filed against the promoter | 1 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BMRDA) | Sanctioned 28 Mar 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Canara Bank · SME HOSKOTE | |

| 11.5 km |
| Locked |
| One Residences At Sobha One World Ph4 W7 And 8 | about 11.5 km | Locked |
|---|
| One Residences At Sobha One World Ph5 W9,10,11 | about 11.5 km | Locked |
|---|
| One Residences At Sobha One World Ph6 W12,13,14 | about 11.5 km | Locked |
|---|
| Triaxis Splendour + | about 7.5 km | 31 Dec 2026 | 57% (59 of 104) | Locked |
|---|
| Riqueza Siri | about 9 km | 30 Nov 2027 | 52% (66 of 128) | Locked |
|---|
| Godrej Parkshire (Hoskote) | 11.5 km | 31 Dec 2030 | 54% (614 of 1,132) | Locked |
|---|
| One Residences At Sobha One World Ph4 W7 And 8 | about 11.5 km | 30 Sep 2033 | 22% (98 of 440) | Locked |
|---|
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 62 m
Across Hosakote, the water table sat 22.6 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 62 m, and it recovered 4.9 m over the year.
| Groundwater | Hosakote taluk average, July 2023: 22.6 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 22.6 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, Local authority (Chokkahalli Grama Panchayathi) | |
| Nearest city water main | 14.5 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | 17.9 km, Whitefield | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 18.6 |
| MG Road (CBD) | 32.3 |
| Manyata Tech Park | 27.3 |
| ITPL, Whitefield | 20.1 |
| Ecospace, Bellandur ORR | 29.2 |
| Electronic City Ph 1 | 37.1 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 2.7 km to the west |