Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | 1 | 5 | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 35 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 379 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open S.V.Prime in the interactive atlas
Approval or registration
Land use converted
Karnataka Circar · Survey 38
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 38
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl dir/JD/Central/0013/19-20
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/230522/004896
K-RERA registration ·
Approval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Page 1
Page 1 of 1 of the encumbrance certificate. Filed with K-RERA: Latest Encumbrance Certificate, 1 page, English.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 38 | |
|---|---|---|
| Land extent, Sy 38 | 2 Acre, 20 Guntas / 9599.16 sq meter | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 9,599 sq m | |
| Khata | A Khatha · BBMP · 28 Dec 2019 | |
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 1 Sep 2020 · No. BBMP/Addl dir/JD/Central/0013/19-20 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/234/2019 · building height 43.09 m | Clear |
| Environmental clearance | SEIAA 66 CON 2019 · issued 11 Dec 2019 | Clear |
| Airport height NOC | NOC ID BIAL/SOUTH/B/052019/398352 · issued 4 Jun 2019 · permissible top elevation 954.35 m above mean sea level · valid until 3 Jun 2027 | Clear |
| Pollution board (CFE) | consent order AW-350635 · issued 19 Sep 2025 · valid until 30 Jun 2030 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | Applied for · Applied 25 Nov 2025 | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Nov 2025 |
| Land conversion | Converted 26 Jul 2018 · Karnataka Circar | |
|---|---|---|
| Survey numbers | 38 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Flats · avg 72 m² 100%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| Flats | 256 | 776 |
| Sold, Q3 2025-26 | 178 / 260 | |
|---|---|---|
| Unsold, Q3 2025-26 | 82 |
| Assetz 66 & Shibui | about 1 km | Locked | |
|---|---|---|---|
| Axis Ekatva | about 1.5 km | Locked | |
| Sobha Windsor Phase 3 Wing 6, 7 And 8 | about 1.5 km | Locked | |
| Vintage Valley | about 1.5 km | Locked | |
| Sobha Windsor Phase 4 Wing 9, 10 And 11 |
| S.V.Prime This project | This project is the point the others are measured from | 30 Nov 2025 | 68% (178 of 260) | Not verified yet |
|---|---|---|---|---|
| Assetz 66 & Shibui | about 1 km | 30 Jun 2028 | 75% (77 of 102) | Locked |
| Axis Ekatva | about 1.5 km | 30 Jun 2029 | 8% (23 of 287) | Locked |
| Sobha Windsor Phase 3 Wing 6, 7 And 8 |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 1 km, GANDHIPURAM NEAR WHITE FIELD | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 100% | |
| Electricity, built | 100% | |
| Indoor Sports facility, built | 100% | |
| Gym, built | 100% | |
| Power Backup, built | 100% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.23 (315 covered spaces for 256 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | Not verified yet | |

| Main structure | 100% · planned by 9 Jul 2023 | |
|---|---|---|
| Electrical and plumbing finishing | 100% · planned by 10 Aug 2024 | |
| Internal roads | Not verified yet | |
| Club house | 100% | |
| Completion | 100% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 9 Dec 2024 | |
| RERA completion date | 30 Nov 2025 | |
| Work began, as filed | 1 Dec 2021 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 43.09 m on the fire NOC · 45 m filed, 3 towers | |
| Windows | UPVC windows | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 64.07 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Nov 2025 | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/234/2019 · building height 43.09 m | |
| Environmental clearance | SEIAA 66 CON 2019 · issued 11 Dec 2019 | |
| Architect, quarterly | Form 5 · Nov 2025 | |
| Architect's certificate, registration | Dated 2 Nov 2021 · site inspected 2 Nov 2021 | |
| Engineer's certificate, registration | Dated 2 Nov 2021 | |
Land · ₹32.26 Cr 17.2%Development · ₹155.30 Cr 82.8%
| Estimated cost | ₹187.56 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (178) 68.5%Unsold (82) 31.5%
| Sold, Q3 2025-26 | 178 / 260 · 82 available | |
|---|---|---|
| Unsold, Q3 2025-26 | 82 |
| Escrow bank | Karnataka Bank Ltd. · Nehru Nagar | |
|---|---|---|
| Designated account, collected | ₹4.17 Cr in Q3 2025-26 | |
| Designated account, withdrawn | ₹4.99 Cr in Q3 2025-26 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 1 Sep 2020 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Karnataka Bank Ltd. · Nehru Nagar | |

| about 2 km |
| Locked |
| Sobha Windsor Phase 2 Wing 3, 4 And 5 | about 2 km | Locked |
|---|
| Reflections 66 | about 2 km | Locked |
|---|
| Vaswani Starlight | about 2 km | Locked |
|---|
| Coevolve Misty Shores | about 2 km | Locked |
|---|
| Nirmaanika Aria | about 2.5 km | Locked |
|---|
| Godrej Splendour | about 3 km | Locked |
|---|
| Godrej Splendour Phase II | about 3.5 km | Locked |
|---|
| about 1.5 km |
| 30 Sep 2027 |
| 100% (192 of 192) |
| Locked |
| Vintage Valley | about 1.5 km | 31 Jan 2030 | 56% (27 of 48) | Locked |
|---|
| Sobha Windsor Phase 4 Wing 9, 10 And 11 | about 2 km | 31 Mar 2028 | 100% (210 of 210) | Locked |
|---|
| Sobha Windsor Phase 2 Wing 3, 4 And 5 | about 2 km | 30 Apr 2026 | 100% (197 of 197) | Locked |
|---|
| Projects within 4 km, counted | 75 (75 with an approximate location) | |
|---|---|---|
| Flats in them | 25,862 | |
| Booked | 16,825 of 25,862 (65%) | |
| Unsold | 9,037 | |
| Booked a month, pooled | 320 flats | |
| Months to sell, pooled | 27 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 0.5 km, Channasandra | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 24.5 |
| MG Road (CBD) | 17 |
| Manyata Tech Park | 16.5 |
| ITPL, Whitefield | 2 |
| Ecospace, Bellandur ORR | 10.5 |
| Electronic City Ph 1 | 18 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 2 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km, named BMRCL RSS on OpenStreetMap |